871 resultados para Political- Pedagogical Project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aims: To describe a local data linkage project to match hospital data with the Australian Institute of Health and Welfare (AIHW) National Death Index (NDI) to assess longterm outcomes of intensive care unit patients. Methods: Data were obtained from hospital intensive care and cardiac surgery databases on all patients aged 18 years and over admitted to either of two intensive care units at a tertiary-referral hospital between 1 January 1994 and 31 December 2005. Date of death was obtained from the AIHW NDI by probabilistic software matching, in addition to manual checking through hospital databases and other sources. Survival was calculated from time of ICU admission, with a censoring date of 14 February 2007. Data for patients with multiple hospital admissions requiring intensive care were analysed only from the first admission. Summary and descriptive statistics were used for preliminary data analysis. Kaplan-Meier survival analysis was used to analyse factors determining long-term survival. Results: During the study period, 21 415 unique patients had 22 552 hospital admissions that included an ICU admission; 19 058 surgical procedures were performed with a total of 20 092 ICU admissions. There were 4936 deaths. Median follow-up was 6.2 years, totalling 134 203 patient years. The casemix was predominantly cardiac surgery (80%), followed by cardiac medical (6%), and other medical (4%). The unadjusted survival at 1, 5 and 10 years was 97%, 84% and 70%, respectively. The 1-year survival ranged from 97% for cardiac surgery to 36% for cardiac arrest. An APACHE II score was available for 16 877 patients. In those discharged alive from hospital, the 1, 5 and 10-year survival varied with discharge location. Conclusions: ICU-based linkage projects are feasible to determine long-term outcomes of ICU patients

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While the studio is widely accepted as the learning environment where architecture students most effectively learn how to design (Mahgoub, 2007:195), there are surprisingly few studies that attempt to identify in a qualitative way the interrelated factors that contribute to and support design studio learning (Bose, 2007:131). Such a situation seems problematic given the changes and challenges facing education including design education. Overall, there is growing support for re-examining (perhaps redefining) the design studio particularly in response to the impact of new technologies but as this paper argues this should not occur independently of the other elements and qualities comprising the design studio. In this respect, this paper describes a framework developed for a doctoral project concerned with capturing and more holistically understanding the complexity and potential of the design studio to operate within an increasingly and largely unpredictable global context. Integral to this is a comparative analysis of selected cases underpinned by grounded theory methodology of the traditional design studio and the virtual design studio informed by emerging pedagogical theory and the experiences of those most intimately involved – students and lecturers. In addition to providing a conceptual model for future research, the framework is of value to educators currently interested in developing as well as evaluating learning environments for design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Silk Road Project was a practice-based research project investigating the potential of motion capture technology to inform perceptions of embodiment in dance performance. The project created a multi-disciplinary collaborative performance event using dance performance and real-time motion capture at Deakin University’s Deakin Motion Lab. Several new technological advances in producing real-time motion capture performance were produced, along with a performance event that examined the aesthetic interplay between a dancer’s movement and the precise mappings of its trajectories created by motion capture and real-time motion graphic visualisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The topic of corruption has recently attracted a great deal of attention, yet there is still a lack of micro level empirical evidence regarding the determinates of corruption. Furthermore, the present literature has not investigated the effects of political interest on corruption despite the interesting potential of this link. We address these deficiencies by analysing a cross-section of individuals, using the World Values Survey. We explore the determinants of corruption through two dependant variables (perceived corruption and the justifiability of corruption). The impact of political interest on corruption is explored through three different proxies presenting empirical evidence at both the cross-country level and the within-country level.The results of the multivariate analysis suggest that political interest has an impact on corruption controlling for a huge number of factors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Much has been said about Chinese corporate governance and the new laws on companies. While most literature focuses on either the political or the legal doctrinal issues, this paper argues that Chinese traditional values do matter in Chinese corporate governance. The object of this paper is to report on the preliminary findings of a project supported by the General Research Fund in Hong Kong (HK). Thus far the survey results from HK respondents support our hypothesis. As such, traditional Chinese values should be on the agenda of the next round of company law reforms in China.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The field was the curation of new media within large-scale exhibition practice for Chinese audiences. The context was improved understandings of the intertwining cultures and concerns of Chinese and Western contemporary practitioners. The research uncovered a range of connective and dialogical concerns around cultural displacement and re-identification, germane to the chosen group of media artists. The methodology was principally practice-led. The research brought together 31 practitioners from Asian, European and Australasian cultures within a major highly visible Chinese exhibition context. By identifying and promoting a distinct commonality within difference amongst the diverse practitioners the exhibition successfully activated a global dialogue that incorporated environmental and cultural identity agendas within a major Chinese educational and public context - thereby promulgating cross-cultural understanding, despite the often oppressive shadowing of domestic political processes. The project was developed under the international aegis of IDA Projects (established since 1999) and was substantially supported by the Fine Art Department of the Beijing Film Academy, QUT Precincts and Platform China Art Institute. It built upon IDA’s 2005 inaugural new media exhibition at the ‘Today Art’ Museum in Beijing – now recognised as one of the leading art spaces in China. Numerous peer-reviewed grants won included the Australian Embassy in China and the Australia China Council. Through subsequent invitations from external curators the work then traveled in a range of reconfigured formats to other major venues including the Block Gallery at QUT, Brisbane and ZAIM Artspace, Yokohama Japan. A major catalogue with authoritative essays was also printed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We study an overlapping-generations model in which agents' mortality risks, and consequently impatience, are endogenously determined by private and public investment in health care. Revenues allocated for public health care arc determined by a voting process. We find that the degree of substitutability between public and private health expenditures matters for macroeconomic outcomes of the model. Higher substitutability implies a “crowding-out" effect, which in turn impacts adversely on morality risks and impatience leading to lower public expenditures on health care in the political equilibrium. Consequently, higher substitutability is associated with greater polarization in wealth, and long-run distributions that are bimodal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we examine the dynamics of the link between inequality and inflation from a political economy perspective. We consider a simple dynamic general equilibrium model in which agents vote over the desired inflation rate in each period, and inequality is persistent. Inflation in our model is a mechanism of redistribution, and we find that the link between inequality and inflation within any period or over time depends on institutional and preference related parameters. Furthermore, we find that differences in the initial distributions of wealth can yield a diverse set of patterns for the evolution of the inflation and inequality link. Relative to existing literature, our model leads to more precise predictions about the inflation-inequality correlation. To that end, results in the extant empirical literature on the inflation and inequality link need to be interpreted with caution.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper explains, somewhat along a Simmelian line, that political theory may produce practical and universal theories like those developed in theoretical physics. The reasoning behind this paper is to show that the Element of Democracy Theory may be true by way of comparing it to Einstein’s Special Relativity – specifically concerning the parameters of symmetry, unification, simplicity, and utility. These parameters are what make a theory in physics as meeting them not only fits with current knowledge, but also produces paths towards testing (application). As the Element of Democracy Theory meets these same parameters, it could settle the debate concerning the definition of democracy. This will be shown firstly by discussing why no one has yet achieved a universal definition of democracy; secondly by explaining the parameters chosen (as in why these and not others confirm or scuttle theories); and thirdly by comparing how Special Relativity and the Element of Democracy match the parameters.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the Good Friday Agreement of 1998, large sums have been invested in community theatre projects in Northern Ireland, in the interests of conflict transformation and peace building. While this injection of funds has resulted in an unprecedented level of applied theatre activity, opportunities to maximise learning from this activity are being missed. It is generally assumed that project evaluation is undertaken at least partly to assess the degree of success of projects against important social objectives, with a view to learning what works, what does not, and what might work in the future. However, three ethnographic case studies of organisations delivering applied theatre projects in Northern Ireland indicate that current processes used to evaluate such projects are both flawed and inadequate for this purpose. Practitioners report that the administrative work involved in applying for and justifying funding is onerous, burdensome, and occurs at the expense of artistic activity. This is a very real concern when the time and effort devoted to ‘filling out the forms’ does not ultimately result in useful evaluative information. There are strong disincentives for organisations to report honestly on their experiences of difficulties, or undesirable impacts of projects, and this problem is not transcended by the use of external evaluators. Current evaluation processes provide little opportunity to capture unexpected benefits of projects, and small but significant successes which occur in the context of over-ambitious objectives. Little or no attempt is made to assess long-term impacts of projects on communities. Finally, official evaluation mechanisms fail to capture the reflective practice and dialogic analysis of practitioners, which would richly inform future projects. The authors argue that there is a need for clearer lines of communication, and more opportunities for mutual learning, among stakeholders involved in community development. In particular, greater involvement of the higher education sector in partnership with government and non-government agencies could yield significant benefits in terms of optimizing learning from applied theatre project evaluations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the outcomes of a project undertaken by the VACCHO Public Health Research Unit to explore ways to build capacity in Aboriginal and Torres Strait Islander social determinants research. The project was funded by the Cooperative Research Centre for Aboriginal Health.----- The project involved a series of four social determinants research workshops conducted in July and August 2009 and a collaborative forum conducted in September 2009. Invitations to participate were extended to the VACCHO membership and the nine universities in Victoria. Three workshops were held with ACCHOs (in Bendigo, Melbourne and Gippsland), and one workshop with universities (in Melbourne).----- The workshops aimed to build VACCHO’s social determinants research capacity and provide direction for VACCHO on ways to more effectively engage in Aboriginal health research. Through the workshops, VACCHO aimed to work with ACCHOs to identify research processes and issues that are equitable and sustainable, and which address the social determinants of health.----- At the workshops, participants explored questions around the priorities for the social determinants of Aboriginal health and considered the key partnerships that might be important to social determinants research.----- At the workshops with ACCHOs, participants identified key research priorities and questions in Aboriginal social determinants and health. This focus reflects the need for Aboriginal and Torres Strait Islander community representatives to identify the priorities in health and social determinants research. Identifying these priorities is important if researchers are to respond in a meaningful way and undertake relevant research in the most urgent areas of need. At the university workshop, participants focused on identifying research process and implementation issues in social determinants research.----- The final forum brought together ACCHOs, university representatives, invited presenters and participants from justice, education and housing departments, and representatives from non-government funding organisations. The forum aimed to provide an insight into how priorities and funding decisions are made, and how research can help to ensure they are influenced by the priorities of the community. The findings from the workshops were presented at the forum and used to develop pathways for future research.