883 resultados para E-procurement
Resumo:
The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.
Resumo:
This paper is from a study on specialist and trade contracting in the construction industry. The research was commissioned by CIRIA and undertaken by the University of Reading in conjunction with Sir Alexander Gibb & Partners Ltd. The purpose of the work was to provide guidance for effective and equitable practice in the management of projects where much of the work is executed, and possibly designed, by specialist and trade contractors (STCs). As part of this study, a preliminary investigation into the nature and origins of specialist contracting was undertaken, in conjunction with a survey of the problems confronting STCs. This paper presents that phase of the project.
Resumo:
The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.
Resumo:
The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • Journal of Construction Research (JCR) • Journal of Financial Management in Property and Construction (JFM) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. This volume brings together articles published during 1999. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable rapid reference to articles. A cumulative volume is available from the editor. Included in this volume is an appendix listing a wide range of journals associated with construction management research, giving details of frequency, editorial addresses and web sites, as well as whether each journal is international and/or refereed.
Resumo:
Preface. Iron is considered to be a minor element employed, in a variety of forms, by nearly all living organisms. In some cases, it is utilised in large quantities, for instance for the formation of magnetosomes within magnetotactic bacteria or during use of iron as a respiratory donor or acceptor by iron oxidising or reducing bacteria. However, in most cases the role of iron is restricted to its use as a cofactor or prosthetic group assisting the biological activity of many different types of protein. The key metabolic processes that are dependent on iron as a cofactor are numerous; they include respiration, light harvesting, nitrogen fixation, the Krebs cycle, redox stress resistance, amino acid synthesis and oxygen transport. Indeed, it is clear that Life in its current form would be impossible in the absence of iron. One of the main reasons for the reliance of Life upon this metal is the ability of iron to exist in multiple redox states, in particular the relatively stable ferrous (Fe2+) and ferric (Fe3+) forms. The availability of these stable oxidation states allows iron to engage in redox reactions over a wide range of midpoint potentials, depending on the coordination environment, making it an extremely adaptable mediator of electron exchange processes. Iron is also one of the most common elements within the Earth’s crust (5% abundance) and thus is considered to have been readily available when Life evolved on our early, anaerobic planet. However, as oxygen accumulated (the ‘Great oxidation event’) within the atmosphere some 2.4 billion years ago, and as the oceans became less acidic, the iron within primordial oceans was converted from its soluble reduced form to its weakly-soluble oxidised ferric form, which precipitated (~1.8 billion years ago) to form the ‘banded iron formations’ (BIFs) observed today in Precambrian sedimentary rocks around the world. These BIFs provide a geological record marking a transition point away from the ancient anaerobic world towards modern aerobic Earth. They also indicate a period over which the bio-availability of iron shifted from abundance to limitation, a condition that extends to the modern day. Thus, it is considered likely that the vast majority of extant organisms face the common problem of securing sufficient iron from their environment – a problem that Life on Earth has had to cope with for some 2 billion years. This struggle for iron is exemplified by the competition for this metal amongst co-habiting microorganisms who resort to stealing (pirating) each others iron supplies! The reliance of micro-organisms upon iron can be disadvantageous to them, and to our innate immune system it represents a chink in the microbial armour, offering an opportunity that can be exploited to ward off pathogenic invaders. In order to infect body tissues and cause disease, pathogens must secure all their iron from the host. To fight such infections, the host specifically withdraws available iron through the action of various iron depleting processes (e.g. the release of lactoferrin and lipocalin-2) – this represents an important strategy in our defence against disease. However, pathogens are frequently able to deploy iron acquisition systems that target host iron sources such as transferrin, lactoferrin and hemoproteins, and thus counteract the iron-withdrawal approaches of the host. Inactivation of such host-targeting iron-uptake systems often attenuates the pathogenicity of the invading microbe, illustrating the importance of ‘the battle for iron’ in the infection process. The role of iron sequestration systems in facilitating microbial infections has been a major driving force in research aimed at unravelling the complexities of microbial iron transport processes. But also, the intricacy of such systems offers a challenge that stimulates the curiosity. One such challenge is to understand how balanced levels of free iron within the cytosol are achieved in a way that avoids toxicity whilst providing sufficient levels for metabolic purposes – this is a requirement that all organisms have to meet. Although the systems involved in achieving this balance can be highly variable amongst different microorganisms, the overall strategy is common. On a coarse level, the homeostatic control of cellular iron is maintained through strict control of the uptake, storage and utilisation of available iron, and is co-ordinated by integrated iron-regulatory networks. However, much yet remains to be discovered concerning the fine details of these different iron regulatory processes. As already indicated, perhaps the most difficult task in maintaining iron homeostasis is simply the procurement of sufficient iron from external sources. The importance of this problem is demonstrated by the plethora of distinct iron transporters often found within a single bacterium, each targeting different forms (complex or redox state) of iron or a different environmental condition. Thus, microbes devote considerable cellular resource to securing iron from their surroundings, reflecting how successful acquisition of iron can be crucial in the competition for survival. The aim of this book is provide the reader with an overview of iron transport processes within a range of microorganisms and to provide an indication of how microbial iron levels are controlled. This aim is promoted through the inclusion of expert reviews on several well studied examples that illustrate the current state of play concerning our comprehension of how iron is translocated into the bacterial (or fungal) cell and how iron homeostasis is controlled within microbes. The first two chapters (1-2) consider the general properties of microbial iron-chelating compounds (known as ‘siderophores’), and the mechanisms used by bacteria to acquire haem and utilise it as an iron source. The following twelve chapters (3-14) focus on specific types of microorganism that are of key interest, covering both an array of pathogens for humans, animals and plants (e.g. species of Bordetella, Shigella, , Erwinia, Vibrio, Aeromonas, Francisella, Campylobacter and Staphylococci, and EHEC) as well as a number of prominent non-pathogens (e.g. the rhizobia, E. coli K-12, Bacteroides spp., cyanobacteria, Bacillus spp. and yeasts). The chapters relay the common themes in microbial iron uptake approaches (e.g. the use of siderophores, TonB-dependent transporters, and ABC transport systems), but also highlight many distinctions (such as use of different types iron regulator and the impact of the presence/absence of a cell wall) in the strategies employed. We hope that those both within and outside the field will find this book useful, stimulating and interesting. We intend that it will provide a source for reference that will assist relevant researchers and provide an entry point for those initiating their studies within this subject. Finally, it is important that we acknowledge and thank wholeheartedly the many contributors who have provided the 14 excellent chapters from which this book is composed. Without their considerable efforts, this book, and the understanding that it relays, would not have been possible. Simon C Andrews and Pierre Cornelis
Resumo:
Throughout the developed world, professional services play an increasingly important part in an economy, with many countries showing a substantial positive trade balance for services. Yet, there has been relatively little research on construction services (CS) and, in particular, how well professional service companies (PSFs) perform in the international arena. The method for collecting services export information differs to the way in which goods and products exports data are gathered because of the intangible nature of services. Organisational growth of companies aims to share risks across different regions and sectors, however, the rapidly changing business environment challenges companies with the increasing foreign ownership and changes in procurement. The complexity of today’s international construction services organisations raises two questions: how the organisations can successfully manage growth and what are their motives for international trade. The research focuses on top UK consulting engineering companies to understand their organisational strategy, their export strategy, and drivers for overseas activities. The data will feed a model of professional services exports, which can help to inform the way services export data could be collected to better reflect the industry’s performance.
Resumo:
FOREWORD Welcome to this West Africa Built Environment Research (WABER) conference taking place here in Ghana. Thank you for coming and welcome to Accra. The main aims of the WABER conference are: to help young researchers and early-career scholars in West Africa to develop their research work and skills through constructive face-to-face interaction with experienced academics; to provide a platform for networking and collaborative work among senior built environment academics in West Africa; and to serve as a vehicle for developing the field of construction management and economics in Africa. Waber 2009 The WABER event in 2009 was held at the British Council in Accra, Ghana on 2-3 June. The event was a resounding success. It attracted participation from 32 researchers, from 12 different institutions, who presented their work to an audience of approximately 100 people. Each presenter received immediate and constructive feedback from an international panel. The event was opened by Professor K.K. Adarkwa, Vice Chancellor of KNUST, Kumasi, Ghana, with several senior academics and researchers from universities, polytechnics, and other institutions in Ghana and Nigeria in attendance. There was also a significant level of attendance by senior construction practitioners in Ghana. Thank you to the School of Construction Management and Engineering, University of Reading, UK for funding the inaugural event in 2009. We are also grateful to all of you who helped to make the event a success and to those of you who have joined us here today to build upon the success and legacy of WABER 2009. Waber 2010 This year, we have 60+ peer-reviewed papers and presentations on topics relating to Building services and maintenance, Construction costs, Construction design and technology, Construction education, Construction finance, Construction procurement, Contract administration, Contract management, Contractor development, Decision support systems, Dispute resolution, Economic development, Energy efficiency, Environment and sustainability, Health and safety, Human resources, Information technology, Marketing, Materials science, Organisation strategy and business performance, Productivity, Project management, Quantity surveying, Real estate and planning, Solar energy systems, Supply chain management and Urban development. We hope that these papers will generate interest among delagates and stimulate discussion here and beyond the conference into the wider community of academia and industry. The delegates at this conference come from 10 different countries. This provides a rich international and multicultural blend and a perfect platform for networking and developing collaborations. This year we are blessed to have three high profile keynote speakers in the persons of Professor George Ofori (National University of Singapore), Dr Roine Leiringer (University of Reading, UK) and Professor Will Hughes (University of Reading, UK). We are also thankful to Dr Chris Harty (University of Reading, UK) who is facilitating the Research Skills Workshop on ‘Writing a scientific article’. Thank you to Dr Sena Agyepong of our conference organising team for her capable management of local organising arrangements. And above all, thank you to all of you for coming to this conference. Enjoy and have a safe journey back home. Dr Samuel Laryea School of Construction Management and Engineering University of Reading, July 2010
Resumo:
The paper examines how European retailers are using private standards for food safety and,quality as risk management and competitive tools and the strategic responses of leading Kenyan and other developing country supplier/exporters to such standards. Despite measures to harmonize a 'single market', the European fresh produce market is very diverse in terms of consumer preferences, structural dynamics and attention to and enforcement of food safety and other standards. Leading Kenyan fresh produce suppliers have re-positioned themselves at the high end, including 'high care', segments of the market - precisely those that are most demanding in terms of quality assurance and food safety systems. An array of factors have influenced this strategic positioning, including relatively high international freight costs, the emergence of more effective competition in mainstream product lines, relatively low labor costs for produce preparation, and strong market relationships with selected retail chains. To succeed in this demanding market segment, the industry has had to invest substantially in improved production and procurement systems, upgraded pack house facilities, and quality assurance/food safety management systems. (C) 2005 Elsevier Ltd. All rights reserved.
Resumo:
This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.
Resumo:
There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.
Resumo:
The overall significance of the construction and building services sector internationally cannot be overemphasised. In the UK, the industry currently accounts for 10% gross domestic product (GDP) and employs 2 million people, which is more than 1 in 14 of the total workforce. However, regardless of its output (approximately £65 billion annually) there has been a steady decline in the number of trade entrants into the construction and building services sector. Consequently, the available ‘pool of labour’ is inadequately resourced; productivity is low; the existing labour force is overstressed; there is an increase in site deaths; and a long-term labour shortage is envisaged. Today, the evidence seems to suggest that multiskilling is a tentative redress for ameliorating the skills crisis in the construction and building sectors. A 43-year time-series of data on 23 manpower attributes was evaluated as part of this investigation. The developed linear regression models show that the concept of multiskilling obeys the ‘law of diminishing returns'. That is, a weak relation was found between construction output and a three or more combination of manpower attributes. An optimisation model is prescribed for traditional trades.
Resumo:
Purpose – The purpose of this paper is to investigate the concepts of intelligent buildings (IBs), and the opportunities offered by the application of computer-aided facilities management (CAFM) systems. Design/methodology/approach – In this paper definitions of IBs are investigated, particularly definitions that are embracing open standards for effective operational change, using a questionnaire survey. The survey further investigated the extension of CAFM to IBs concepts and the opportunities that such integrated systems will provide to facilities management (FM) professionals. Findings – The results showed variation in the understanding of the concept of IBs and the application of CAFM. The survey showed that 46 per cent of respondents use a CAFM system with a majority agreeing on the potential of CAFM in delivery of effective facilities. Research limitations/implications – The questionnaire survey results are limited to the views of the respondents within the context of FM in the UK. Practical implications – Following on the many definitions of an IB does not necessarily lead to technologies of equipment that conform to an open standard. This open standard and documentation of systems produced by vendors is the key to integrating CAFM with other building management systems (BMS) and further harnessing the application of CAFM for IBs. Originality/value – The paper gives experience-based suggestions for both demand and supply sides of the service procurement to gain the feasible benefits and avoid the currently hindering obstacles, as the paper provides insight to the current and future tools for the mobile aspects of FM. The findings are relevant for service providers and operators as well.