748 resultados para Construction industry - Economic aspects - China
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.
Resumo:
Organizational issues are inhibiting the implementation and strategic use of information technologies (IT) in the construction sector. This paper focuses on these issues and explores processes by which emerging technologies can be introduced into construction organizations. The paper is based on a case study, conducted in a major house building company that was implementing a virtual reality (VR) system for internal design review in the regional offices. Interviews were conducted with different members of the organization to explore the introduction process and the use of the system. The case study findings provide insight into the process of change, the constraints that inhibit IT implementation and the relationship between new technology and work patterns within construction organizations. They suggest that (1) user-developer communications are critical for the successful implementation of non-diffused innovations in the construction industry; and (2) successful uptake of IT requires both strategic decision-making by top management and decision-making by technical managers.
Resumo:
The benefits and applications of virtual reality (VR) in the construction industry have been investigated for almost a decade. However, the practical implementation of VR in the construction industry has yet to reach maturity owing to technical constraints. The need for effective information management presents challenges: both transfer of building data to, and organisation of building information within, the virtual environment require consideration. This paper reviews the applications and benefits of VR in the built environment field and reports on a collaboration between Loughborough University and South Bank University to overcome constraints on the use of the overall VR model for whole lifecycle visualisation. The work at each research centre is concerned with an aspect of information management within VR applications for the built environment, and both data transfer and internal data organisation have been investigated. In this paper, similarities and differences between computer-aided design (CAD) and VR packages are first discussed. Three different approaches to the creation of VR models during the design stage are identified and described, with a view to providing sharing understanding across the interdiscipliary groups involved. The suitable organisation of building information within the virtual environment is then further investigated. This work focused on the visualisation of the degradation of a building, through its lifespan, with the view to provide a visual aid for developing an effective and economic project maintenance programme. Finally consideration is given to the potential of emerging standards to facilitate an integrated use of VR. The convergence towards similar data structures in VR and other construction packages may enable visualisation to be better utilised in the overall lifecycle model.
Resumo:
This paper reports the proceedings of a conference held at Reading University in 1993 which addressed the issues of new technological developments at the regional and sub-regional levels in Britain and France. These new technological clusters - the `Technopoles' - are investigated in a series of papers in both English and French which examines their spatial, sectoral and economic aspects to determine what lessons can be learned from their development and what their future economic significance is likely to be. Two recurring themes are of particular significance in the papers - the link between R& D and regional development, and the different forms which innovation assumes within the various technopoles under scrutiny.
Resumo:
The construction industry has become a truly global network of interconnected stakeholders making demands which require the involvement of skilled workforces from all over the world. Construction Management Strategies sets the foundations for understanding and managing construction’s inherent complexity and uniqueness. It establishes clear definitions of commonly accepted terms like built environment, construction, civil engineering, etc. which are often given confusing and conflicting interpretations. It cuts through the plethora of overlapping role titles currently used in the construction sector that make it difficult to establish how projects are actually managed.
Resumo:
Human resource management (HRM) plays a pivotal role in attracting and retaining talents. However, there is growing recognition in international HRM literature that the adoption of the widely accepted US/Harvard-inspired HRM model ignores the influences of cultural contexts on HRM practices in different countries. This notion has not been empirically investigated in the construction industry. Based on survey responses from 604 construction professionals from Australia and Hong Kong, this study examines whether: (i) national cultural differences influence individuals’ preference for types of remuneration and job autonomy, (ii) actual organizational HRM practices reflect such preferences and (iii) gaps between individuals’ preferences and actual organizational HRM practices affect job satisfaction. Results showed significant difference in HRM preferences between Australian and Hong Kong respondents and these are reflected in the distinct types of HRM practices adopted by construction firms in the two countries. Findings further indicated that the gap between individuals’ preferences and actual organizational HRM practices is associated with job satisfaction. The results support existing mainstream research and highlight the deficiency of the acultural treatment of HRM that is still apparent in construction management literature. An uncritical literature in the area not only hinders theory development but also potentially undermines the ability of construction firms to attract, recruit, and retain scarce talents.
Resumo:
This article discusses the sources of competitive advantage in the interwar British radio industry. Specifically, it examines why sections of the industry that reaped substantial monopoly rents from the downstream value chain failed to dominate the industry. During the 1920s Marconi (which controlled the fundamental UK patents) had a key cost advantage, as had other members of the ‘Big Six’ electrical engineering firms which formed the BBC and were granted preferential royalties. Meanwhile the valve manufacturers' cartel was also able to extract high rents from set manufacturers. The vertical integration literature suggests that input monopolists have incentives to control downstream production. Yet—in contrast to the gramophone industry, which became concentrated into two huge companies following market saturation in the 1930s—radio retained a much more competitive structure. The Big Six failed to capitalize fully on their initial cost advantages owing to logistical weaknesses in supplying markets subject to rapid technical and design obsolescence. Subsequently, during the 1930s, marketing innovations are shown to have played a key role in allowing several independents to establish successful brands. This gave them sufficient scale to provide strong bargaining positions with input suppliers, negating most of their initial cost disadvantage.
Resumo:
Purpose – The construction industry is a very important part of the Malaysian economy. The government's aim is to make the industry more productive, efficient and safe. Small to medium-sized enterprises (SMEs) are at the core of the Malaysian construction industry and account for about 90 per cent of companies undertaking construction work. One of the main challenges faced by the Malaysian construction industry is the ability to absorb new knowledge and technology and to implement it in the construction phase. The purpose of this paper is to consider absorptive capacity in Malaysian construction SMEs in rural areas. Design/methodology/approach – The research was conducted in three stages: first, understanding the Malaysian construction industry; second, a literature review on the issues related to absorptive capacity and discussions with the Construction Industry Development Board (CIDB); and third, multiple case studies in five construction SMEs operating in a rural area to validate the factors influencing absorptive capacity. Findings – Nine key factors were identified influencing absorptive capacity in Malaysian construction SMEs operating in rural areas. These factors involved: cost and affordability; availability and supply; demand; infrastructure; policies and regulations; labour readiness; workforce attitude and motivation; communication and sources of new knowledge and; culture. Originality/value – The key factors influencing absorptive capacity presented in this paper are based on validation from the case studies in five construction SMEs in Malaysia. The research focuses on how they operate in rural areas; however, the research results have wider application than just Malaysia. The key factors identified as influencing absorptive capacity can serve as a basis for considering knowledge absorption in the wider context by SMEs in other developing countries.
Resumo:
This is a fully revised edition of the UK’s leading textbook on the law governing construction contracts and the management and administration of those contracts. Although the legal principles involved are an aspect of general contract law, the practical and commercial complexities of the construction industry have increasingly made this a specialist area. This new edition has been brought up to date with recent cases and developments in the law as it stands at March 2007. The basic approach of the book has been retained. Rather than provide a commentary on standard-form contracts, our approach is to introduce the general principles that underlie contracts in construction, illustrating them by reference to the most important standard forms currently in use. Some of the common standard-form contracts have been revised since the previous edition, and the text has been revised to take account of these changes. Practitioners (consultants, builders, clients and lawyers) will find this an extremely useful source of reference, providing in-depth explanations for all of the features found in contemporary construction contracts, with reasons. A unique feature of this book is the way that it brings together the relevant principles of law with the practical issues arising in construction cases. It is a key text for construction undergraduates and postgraduates as well as for those taking the RIBA Part III and CIOB Part II examinations.
Resumo:
This book looks at how auto-ID has evolved and how it can be used in the construction industry and across projects from the perspective of all the stakeholders, from owners to design consultants, contractors and the supply chain. It could help to improve efficiency, reduce costs, ensure quality, protect the environment, and enhance safety.
Resumo:
The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.
Resumo:
As pressões de mercado, os programas de abertura financeira, a desregulamentação da atividade produtiva e a diminuição de barreiras protecionistas afetam significativamente a competitividade da indústria nacional. Outras mudanças, não apenas econômicas, mas sociais, políticas e tecnológicas, também pressionam as organizações a adotar novas estratégias empresariais e deixam claro que modelos de gestão tradicionais já não são mais suficientes para enfrentar estes novos desafios. Na busca de diferenciais competitivos, as empresas têm adotado sistemas de gestão da qualidade, de gestão ambiental e de gestão da saúde e segurança do trabalhador. Como forma de evidenciar a terceiros sua preocupação simultânea com estas três disciplinas, as empresas têm buscado a certificação integrada destes sistemas por meio das normas ISO 9001, ISO 14001 e OHSAS 18001. Surgem, assim, os Sistemas de Gestão Integrados (SGIs), objetos de pesquisa deste estudo. O recorte é setorial, sendo que o setor de construção foi escolhido devido a características como singularidade de seus produtos, alto impacto ambiental e alto índice de acidentes de trabalho. Com o objetivo de investigar como os SGIs foram implementados no setor de construção, foram escolhidos três casos de empresas sabidamente adotantes deste modelo de gestão. Foram analisadas as motivações, o processo de implementação e certificação do sistema, os fatores críticos de sucesso, as dificuldades encontradas e os benefícios colhidos com a adoção de SGIs. A pesquisa confirmou estudos anteriores que demonstram que a motivação, dependendo do contexto em que as empresas se inserem, pode ser por necessidade de maior competitividade, de legitimação, ou ainda, por responsabilidade ambiental de sua liderança. Os fatores críticos de sucesso são, dentre outros, comprometimento da alta administração, comunicação eficiente com as partes interessadas, disponibilidade de recursos e maturidade das equipes. As dificuldades encontradas foram a valorização excessiva de resultados econômico-financeiros, a complexidade do modelo adotado, a utilização burocrática do sistema, a falta de maturidade e preparo dos profissionais, o porte dos projetos, o perfil de competências dos profissionais e variados tipos de resistências. A adoção do SGI nas empresas estudadas esteve condicionada a situações do cenário econômico, do alto índice de terceirização verificado no setor e às dificuldades com a qualificação da mão-de-obra. Não obstante as dificuldades e os condicionantes, o SGI trouxe vários benefícios para as organizações e, um dado relevante, é que ele pode desencadear reações positivas ao longo da cadeia de valor, uma vez que as empresas adotantes de SGI passam a ser mais exigentes em relação a seus fornecedores.