949 resultados para Parallel programming (computer)
Resumo:
Nowadays despite improvements in usability and intuitiveness users have to adapt to the proposed systems to satisfy their needs. For instance, they must learn how to achieve tasks, how to interact with the system, and fulfill system's specifications. This paper proposes an approach to improve this situation enabling graphical user interface redefinition through virtualization and computer vision with the aim of increasing the system's usability. To achieve this goal the approach is based on enriched task models, virtualization and picture-driven computing.
Resumo:
Dental implant recognition in patients without available records is a time-consuming and not straightforward task. The traditional method is a complete user-dependent process, where the expert compares a 2D X-ray image of the dental implant with a generic database. Due to the high number of implants available and the similarity between them, automatic/semi-automatic frameworks to aide implant model detection are essential. In this study, a novel computer-aided framework for dental implant recognition is suggested. The proposed method relies on image processing concepts, namely: (i) a segmentation strategy for semi-automatic implant delineation; and (ii) a machine learning approach for implant model recognition. Although the segmentation technique is the main focus of the current study, preliminary details of the machine learning approach are also reported. Two different scenarios are used to validate the framework: (1) comparison of the semi-automatic contours against implants manual contours of 125 X-ray images; and (2) classification of 11 known implants using a large reference database of 601 implants. Regarding experiment 1, 0.970.01, 2.240.85 pixels and 11.126 pixels of dice metric, mean absolute distance and Hausdorff distance were obtained, respectively. In experiment 2, 91% of the implants were successfully recognized while reducing the reference database to 5% of its original size. Overall, the segmentation technique achieved accurate implant contours. Although the preliminary classification results prove the concept of the current work, more features and an extended database should be used in a future work.
Resumo:
Este Trabalho refere-se ao Projecto de Execuo de Fundaes e Estruturas de uma Ponte Rodoviria em beto armado pr-esforado, realizado no mbito do Trabalho Final de Mestrado em Engenharia Civil Especializao em Estruturas, do Instituto Superior de Engenharia de Lisboa. O Projecto de Execuo composto de Peas Escritas e Peas Desenhadas. Nas Peas Escritas esto includos: Memria Justificativa e Descritiva; Clculos Justificativos e Anexos. A ponte composta por dois tabuleiros paralelos com 10,28m de largura cada um e afastados entre si de 0,10m. A obra constituda de 8 tramos; os tramos correntes com 31m de comprimento e os tramos extremos com 25 e 20m de comprimento, perfazendo um comprimento total de 231m. A obra foi parcialmente isolada dos sismos pela introduo, em todos os pilares, de aparelhos de apoio de elevado amortecimento ssmico do tipo HDRB (High Damping Rubber Bearings). Encontram-se particularmente discriminadas e detalhadas neste projecto as seguintes situaes: - Clculo do Pr-esforo e respectivas perdas; - Aco das sobrecargas rodovirias; - Diferena de comportamento da obra na entrada em servio e no longo prazo; - Anlise ssmica e do isolamento ssmico; - Estudo dos efeitos diferidos: retraco e fluncia. Tendo as abordagens de clculo e as verificaes de segurana seguido a regulamentao nacional em vigor, nomeadamente RSA e REBAP, foi no entanto feita uma aproximao s regras do Capacity Design previstas no EC8, em que se privilegia a actuao do projectista sobre o comportamento da estrutura, procurando uma resposta no linear da mesma, visando garantir que: - A rotura no ocorrer nos elementos de fundao; - Nos pilares a dissipao de energia se faz atravs de rtulas plsticas, evitando-se roturas associadas a esforos transversos. A aplicao destas regras neste Projecto demonstrou haver um agravamento substancial na definio dos esforos a que devem resistir alguns dos componentes da estrutura, designadamente os pilares e as fundaes, originando solues de seces de beto e armaduras bem mais exigentes do que aqueles que resultariam da simples verificao de segurana, pela comparao entre esforos actuante e esforos resistentes seco a seco, imposta pela actual regulamentao nacional.
Resumo:
O presente trabalho teve como principal objectivo o desenvolvimento de um analisador de vibraes de dois canais baseado em computador, para a realizao de diagnstico no mbito do controlo de condio de mquinas. Foi desenvolvida uma aplicao num computador comum, no software LabVIEW, que atravs de transdutores de acelerao do tipo MEMS conectados via USB, faz a recolha de dados de vibrao e procede ao seu processamento e apresentao ao utilizador. As ferramentas utilizadas para o processamento de dados so ferramentas comuns encontradas em vrios analisadores de vibraes disponveis no mercado. Estas podem ser: grficos de espectro de frequncia, sinal no tempo, cascata ou valores de nvel global de vibrao, entre outras. Apesar do analisador desenvolvido no apresentar inovao nas ferramentas de anlise adoptadas, este pretende ser distinguido pelo baixo custo, simplicidade e carcter didctico. Este trabalho vem evidenciar as vantagens, desvantagens e potencialidades de um analisador desta natureza. So tiradas algumas concluses quanto sua capacidade de diagnstico de avarias, capacidades como ferramenta didctica, sensores utilizados e linguagem de programao escolhida. Como concluses principais, o trabalho revela que os sensores escolhidos no so os indicados para efectuar o diagnstico de avarias em ambiente industrial, contudo so ideais para tornar este analisador numa boa ferramenta didctica e de treino.
Resumo:
O trabalho que se apresenta incide sobre o estudo aerodinmico das ps de uma turbina elica de pequeno porte, com vista simplificao geomtrica, de forma a que estas sejam baratas e de fcil concepo. A teoria da quantidade de movimento do elemento de p (BEMT), que o modelo de referncia para o projecto e anlise aerodinmica das ps das turbinas elicas, foi utilizada neste trabalho de forma a projectar e analisar aerodinamicamente as ps da turbina. Sendo assim, desenvolveu-se um programa computacional em MATLAB, denominado de Turbina, de forma a implementar a teoria BEM. Introduzindo os dados dos parmetros de projecto no programa (potncia requerida, o nmero de ps, velocidade do vento, a TSR e o tipo de perfil alar), obtm-se os parmetros geomtricos das ps (distribuio da corda ao longo da envergadura, o raio da p e a distribuio da toro da p), os parmetros aerodinmicos e de desempenho. Uma p ideal foi calculada e de seguida foi modificada de forma a obter-se uma p simples e menos carregada aerodinamicamente. Introduzidas as modificaes na geometria da p ideal, obtiveram-se duas configuraes distintas. Uma configurao linear, onde a distribuio da corda e do ngulo de toro se tornam lineares, e outra configurao bi-linear, onde a distribuio da corda continua linear mas o ngulo de toro se torna bi-linear, isto , a p composta por dois troos onde cada troo apresenta uma distribuio linear do ngulo de toro geomtrica. As concluses demonstram que a configurao bi-linear uma boa alternativa a configurao ideal, apresentando uma reduo do desempenho do rotor de 2.8% para um aumento do raio da p em 1.41%, para se obter a mesma potncia da configurao ideal. A anlise aos perfis alares, utilizados neste trabalho, foi efectuada a partir dos programas comerciais ICEM e FLUENT. De forma a automatizar a anlise de CFD, trs programas foram desenvolvidos utilizando a linguagem de programao C. Os programas so denominados de Malha2D, Calcula_Coeficientes e Plot_Graficos. Finalmente, um estudo paramtrico foi feito de forma a avaliar a influncias das variveis de projecto no desempenho geral da turbina.
Resumo:
This paper is on the problem of short-term hydro, scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.
Resumo:
In the last years there has been a huge growth and consolidation of the Data Mining field. Some efforts are being done that seek the establishment of standards in the area. Included on these efforts there can be enumerated SEMMA and CRISP-DM. Both grow as industrial standards and define a set of sequential steps that pretends to guide the implementation of data mining applications. The question of the existence of substantial differences between them and the traditional KDD process arose. In this paper, is pretended to establish a parallel between these and the KDD process as well as an understanding of the similarities between them.
Resumo:
In the last years there has been a huge growth and consolidation of the Data Mining field. Some efforts are being done that seek the establishment of standards in the area. Included on these efforts there can be enumerated SEMMA and CRISP-DM. Both grow as industrial standards and define a set of sequential steps that pretends to guide the implementation of data mining applications. The question of the existence of substantial differences between them and the traditional KDD process arose. In this paper, is pretended to establish a parallel between these and the KDD process as well as an understanding of the similarities between them.
Resumo:
One of the most difficult problems that face researchers experimenting with complex systems in real world applications is the Facility Layout Design Problem. It relies with the design and location of production lines, machinery and equipment, inventory storage and shipping facilities. In this work it is intended to address this problem through the use of Constraint Logic Programming (CLP) technology. The use of Genetic Algorithms (GA) as optimisation technique in CLP environment is also an issue addressed. The approach aims the implementation of genetic algorithm operators following the CLP paradigm.
Resumo:
This paper presents a methodology for distribution networks reconfiguration in outage presence in order to choose the reconfiguration that presents the lower power losses. The methodology is based on statistical failure and repair data of the distribution power system components and uses fuzzy-probabilistic modelling for system component outage parameters. Fuzzy membership functions of system component outage parameters are obtained by statistical records. A hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. Once obtained the system states by Monte Carlo simulation, a logical programming algorithm is applied to get all possible reconfigurations for every system state. In order to evaluate the line flows and bus voltages and to identify if there is any overloading, and/or voltage violation a distribution power flow has been applied to select the feasible reconfiguration with lower power losses. To illustrate the application of the proposed methodology to a practical case, the paper includes a case study that considers a real distribution network.
Resumo:
This paper present a methodology to choose the distribution networks reconfiguration that presents the lower power losses. The proposed methodology is based on statistical failure and repair data of the distribution power system components and uses fuzzy-probabilistic modeling for system component outage parameters. The proposed hybrid method using fuzzy sets and Monte Carlo simulation based on the fuzzyprobabilistic models allows catching both randomness and fuzziness of component outage parameters. A logic programming algorithm is applied, once obtained the system states by Monte Carlo Simulation, to get all possible reconfigurations for each system state. To evaluate the line flows and bus voltages and to identify if there is any overloading, and/or voltage violation an AC load flow has been applied to select the feasible reconfiguration with lower power losses. To illustrate the application of the proposed methodology, the paper includes a case study that considers a 115 buses distribution network.
Resumo:
In the energy management of the isolated operation of small power system, the economic scheduling of the generation units is a crucial problem. Applying right timing can maximize the performance of the supply. The optimal operation of a wind turbine, a solar unit, a fuel cell and a storage battery is searched by a mixed-integer linear programming implemented in General Algebraic Modeling Systems (GAMS). A Virtual Power Producer (VPP) can optimal operate the generation units, assured the good functioning of equipment, including the maintenance, operation cost and the generation measurement and control. A central control at system allows a VPP to manage the optimal generation and their load control. The application of methodology to a real case study in Budapest Tech, demonstrates the effectiveness of this method to solve the optimal isolated dispatch of the DC micro-grid renewable energy park. The problem has been converged in 0.09 s and 30 iterations.
Resumo:
This paper proposes two meta-heuristics (Genetic Algorithm and Evolutionary Particle Swarm Optimization) for solving a 15 bid-based case of Ancillary Services Dispatch in an Electricity Market. A Linear Programming approach is also included for comparison purposes. A test case based on the dispatch of Regulation Down, Regulation Up, Spinning Reserve and Non-Spinning Reserve services is used to demonstrate that the use of meta-heuristics is suitable for solving this kind of optimization problem. Faster execution times and lower computational resources requirements are the most relevant advantages of the used meta-heuristics when compared with the Linear Programming approach.