665 resultados para Normalização BIM


Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Cultural heritage sites all over the world are at risk due to aggressive urban expansion, development, wars and general obsolescence. Not all objects are recorded in detail although they may have social and historical significance. For example more emphasis is placed on the recording of castles and palaces than on crofters’ cottages or tenement blocks, although their history can be just as rich. This paper will investigate the historic fabric of Aberdeen through the use of digital scanning, supported by a range of media including old photographs and paintings. Dissemination of social heritage through visualisations will be explored and how this can aid the understanding of space within the city or specific area. Focus will be given to the major statues/monuments within the context of the city centre, exploring their importance in their environment. In addition studying why many have been re-located away from their original site, the reasons why, and how we have perhaps lost some of the social and historical importance of why that monument was first located there. It will be argued that Digital Media could be utilised for much more than re-creation and re-presentation of physical entities. Digital scanning, in association with visualisation tools, is used to capture the essence of both the cultural heritage and the society that created or used the sites in association with visualisation tools and in some way re-enacting the original importance placed upon the monument in its original location, through adoption of BIM Heritage.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

PAS1192-2 (2013) outlines the “fundamental principles of Level 2 information modeling”, one of these principles is the use of what is commonly referred to as a Common Data Environment (CDE). A CDE could be described as an internet-enabled cloudhosting platform, accessible to all construction team members to access shared project information. For the construction sector to achieve increased productivity goals, the next generation of industry professionals will need to be educated in a way that provides them with an appreciation of Building Information Modelling (BIM) working methods, at all levels, including an understanding of how data in a CDE should be structured, managed, shared and published. This presents a challenge for educational institutions in terms of providing a CDE that addresses the requirements set out in PAS1192-2, and mirrors organisational and professional working practices without causing confusion due to over complexity. This paper presents the findings of a two-year study undertaken at Ulster University comparing the use of a leading industry CDE platform with one derived from the in-house Virtual Learning Environment (VLE), for the delivery of a student BIM project. The research methodology employed was a qualitative case study analysis, focusing on observations from the academics involved and feedback from students. The results of the study show advantages for both CDE platforms depending on the learning outcomes required.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

4-1BB (CD137) est un membre de la superfamille TNFR qui est impliqué dans la transmission des signaux de survie aux lymphocytes. TRAF1 est une protéine adaptatrice qui est recrutée par 4-1BB et autres TNFRs et est caractérisée par une expression très restreinte aux lymphocytes, cellules dendritiques et certaines cellules épithéliales. TRAF1 est nécessaire pour l’expansion et la survie des cellules T mémoire en présence d'agonistes anti-4-1BB in vivo. De plus, TRAF1 est requise en aval de 4-1BB pour activer (phosphoryler) la MAP kinase Erk impliquée dans la régulation de la molécule pro-apoptotique Bim. Suite à l’activation du récepteur 4-1BB, TRAF1 et ERK sont impliqués dans la phosphorylation de Bim et la modulation de son expression. L’activation et la régulation de TRAF1 et Bim ont un rôle important dans la survie des cellules T CD8 mémoires. Dans cette étude, nous avons utilisé une approche protéomique afin de pouvoir identifier de nouveaux partenaires de liaison de TRAF1. Utilisant cette stratégie, nous avons identifié que LSP1 (Leukocyte Specific Protein 1) est recruté dans le complexe de signalisation 4-1BB de manière TRAF1 dépendante. Une caractérisation plus poussée de l’interaction entre TRAF1 et LSP1 a montré que LSP1 lie la région unique N-terminal de TRAF1 de façon indépendante de la région conservée C-terminal. À l’instar des cellules T déficientes en TRAF1, les cellules T déficientes en LSP1 ne sont pas capables d’activer ERK en aval de 4-1BB et par conséquent ne peuvent pas réguler Bim. Ainsi, TRAF1 et LSP1 coopèrent en aval de 4-1BB dans le but d’activer ERK et réguler en aval les niveaux de Bim dans les cellules T CD8. Selon la littérature, le récepteur 4-1BB n’est pas exprimé à la surface des cellules B murines, mais le récepteur 4-1BB favorise la prolifération et la survie des cellules B humaines. Cependant, il est important d'étudier l'expression du récepteur 4-1BB dans les cellules B murines afin de disposer d'un modèle murin et de prédire la réponse clinique à la manipulation de 4-1BB. En utilisant différentes stimulations de cellules B murines primaires, nous avons identifié que le récepteur 4-1BB est exprimé à la surface des cellules B de souris suite à une stimulation avec le LPS (Lipopolysaccharides). Une caractérisation plus poussée a montré que le récepteur 4-1BB est induit dans les cellules B murines d'une manière dépendante de TLR4 (Toll Like Receptor 4). Collectivement, notre travail a démontré que la stimulation avec le LPS induit l’expression du récepteur 4-1BB à la surface des cellules B murines, menant ainsi à l'induction de TRAF1. De plus, TRAF1 et LSP1 coopèrent en aval de 4-1BB pour activer la signalisation de la Map kinase ERK dans les cellules B murines de manière similaire aux cellules T. Les cellules B déficientes en TRAF1 et les cellules B déficientes en LSP1 ne sont pas en mesure d'activer la voie ERK en aval de 4-1BB et montrent un niveau d’expression du récepteur significativement diminué comparé aux cellules B d’une souris WT. Ainsi, TRAF1 et LSP1 sont nécessaires pour une expression maximale du récepteur 4-1BB à la surface cellulaire de cellules B murines et coopèrent en aval de 4-1BB afin d'activer la cascade ERK dans les cellules B murines.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The human cytomegalovirus developed distinct evasion mechanisms from the cellular antiviral response involving vMIA, a virally-encoded protein that is not only able to prevent cellular apoptosis but also to inhibit signalling downstream from mitochondrial MAVS. vMIA has been shown to localize at mitochondria and to trigger their fragmentation, a phenomenon proven to be essential for the signalling inhibition. Here, we demonstrate that vMIA is also localized at peroxisomes, induces their fragmentation and inhibits the peroxisomal-dependent antiviral signalling pathway. Importantly, we demonstrate that peroxisomal fragmentation is not essential for vMIA to specifically inhibit signalling downstream the peroxisomal MAVS. We also show that vMIA interacts with the cytoplasmic chaperone Pex19, suggesting that the virus has developed a strategy to highjack the peroxisomal membrane proteins' transport machinery. Furthermore, we show that vMIA is able to specifically interact with the peroxisomal MAVS. Our results demonstrate that peroxisomes constitute a platform for evasion of the cellular antiviral response and that the human cytomegalovirus has developed a mechanism by which it is able to specifically evade the peroxisomal MAVS-dependent antiviral signalling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O objetivo desta dissertação é a proposta de um sistema de apoio à inspeção e diagnóstico de anomalias em coberturas em terraço, tendo em vista a normalização e sistematização das inspeções de forma a auxiliar os intervenientes responsáveis por estas ações. Numa primeira fase, são identificadas e classificadas as anomalias e as respetivas causas prováveis e, seguidamente, elaboradas fichas de anomalias, nas quais são incluídas informações relacionadas com as mesmas, tais como a sua designação, descrição sumária do fenómeno de degradação, causas e consequências possíveis, aspetos a inspecionar, parâmetros de inspeção e, finalmente, classificação da anomalia de acordo com o nível de gravidade / urgência de reparação. Nesta fase, são elaboradas as matrizes de correlação anomalias - causas e inter - anomalias. Posteriormente, são identificadas e classificadas as técnicas de diagnóstico das anomalias e das causas, recorrendo a ensaios não destrutivos de realização in situ e, por fim, é construída a matriz de correlação anomalias - técnicas de diagnóstico. São apresentadas fichas individuais das técnicas, onde constam informações como a designação, os objetivos, o equipamento necessário, a descrição do método, as vantagens e as limitações. Finalmente, apresenta-se a validação do sistema classificativo proposto, realizada através de uma campanha de inspeções a 105 coberturas planas. Como complemento, é apresentado um tratamento estatístico completo dos dados recolhidos, de forma a retirar conclusões relevantes para a temática. A normalização das inspeções permite aumentar a eficácia e eficiência das ações a tomar no âmbito da patologia, tal como permite avaliações o menos subjetivas possível. Por outro lado, a implementação prática deste sistema, através de uma ferramenta informática, seria uma mais-valia, uma vez que iria permitir auxiliar o inspetor nas atividades de inspeção inseridas em estratégias de manutenção pró-ativa do tipo preditivas.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Com o decorrer dos anos a sinistralidade rodoviária tem vindo a decrescer. Porém é necessário continuar a apostar na melhoria dos indicadores. O trabalho inicia-se com uma revisão bibliográfica de enquadramento, de modo a evidenciar os aspetos relacionados com a avaliação da segurança rodoviária e as eventuais medidas mitigadoras. Determinaram-se alguns indicadores que foram utilizados para medir a sinistralidade rodoviária em interseções em meio urbano, tendo-se como estudo de caso a rede da cidade de Coimbra, de 2010 a 2012. Para isso, recorreu-se ao ArcGIS 10.0 que é um Sistema de Informação Geográfica (SIG), utilizando a base de dados facultada pela Autoridade Nacional de Segurança Rodoviária (ANSR), complementada com informação dos acidentes recolhidos pela PSP de Coimbra. Consideraram-se na análise as vias com 4 ou mais acidentes em pelo menos um ano. Após georreferenciação dos acidentes rodoviários, o SIG permitiu visualizar a sua distribuição na rede, bem como associar a cada um deles o esquema do acidente disponibilizado pela Polícia de Segurança Pública. Os procedimentos envolvidos nas análises dizem respeito ao Índice de Gravidade (IG) e ao Valor Hierárquico do Local (VHL). Por se ter verificado que o VHL traduz melhor o desempenho em termos de sinistralidade em meio urbano, foi este o parâmetro utilizado para identificar as interseções sobre as quais deveria incidir a atenção da entidade gestora da rede. O VHL é determinado com base no número de ocorrências, na gravidade dos acidentes e no volume horário de tráfego, tendo-se considerado a informação de sinistralidade de duas formas distintas: dados de forma agregada no triénio; e dados separados para cada um dos anos. De forma a comparar de forma simples o desempenho das interseções, fez-se a normalização da variável VHL de modo a ser possível assinalar as interseções com níveis de desempenho de 1, 2, 3, 4 ou 5. Nesta escala, 1 corresponde ao melhor desempenho e 5 refere-se ao pior desempenho. As interseções identificadas com o nível 5 e 4 devem ter uma atenção privilegiada por parte da entidade gestora por serem as que revelam pior desempenho. A metodologia utilizada pode ser aplicada a redes viárias de aglomerados urbanos desde que se disponha de dados de acidentes em três anos consecutivos e seja possível fazer a sua georeferenciação, sendo também necessários dados de volumes horários de tráfego, os quais podem ser obtidos por contagens em vários pontos da rede.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O trabalho realizado, teve como objetivo final, o desenvolvimento de um projeto, com vista à elaboração de um plano de contas para as Autarquias Locais, baseado no SNC (Sistema de Normalização Contabilística) que se encontra em vigor desde 2009, para as empresas privadas, de acordo com o estabelecido no Decreto - Lei 237/2009. O novo plano de contas, constante do projeto, virá a substituir o POCAL (Plano Oficial de Contas das Autarquias Locais), que se encontra implementado desde 1999, através do Decreto-Lei 54-A, de 22 de Fevereiro, com obrigatoriedade do seu seguimento a partir de Janeiro de 2002, dando lugar ao SNCAL. Tal como se verificou, relativamente ao POCAL, que foi criado no seguimento do POCP (Plano Oficial de Contas Público). Também para este projeto de elaboração de um plano de contas para as Autarquias Locais, foi tido como base o tronco de contas e subcontas que se prevê venha a ser implementado no Setor Público, com a designação de SNCP.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

No setor da construção, a principal prioridade é a redução de custos relacionados com os processos construtivos e a sua execução. Devido à crise económica global e ao crescimento da competitividade do setor da construção, é necessário analisar outras opções que confiram boas práticas de construção, cumprindo os requisitos definidos na regulamentação atual. Este estudo aborda a temática de algumas das soluções construtivas normalmente utilizadas, focando aspetos de normalização, custos, vantagens e desvantagens. É também apresentada uma avaliação comparativa entre dois sistemas construtivos, alvenaria estrutural vs. betão armado, de uma moradia construída ao abrigo de um projeto de investigação. Nessa avaliação é feita a apresentação do processo de conceção modular e conceção estrutural para ambas as soluções em fase de projeto. Este estudo também apresenta uma comparação de custos entre dois sistemas construtivos, nomeadamente a construção em alvenaria estrutura vs. construção em betão armado. Com o estudo realizado constatou-se que no projeto é notória a complexidade da alvenaria estrutural em detrimento do betão armado. A alvenaria estrutural também apresenta limitações a eventuais alterações executadas durante a vida útil do edifício. Relativamente à comparação de custos efetuada, os resultados mostram que a construção em alvenaria estrutural é um processo tecnológico apropriado e a redução de custos é significativa.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il flusso di lavoro odierno. Quindi, partendo da un’analisi che e ritrae l’estrema frammentazione del settore delle costruzioni, si va ad analizzare come il BIM aumenti e favorisca la collaborazione delle parti interessate, armonizzando l’intero processo costruttivo dell’opera. Si prosegue con l'esame della diffusione e del livello di maturità degli strumenti BIM, di come i privati e le amministrazioni pubbliche, a livello mondiale, stiano spingendo per favorire l’adozione della metodologia BIM. Inoltre si analizzano le dinamiche dell’interoperabilità, delle metodologie e protocolli di interscambio dati, che sono un elemento chiave per il successo del BIM per via dei numerosi strumenti, specializzati nelle varie discipline del settore edile. Nella terza parte, dedicata al Project Management di un caso di studio, si verifica la bontà delle metodologie teorizzate attraverso la realizzazione di un modello virtuale in Revit. Dal modello realizzato dal laureando sono estrapolate le informazioni necessarie alla gestione, e tramite il software STRVison CPM, si elaborano i principali documenti per la progettazione e gestione del cantiere: il CM, il CME, i tempi operativi, il cronoprogramma Gantt. Obbiettivo è constatare l’effettivo livello di maturità della strategia BIM 4D e 5D e la reale possibilità di un impiego capillare nel panorama italiano del settore delle costruzioni.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Relatório de estágio, Mestrado, Contabilidade e Fiscalidade, Instituto Politécnico de Santarém, Escola Superior de Gestão e Tecnologia, 2016

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Thesis (Master's)--University of Washington, 2016-06