769 resultados para Construction Industry
Resumo:
This research identifies factors that are crucial to the success of a knowledge management system (KMS) implementation in a prominent Australian engineering consultancy firm. The study employs the Delphi method to solicit the opinions of experienced market leaders in the Australian construction industry, and then benchmarks the organisational profile of the consultancy firm against the Delphi findings. From this comparative case study, recommendations are made pertaining to the organisational and cultural changes required within the consultancy firm in order to improve its readiness to successfully implement a KMS.
Resumo:
Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.
Resumo:
This study unveils causes of accidents in repair, maintenance, alteration and addition (RMAA) work. RMAA work is playing an increasingly important role in developed societies, including Hong Kong. Safety problems associated with RMAA work in Hong Kong has reached an alarming level. In view of rapid expansion of the RMAA sector and rising proportion of accidents in the construction industry, there is a pressing need to investigate causes of RMAA accidents. Structured interviews were conducted with RMAA contractors to explore causes of accidents in the RMAA sector. A two-round Delphi method with 13 safety experts was subsequently employed to verify the interview findings and rank the relative degree of importance for various causes of accidents. Accidents happen in RMAA work due to intersection of reasons. One of the root causes of accidents in RMAA works is low safety awareness of RMAA workers; however, wider organizational and industrial factors are not negligible. This study sheds light on why accidents happen in the RMAA sector. Only when the factors leading to accidents are identified can effective measures be made.
Resumo:
Repair, maintenance, minor alteration, and addition work (RMAA) has become more and more important in developed societies, but its safety performance is alarming. For example, RMAA projects accounted for 53.2% of the total construction market and the percentage of RMAA accidents to all construction accidents in the Hong Kong Special Administrative Region (HKSAR) increased considerably in 2007. The RMAA sector has a huge potential for safety improvement. This study aims to explore and evaluate the difficulties of implementing safety practices in RMAA work. The mixed methods approach was adopted, and semistructured interviews and a two-round Delphi survey were conducted for the data collection. Major difficulties were identified, including limited safety resources for small and medium enterprises (SMEs), difficulty in changing the mindset of RMAA workers, and difficulty in performing safety supervision. These obstacles for implementing safety practices in the RMAA sector, if successfully removed, could significantly improve the safety performance of the RMAA sector and the construction industry as a whole.
Resumo:
The accident record of the repair, maintenance, minor alteration, and addition (RMAA) sector has been alarmingly high; however, research in the RMAA sector remains limited. Unsafe behavior is considered one of the key causes of accidents. Thus, the organizational factors that influence individual safety behavior at work continue to be the focus of many studies. The safety climate, which reflects the true priority of safety in an organization, has drawn much attention. Safety climate measurement helps to identify areas for safety improvement. The current study aims to identify safety climate factors in the RMAA sector. A questionnaire survey was conducted in the RMAA sector in Hong Kong. Data were randomly split into the calibration and the validation samples. The RMAA safety climate factors were determined by exploratory factor analysis on the calibration sample. Three safety climate factors of the RMAA works were identified: (1) management commitment to occupational health and safety (OHS) and employee involvement, (2) application of safety rules and work practices, and; (3) responsibility for health and safety. Confirmatory factor analysis (CFA) was then conducted on the validation sample. The CFA model showed satisfactory goodness of fit, reliability, and validity. The suggested RMAA safety climate factors can be utilized by construction industry practitioners in developed economies to measure the safety climate of their RMAA projects, thereby enhancing the safety of RMAA works.
Resumo:
Purpose Managing and maintaining infrastructure assets are one of the indispensible tasks for many government agencies to preserve the nations' economic viability and social welfare. To reduce the expenditures over the life-cycle of an infrastructure asset and extend the period for which the asset performs effectively, proper repair and maintenance are essential. While repair, maintenance, minor alteration and addition (RMAA) sector is expanding in many developed cities, occurrences of fatalities and injuries in this sector are also soaring. The purposes of this paper are to identify and then evaluate the various strategies for improving the safety performance of RMAA works. Design/methodology/approach Semi-structured interviews and two rounds of Delphi survey were conducted for data collection. Findings Raising safety awareness of RMAA workers and selecting contractors with a good record of safety performance are the two most important strategies to improve the safety performance in this sector. Technology innovations and a pay-for-safety scheme are regarded as the two least important strategies. Originality/value The paper highlights possible ways to enhance safety of the rather under-explored RMAA sector in the construction industry.
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. With the increasing level of public awareness and government regulatory measures, the construction industry is experiencing a cultural shift to recognise, embrace and pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and the financial implications of including them on a lifecycle basis. They need tools that can aid the evaluation of investment options. To date, however, there have not been many financial assessments on the sustainability aspects of highway projects. This is because the existing life-cycle costing analysis (LCCA) models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper provides insights into the current practice of life-cycle cost analysis, and the identification and quantification of sustainability-related cost components in highway projects through literature review, questionnaire surveys and semi-structured interviews. The results can serve as a platform for highway project stakeholders to develop practical tools to evaluate highway investment decisions and reach an optimum balance between financial viability and sustainability deliverables.
Resumo:
The design-build (DB) system is regarded as an effective means of delivering sustainable buildings. Specifying clear sustainability requirements to potential contractors is of great importance to project success. This research investigates the current state-of-the-practice for the definition of sustainability requirements within the public sectors of the U.S. construction market using a robust content analysis of 49 DB requests for proposals (RFPs). The results reveal that owners predominantly communicate their desired level of sustainability through the LEED certification system. The sustainability requirement has become an important dimension for the best-value evaluation of DB contractors with specific importance weightings of up to 25%. Additionally, owners of larger projects and who provide less design information in their RFPs generally allocate significantly higher importance weightings to sustainability requirements. The primary knowledge contribution of this study to the construction industry is the reveal of current trend in DB procurement for green projects. The findings also provide owners, architects, engineers, and constructors with an effective means of communicating sustainability objectives in solicitation documents.
Resumo:
Safety climate is a current interest to construction practitioners and researchers. The concept of safety climate has been actively explored in the field of Industrial and Organizational (I/O) psychology but yet in the construction industry. This paper aims to review the literature of safety climate in a systematic manner and highlight future directions for safety research and development of safety practices in the construction industry. The value of safety climate lies on its ability to predict safety behavior. Safety climate, as a mediator, unfolds the relationship between organizational variables and safety behavior. It, as a moderator, affects the effectiveness of any safety initiatives to improve safety performance. Future research directions would be likely to look at relationship between organizational factors and safety climate using multi-level analysis. To the construction industry, safety climate measurement is a good indicator to assess safety performance. Empirical studies show that frontline supervisor would be the best conduit to create a positive safety climate at workgroup level. It is believed that this paper is beneficial to researchers interested in behavioral aspect of construction safety and industry practitioners striving for safety on site.
Resumo:
This paper gives an overview of an ongoing project endeavouring to advance theory-based production and project management, and the rationale for this approach is briefly justified. The status of the theoretical foundation of production management, project management and allied disciplines is discussed, with emphasis on metaphysical grounding of theories, as well as the nature of the heuristic solution method commonly used in these disciplines. Then, on-going work related to different aspects of production and project management is reviewed from both theoretical and practical orientation. Next, information systems agile project management is explored with a view to its re-use in generic project management. In production management, the consequences and implementation of a new, wider theoretical basis are analyzed. The theoretical implications and negative symptoms of the peculiarities of the construction industry for supply chains and supply chain management in construction are observed. Theoretical paths for improvements of inter-organisational relationships in construction which are fundamental for improvement of construction supply chains are described. To conclude, the observations made in this paper vis-à-vis production, project and supply chain management are related again to the theoretical basis of this paper, and finally directions for theory development and future research are given and discussed.
Resumo:
The Construction industry accounts for a tenth of global GDP. Still, challenges such as slow adoption of new work processes, islands of information, and legal disputes, remain frequent, industry-wide occurrences despite various attempts to address them. In response, IT-based approaches have been adopted to explore collaborative ways of executing construction projects. Building Information Modelling (BIM) is an exemplar of integrative technologies whose 3D-visualisation capabilities have fostered collaboration especially between clients and design teams. Yet, the ways in which specification documents are created and used in capturing clients' expectations based on industry standards have remained largely unchanged since the 18th century. As a result, specification-related errors are still common place in an industry where vast amounts of information are consumed as well as produced in the course project implementation in the built environment. By implication, processes such as cost planning which depend on specification-related information remain largely inaccurate even with the use of BIM-based technologies. This paper briefly distinguishes between non-BIM-based and BIM-based specifications and reports on-going efforts geared towards the latter. We review exemplars aimed at extending Building Information Models to specification information embedded within the objects in a product library and explore a viable way of reasoning about a semi-automated process of specification using our product library.
Resumo:
Global climate change is one of the most significant environmental impacts at the moment. One central issue for the building and construction industry to address global climate change is the development of credible carbon labelling schemes for building materials. Various carbon labelling schemes have been developed for concrete due to its high contribution to global greenhouse gas (GHG) emissions. However, as most carbon labelling schemes adopt cradle-to-gate as system boundary, the credibility of the eco-label information may not be satisfactory because recent studies show that the use and end-of-life phases can have a significant impact on the life cycle GHG emissions of concrete in terms of carbonation, maintenance and rehabilitation, other indirect emissions, and recycling activities. A comprehensive review on the life cycle assessment of concrete is presented to holistically examine the importance of use and end-of-life phases to the life cycle GHG quantification of concrete. The recent published ISO 14067: Carbon footprint of products – requirements and guidelines for quantification and communication also mandates the use of cradle-to-grave to provide publicly available eco-label information when the use and end-of-life phases of concrete can be appropriately simulated. With the support of Building Information Modelling (BIM) and other simulation technologies, the contribution of use and end-of-life phases to the life cycle GHG emissions of concrete should not be overlooked in future studies.
Resumo:
As the proportion of older employees in the workforce is growing, researchers have become increasingly interested in the association between age and occupational well-being. The curvilinear nature of relationships between age and job satisfaction and between age and emotional exhaustion is well-established in the literature, with employees in their late 20s to early 40s generally reporting lower levels of occupational well-being than younger and older employees. However, the mechanisms underlying these curvilinear relationships are so far not well understood due to a lack of studies testing mediation effects. Based on an integration of role theory and research from the adult development and career literatures, this study examined time pressure, work–home conflict, and coworker support as mediators of the relationships between age and job satisfaction and between age and emotional exhaustion. Data came from 771 employees between 17 and 74 years of age in the construction industry. Results showed that employees in their late 20s to early 40s had lower job satisfaction and higher emotional exhaustion than younger and older employees. Time pressure and coworker support fully mediated both the U-shaped relationship between age and job satisfaction and the inversely U-shaped relationship between age and emotional exhaustion. These findings suggest that organizational interventions may help increase the relatively low levels of occupational well-being in certain age groups.
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
The introduction of Building Information Modelling (BIM) to the design, construction and operation of buildings is changing the way that the building construction industry works. BIM involves the development of a full 3D virtual model of a building which not only contains the 3D information necessary to show the building as it will appear, but also contains significant additional data about each component in the building. BIM represents both physical and virtual objects in a building. This includes the rooms and spaces within and around the building. The additional data stored on each part of the building can support building maintenance opera- tions and, more importantly from the perspective of this paper, support the generation and running of simula- tions of the operation of the building and behaviour of people within it under both normal and emergency scenarios. The initial discussion is around the use of BIM to support the design of resilient buildings which references the various codes and standards that define current best practice. The remainder of the discussion uses various recent events as the basis for discussion on how BIM could have been used to support rapid recovery and re- building.