977 resultados para Emergency Shelter Grant Program (U.S.)
Resumo:
Projections of U.S. ethanol production and its impacts on planted acreage, crop prices, livestock production and prices, trade, and retail food costs are presented under the assumption that current tax credits and trade policies are maintained. The projections were made using a multi-product, multi-country deterministic partial equilibrium model. The impacts of higher oil prices, a drought combined with an ethanol mandate, and removal of land from the Conservation Reserve Program (CRP) relative to baseline projections are also presented. The results indicate that expanded U.S. ethanol production will cause long-run crop prices to increase. In response to higher feed costs, livestock farmgate prices will increase enough to cover the feed cost increases. Retail meat, egg, and dairy prices will also increase. If oil prices are permanently $10-per-barrel higher than assumed in the baseline projections, U.S. ethanol will expand significantly. The magnitude of the expansion will depend on the future makeup of the U.S. automobile fleet. If sufficient demand for E-85 from flex-fuel vehicles is available, corn-based ethanol production is projected to increase to over 30 billion gallons per year with the higher oil prices. The direct effect of higher feed costs is that U.S. food prices would increase by a minimum of 1.1% over baseline levels. Results of a model of a 1988-type drought combined with a large mandate for continued ethanol production show sharply higher crop prices, a drop in livestock production, and higher food prices. Corn exports would drop significantly, and feed costs would rise. Wheat feed use would rise sharply. Taking additional land out of the CRP would lower crop prices in the short run. But because long-run corn prices are determined by ethanol prices and not by corn acreage, the long-run impacts on commodity prices and food prices of a smaller CRP are modest. Cellulosic ethanol from switchgrass and biodiesel from soybeans do not become economically viable in the Corn Belt under any of the scenarios. This is so because high energy costs that increase the prices of biodiesel and switchgrass ethanol also increase the price of cornbased ethanol. So long as producers can choose between soybeans for biodiesel, switchgrass for ethanol, and corn for ethanol, they will choose to grow corn. Cellulosic ethanol from corn stover does not enter into any scenario because of the high cost of collecting and transporting corn stover over the large distances required to supply a commercial-sized ethanol facility.
Resumo:
I am pleased to present the performance report for the Iowa Department for the Blind for fiscal year 2008. This report is provided in compliance with sections 8E.210 and 216B.7 of the Code of Iowa. It contains valuable information about results achieved because of the services that we and our partners provided to blind and visually impaired Iowans during the past fiscal year in the areas of Vocational Rehabilitation, Independent Living, Library Services, and Resource Management. We determine our competitive success in a number of ways. We look at the federal standards and indicators to learn our ranking in relation to the performance of other public rehabilitation agencies. We compare our library's production and circulation figures with those from previous years to determine trends. We set our own standards for success by looking at such factors as the number of successful case closures, average hourly wage at case closure, skills training provided, and compliance with regulations. Results show that the Department is working positively toward achieving its strategic goals of increasing the independence and productivity of blind Iowans and improving access to information for blind Iowans. Major accomplishments of the year included: The selection of our Library as one of eight libraries to receive the new digital talking book machines and books in digital media from the National Library Service for the Blind and Physically Handicapped. Priority for distribution of the machines is given to Library patrons who are veterans. The Department, the Iowa Braille School, and the Department of Education have been promoting the new expanded core curriculum as part of their continued efforts to improve the coordination and delivery of services to blind and visually impaired students in Iowa. The Department's five-year grant funded Pathfinders mentoring program ended this year. A total of 49 blind youths aged 16-26 were paired with successful blind adult mentors. Assessments of the program clearly showed that participation in the program had a measurable positive effect on the youth involved. Finally, earnings ratios and the percentage of employment for vocational rehabilitation clients of the Department are among the best in the nation, as measured by the U.S. Rehabilitation Services Administration's standards and indicators for the year ended September 30, 2007. Overall, we met or exceeded 13 of 18 targets included in this report. A discussion of the Department's services, customers, and organizational structure, and budget appears in the "Department Overview" that follows. Information pertaining to performance results appears in the final section of this document. The success of the Department's programs is evident in the success achieved by blind Iowans. It is reflected in the many blind persons who can be seen traveling about independently, going to their jobs and to the community and family activities in which they participate. Sincerely, Karen A. Keninger, Director Iowa Department for the Blind
Resumo:
Highlights: * U.S. Labor Secretary Hilda Solis visited Iowa at the end of July....pg. 2 * The Shoes for Veterans campaign began following a visit to a homeless shelter in the Quad Cities....pg. 2 * Are You Prepared? An emergency – be it a flood, tornado, winter storm or power outage – can occur quickly and without warning...pg. 3 * The Southwest Iowa Employers’ Council & Iowa Workforce Development in conjunction with the Iowa Committee for ESGR will present two valuable training sessions for businesses.....pg. 3
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
The evaluation’s overarching question was “Did the activities undertaken through the state’s LSTA plan achieve results related to priorities identified in the Act?” The evaluation was conducted and is organized according to the six LSTA priorities. The research design employed two major methodologies: 1. Data sources from Iowa Library Services / State Library of Iowa2 as well as U.S and state sources were indentified for quantitative analysis. These sources, which primarily reflect outputs for various projects, included: Statistics from the Public Library Annual Survey Statistics collected internally by Iowa Library Services such as number of libraries subscribing to sponsored databases, number of database searches, attendance at continuing education events, number of interlibrary loan transactions Evaluation surveys from library training sessions, professional development workshops and other programs supported by LSTA funds Internal databases maintained by Iowa Library Services Impact results from post training evaluations conducted by Iowa Library Services 2010 Iowa census data from the U.S. Census Bureau LSTA State Program Reports for the grant period 2. Following the quantitative analysis, the evaluator gathered qualitative data through interviews with key employees, a telephone focus group with district library consultants and two surveys: LSTA Evaluation Survey (Public Libraries) and LSTA Evaluation Survey (Academic Libraries). Both surveys provided sound samples with 43 representatives of Iowa’s 77 academic libraries and 371 representatives of Iowa’s 544 public libraries participating. Respondents represented libraries of all sizes and geographical areas. Both surveys included multiple choice and rating scale items as well as open-ended questions from which results were coded to identify trends, issues and recommendations.
Resumo:
The Office of the Drug Policy Coordinator is established in Chapter 80E of the Code of Iowa. The Coordinator directs the Governor’s Office of Drug Control Policy; coordinates and monitors all statewide counter-drug efforts, substance abuse treatment grants and programs, and substance abuse prevention and education programs; and engages in other related activities involving the Departments of public safety, corrections, education, public health, and human services. The coordinator assists in the development of local and community strategies to fight substance abuse, including local law enforcement, education, and treatment activities. The Drug Policy Coordinator serves as chairperson to the Drug Policy Advisory Council. The council includes the directors of the departments of corrections, education, public health, public safety, human services, division of criminal and juvenile justice planning, and human rights. The Council also consists of a prosecuting attorney, substance abuse treatment specialist, substance abuse prevention specialist, substance abuse treatment program director, judge, and one representative each from the Iowa Association of Chiefs of Police and Peace Officers, the Iowa State Police Association, and the Iowa State Sheriff’s and Deputies’ Association. Council members are appointed by the Governor and confirmed by the Senate. The council makes policy recommendations related to substance abuse education, prevention, and treatment, and drug enforcement. The Council and the Coordinator oversee the development and implementation of a comprehensive State of Iowa Drug Control Strategy. The Office of Drug Control Policy administers federal grant programs to improve the criminal justice system by supporting drug enforcement, substance abuse prevention and offender treatment programs across the state. The ODCP prepares and submits the Iowa Drug and Violent Crime Control Strategy to the U.S. Department of Justice, with recommendations from the Drug Policy Advisory Council. The ODCP also provides program and fiscal technical assistance to state and local agencies, as well as program evaluation and grants management.
Resumo:
Program from the dedication ceremony of the new U.S. 61 between Interstate 80 and U.S. 30 near De Witt. This section provides motorists with a safe and convenient four-lane highway.
Resumo:
Program from the dedication ceremony of the new U.S. 61 Muscatine Bypass.
Resumo:
Program from the dedication of U.S. 63 near Chester, Iowa. Includes project description and contractor information.
Resumo:
The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.
Resumo:
The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.
Resumo:
The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.
Resumo:
The Midwest Transportation Consortium (MTC) recently completed its sixth year of operation. The MTC has become an established portion of the research and educational programs at ISU and its partner universities. The MTC continues to emphasize its primary focus of developing human capital. For example, this semester, Fall, 2005, ISU has graduate scholars in its educational program. However, we also recognize that the federal grant is an opportunity to build programs at our respective universities that continue after the U.S. DOT UTCP may end. An example of building a long lasting program is the University of Missouri – St. Louis (UMSL) and its development of a transportation Ph.D. program in their business college. Admittedly, this program could have been started regardless, but Dr. Ray Mundy, Director of UMSL’s Transportation Scholars Program, believes that the MTC support of the transportation educational program at UMSL was the essential component in establishing a Ph.D. program. At ISU, the MTC has been instrumental in establishing two research and outreach programs, and both have themes that are related to the MTC’s theme of “Transportation System Management and Operation.” The Center for Weather Impacts on Mobility and Safety (C-WIMS) was recently established, and the Center for Road Infrastructure Management and Operations (RIMO) is in the process of being established. The MTC has a critical role in establishing each of these two programs. As part of the on-going MTC program, we have established an effective network that promotes the education of future transportation professionals and the development of new knowledge on how to manage transportation infrastructure and services in a more sustainable manner. The MTC has a track record of developing outstanding students; these students are now becoming leaders in the private sector, government, and academia. The MTC has also supported the development of an extensive research portfolio related to sustainable transportation asset management. More research projects are in the pipeline. Finally, the MTC has dedicated itself to the dissemination of asset management research results through an ongoing technology transfer program. This document provides a progress for the latest fiscal year of operation of the MTC, which ran from October 2004 through September 2005.
Resumo:
The Midwest Transportation Consortium (MTC) recently completed its sixth year of operation. The MTC has become an established portion of the research and educational programs at ISU and its partner universities. The MTC continues to emphasize its primary focus of developing human capital. For example, this semester, Fall, 2005, ISU has graduate scholars in its educational program. However, we also recognize that the federal grant is an opportunity to build programs at our respective universities that continue after the U.S. DOT UTCP may end. An example of building a long lasting program is the University of Missouri – St. Louis (UMSL) and its development of a transportation Ph.D. program in their business college. Admittedly, this program could have been started regardless, but Dr. Ray Mundy, Director of UMSL’s Transportation Scholars Program, believes that the MTC support of the transportation educational program at UMSL was the essential component in establishing a Ph.D. program. At ISU, the MTC has been instrumental in establishing two research and outreach programs, and both have themes that are related to the MTC’s theme of “Transportation System Management and Operation.” The Center for Weather Impacts on Mobility and Safety (C-WIMS) was recently established, and the Center for Road Infrastructure Management and Operations (RIMO) is in the process of being established. The MTC has a critical role in establishing each of these two programs. As part of the on-going MTC program, we have established an effective network that promotes the education of future transportation professionals and the development of new knowledge on how to manage transportation infrastructure and services in a more sustainable manner. The MTC has a track record of developing outstanding students; these students are now becoming leaders in the private sector, government, and academia. The MTC has also supported the development of an extensive research portfolio related to sustainable transportation asset management. More research projects are in the pipeline. Finally, the MTC has dedicated itself to the dissemination of asset management research results through an ongoing technology transfer program. This document provides a progress for the latest fiscal year of operation of the MTC, which ran from October 2004 through September 2005.
Resumo:
The Midwest Transportation Consortium (MTC) recently completed its sixth year of operation. The MTC has become an established portion of the research and educational programs at ISU and its partner universities. The MTC continues to emphasize its primary focus of developing human capital. For example, this semester, Fall, 2005, ISU has graduate scholars in its educational program. However, we also recognize that the federal grant is an opportunity to build programs at our respective universities that continue after the U.S. DOT UTCP may end. An example of building a long lasting program is the University of Missouri – St. Louis (UMSL) and its development of a transportation Ph.D. program in their business college. Admittedly, this program could have been started regardless, but Dr. Ray Mundy, Director of UMSL’s Transportation Scholars Program, believes that the MTC support of the transportation educational program at UMSL was the essential component in establishing a Ph.D. program. At ISU, the MTC has been instrumental in establishing two research and outreach programs, and both have themes that are related to the MTC’s theme of “Transportation System Management and Operation.” The Center for Weather Impacts on Mobility and Safety (C-WIMS) was recently established, and the Center for Road Infrastructure Management and Operations (RIMO) is in the process of being established. The MTC has a critical role in establishing each of these two programs. As part of the on-going MTC program, we have established an effective network that promotes the education of future transportation professionals and the development of new knowledge on how to manage transportation infrastructure and services in a more sustainable manner. The MTC has a track record of developing outstanding students; these students are now becoming leaders in the private sector, government, and academia. The MTC has also supported the development of an extensive research portfolio related to sustainable transportation asset management. More research projects are in the pipeline. Finally, the MTC has dedicated itself to the dissemination of asset management research results through an ongoing technology transfer program. This document provides a progress for the latest fiscal year of operation of the MTC, which ran from October 2004 through September 2005.