876 resultados para project planning and controlling


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research project has developed a novel decision support system using Geographical Information Systems and Multi Criteria Decision Analysis and used it to develop and evaluate energy-from-waste policy options. The system was validated by applying it to the UK administrative areas of Cornwall and Warwickshire. Different strategies have been defined by the size and number of the facilities, as well as the technology chosen. Using sensitivity on the results from the decision support system, it was found that key decision criteria included those affected by cost, energy efficiency, transport impacts and air/dioxin emissions. The conclusions of this work are that distributed small-scale energy-from-waste facilities score most highly overall and that scale is more important than technology design in determining overall policy impact. This project makes its primary contribution to energy-from-waste planning by its development of a Decision Support System that can be used to assist waste disposal authorities to identify preferred energy-from-waste options that have been tailored specifically to the socio-geographic characteristics of their jurisdictional areas. The project also highlights the potential of energy-from-waste policies that are seldom given enough attention to in the UK, namely those of a smaller-scale and distributed nature that often have technology designed specifically to cater for this market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter reports on a framework that has been successfully used to analyze the e-business capabilities of an organization with a view to developing their e-capability maturity levels. This should be the first stage of any systems development project. The framework has been used widely within start-up companies and well-established companies both large and small; it has been deployed in the service and manufacturing sectors. It has been applied by practitioners and consultants to help improve e-business capability levels, and by academics for teaching and research purposes at graduate and undergraduate levels. This chapter will provide an account of the unique e-business planning and analysis framework (E-PAF) and demonstrate how it works via an abridged version of a case study (selected from hundreds that have been produced). This will include a brief account of the three techniques that are integrated to form the analysis framework: quality function deployment (QFD) (Akao, 1972), the balanced scorecard (BSC) (Kaplan & Norton, 1992), and value chain analysis (VCA) (Porter, 1985). The case study extract is based on an online community and dating agency service identified as VirtualCom which has been produced through a consulting assignment with the founding directors of that company and has not been published previously. It has been chosen because it gives a concise, comprehensive example from an industry that is relatively easy to relate to.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Több mint száz éve született meg Henry Gantt (Gantt, 1910) sávos ütemterve, Kelley (Kelley, 1961) és Walker (Walker, 1959) is több mint hatvan éve publikálta kritikus út módszerét. Az ezekre épülő költség- és erőforrás- tervezési módszerek vajon alkalmasak-e a ma kihívásaira? Az olvasó ebben a tanulmányban többéves kutatómunka gyümölcsét láthatja. A kutatás során az egyik legfontosabb cél annak vizsgálata volt, hogy a meglévő projekttervezési eszközök mennyiben felelnek meg a mai projektek kihívásainak; hol és milyen területen van szükség e módszerek továbbfejlesztésére, esetleg meghaladására. Ebben a tanulmányban a szerző olyan módszereket mutat be, amelyek messze túlvezetnek bennünket a projekttervezés eddig elsősorban operatív feladatokra szorítkozó módszereitől, és olyan kérdések megválaszolására fordítja figyelmünket, mint pl. milyen tevékenységeket, projekteket valósítsunk meg; melyeket hagyjuk el vagy ütemezzük be egy későbbi projektbe; hogyan rangsoroljuk, priorizáljuk a projektek megvalósítását, fontosságát? ______ Gantt chart (Gantt, 1910) was born by Henry Gantt more than a hundred years ago. Kelley and Walker published their critical planning method more than a 60 years ago (see i.e. Kelley-Walker, 1959). Can we use methods based on network planning methods for the challenges of 21st century? In this paper the author can see the results of the recent researches. In this study with their colleagues he investigated which project planning methods can be used in challenges of the 21st century and where and how to improve them. In these researches new matrix-based project planning methods are specified, where they can deal not only operative but strategic questions: which subprojects/tasks should be completed, how to treat priorities of completion in case of defining logic planning, how to support not only traditional but agile project management approaches.In this paper he introduces a new matrix-based method, which can be used for ranking project or multi project scenarios with different kinds of target functions. The author shows methods that are used in an expert module. He shows how to integrate this expert module into the traditional PMS system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Adaptive management has been defined and redefined in the context of natural resource management, yet there are few examples of its successful application in ecological restoration. Although the 2009 Delta Reform Act now legally requires adaptive management for all restoration efforts in the Sacramento-San Joaquin Delta, in California, USA, projects in this region still encounter problems with implementation. We used a comparative case study analysis to examine adaptive management planning and implementation both in and around the Delta, assessing not only why adaptive management is not yet well implemented, but also what changes can be made to facilitate the adaptive management approach without sacrificing scientific rigor. Adaptive management seems to be directly and indirectly affected by a variety of challenges and convoluted by ambiguity in both planning documents and practitioner’s interpretations of the concept. Addressing these challenges and ambiguities at the project level may facilitate the adaptive management process and help make it more accessible to practitioners.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Part 13: Virtual Reality and Simulation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The rate of diagnosis and treatment of degenerative spine disorders is increasing, increasing the need for surgical intervention. Posterior spine fusion is one surgical intervention used to treat various spine degeneration pathologies To minimize the risk of complications and provide patients with positive outcomes, preoperative planning and postsurgical assessment are necessary. This PhD aimed to investigate techniques for the surgical planning and assessment of spine surgeries. Three main techniques were assessed: stereophotogrammetric motion analysis, 3D printing of complex spine deformities and finite element analysis of the thoracolumbar spine. Upon reviewing the literature on currently available spine kinematics protocol, a comprehensive motion analysis protocol to measure the multi-segmental spine motion was developed. Using this protocol, the patterns of spine motion in patients before and after posterior spine fixation was mapped. The second part investigated the use of virtual and 3D printed spine models for the surgical planning of complex spine deformity correction. Compared to usual radiographic images, the printed model allowed optimal surgical intervention, reduced surgical time and provided better surgeon-patient communication. The third part assessed the use of polyetheretherketone rods auxiliary to titanium rods to reduce the stiffness of posterior spine fusion constructs. Using a finite element model of the thoracolumbar spine, the rods system showed a decrease in the overall stress of the uppermost instrumented vertebra when compared to regular fixation approaches. Finally, a retrospective biomechanical assessment of a lumbopelvic reconstruction technique was investigated to assess the patients' gait following the surgery, the implant deformation over the years and the extent of bony fusion between spine and implant. In conclusion, this thesis highlighted the need to provide surgeons with new planning and assessment techniques to better understand postsurgical complications. The methodologies investigated in this project can be used in the future to establish a patient-specific planning protocol.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We reported here for the first time that triboelectric charges on PET sheets can be used to seal and control the flow rate in paper-based devices. The proposed method exhibits simplicity and low cost, provides reversible sealing and minimizes the effect of sample evaporation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the development of an optimization model for the management and operation of a large-scale, multireservoir water supply distribution system with preemptive priorities. The model considers multiobjectives and hedging rules. During periods of drought, when water supply is insufficient to meet the planned demand, appropriate rationing factors are applied to reduce water supply. In this paper, a water distribution system is formulated as a network and solved by the GAMS modeling system for mathematical programming and optimization. A user-friendly interface is developed to facilitate the manipulation of data and to generate graphs and tables for decision makers. The optimization model and its interface form a decision support system (DSS), which can be used to configure a water distribution system to facilitate capacity expansion and reliability studies. Several examples are presented to demonstrate the utility and versatility of the developed DSS under different supply and demand scenarios, including applications to one of the largest water supply systems in the world, the Sao Paulo Metropolitan Area Water Supply Distribution System in Brazil.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A framework for and overview of the key elements of language planning is presented covering status planning, corpus planning, language-in-education planning, prestige planning and critical approaches to language planning. Within each of these areas, key articles outlining important recent directions are discussed indicating the field’s new found sense of vitality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Surgical resection in locally advanced breast cancer produces large defects that may not be suitable for primary closure. Immediate reconstruction is controversial and presents a complicated scenario for breast surgeons and plastic surgeons. Methods: In this study, a different design was planned for the latissimus dorsi musculocutaneous flap with primary closure in V-Y for the correction of major lesions in the anterior chest wall. Twenty-five patients underwent immediate locally advanced breast cancer reconstruction with a V-Y latissimus dorsi musculocutaneous flap. This flap was raised from adjacent tissue located on the lateral and posterior thoracic region and presented a triangular shape whose base was the lateral aspect of the mastectomy wound. The technique was indicated in patients with large thoracic wounds. Results: Mean follow-up time was 16 months. Closure was obtained in the donor and recipient sites without the use of skin grafts or other more major procedures. Complications occurred in nine patients (36 percent), including dorsal wound dehiscence in five patients and seroma in three. All cases except one were treated by a conservative approach with a good result. No total flap loss was reported. All patients achieved a satisfactory thoracic reconstruction and adequate wound care. Conclusions: The V-Y latissimus dorsi musculocutaneous flap is a reliable technique for immediate locally advanced breast cancer reconstruction. The technique is advantageous because the V-Y design allows primary closure of the chest wound and donor defect. Success depends on patient selection, coordinated planning with the breast cancer surgeon, and careful intraoperative management. (Plast. Reconstr. Surg. 127: 2186, 2011.)