825 resultados para performance assessment
Resumo:
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.
Resumo:
This paper presents a framework based upon a relationship between environmental benefits and the investments and costs needed to implement and run company operations. As the results of environmental management become more evident it is proposed that the benefits rather than the environmental impacts are measured in the analysis of environmental performance. Four categories, or stages, are defined in this paper: “creative-green”, “expensive-green”, “inefficient-green or beginner”, and finally, the “complacent” stage. The paper describes the characteristics of each category and provides examples of indicators that could be used to measure environmental benefits. Qualitative and quantitative methods are necessary to classify companies according to the framework. It is believed that this paper can assist companies and public organisations to assess operations and projects considering their level of sustainability. The proposed framework can impact FDI and environmental policies in the public arena, and foster innovation on environmental practices within the private sector.
Resumo:
Purpose ‐ This study provides empirical evidence for the contextuality of marketing performance assessment (MPA) systems. It aims to introduce a taxonomical classification of MPA profiles based on the relative emphasis placed on different dimensions of marketing performance in different companies and business contexts. Design/methodology/approach ‐ The data used in this study (n=1,157) were collected using a web-based questionnaire, targeted to top managers in Finnish companies. Two multivariate data analysis techniques were used to address the research questions. First, dimensions of marketing performance underlying the current MPA systems were identified through factor analysis. Second, a taxonomy of different profiles of marketing performance measurement was created by clustering respondents based on the relative emphasis placed on the dimensions and characterizing them vis-á-vis contextual factors. Findings ‐ The study identifies nine broad dimensions of marketing performance that underlie the MPA systems in use and five MPA profiles typical of companies of varying sizes in varying industries, market life cycle stages, and competitive positions associated with varying levels of market orientation and business performance. The findings support the previously conceptual notion of contextuality in MPA and provide empirical evidence for the factors that affect MPA systems in practice. Originality/value ‐ The paper presents the first field study of current MPA systems focusing on combinations of metrics in use. The findings of the study provide empirical support for the contextuality of MPA and form a classification of existing contextual systems suitable for benchmarking purposes. Limited evidence for performance differences between MPA profiles is also provided.
Resumo:
Over the course of the last twenty years there has been a growing academic interest in performance management, particularly in respect of the evolution of new techniques and their resulting impact. One important theoretical development has been the emergence of multidimensional performance measurement models that are potentially applicable within the public sector. Empirically, academic researchers are increasingly supporting the use of such models as a way of improving public sector management and the effectiveness of service provision (Mayston, 1985; Pollitt, 1986; Bates and Brignall, 1993; and Massey, 1999). This paper seeks to add to the literature by using both theoretical and empirical evidence to argue that CPA, the external inspection tool used by the Audit Commission to evaluate local authority performance management, is a version of the Balanced Scorecard which, when adapted for internal use, may have beneficial effects. After demonstrating the parallels between the CPA framework and Kaplan and Norton's public sector Balanced Scorecard (BSC), we use a case study of the BSC based performance management system in Hertfordshire County Council to demonstrate the empirical linkages between a local scorecard and CPA. We conclude that CPA is based upon the BSC and has the potential to serve as a springboard for the evolution of local authority performance management systems.
Resumo:
Current artificial heart valves are classified as mechanical and bioprosthetic. An appealing pathway that promises to overcome the shortcomings of commercially available heart valves is offered by the interdisciplinary approach of cardiovascular tissue engineering. However, the mechanical properties of the Tissue Engineering Heart Valves (TEHV) are limited and generally fail in the long-term use. To meet this performance challenge novel biodegradable triblock copolymer poly(ethylene oxide)-polypropylene oxide)-poly(ethylene oxide) (PEO-PPO-PEO or F108) crosslinked to Silk Fibroin (F108-SilkC) to be used as tri-leaflet heart valve material was investigated. ^ Synthesis of ten polymers with varying concentration and thickness (55 µm, 75 µm and 100 µm) was achieved via a covalent crosslinking scheme using bifunctional polyethylene glycol diglycidyl ether (PEGDE). Static and fatigue testing were used to assess mechanical properties of films, and hydrodynamic testing was performed to determine performance under a simulated left ventricular flow regime. The crosslinked copolymer (F108-Silk C) showed greater flexibility and resilience, but inferior ultimate tensile strength, by increasing concentration of PEGDE. Concentration molar ratio of 80:1 (F108: Silk) and thickness of 75 µm showed longer fatigue life for both tension-tension and bending fatigue tests. Four valves out of twelve designed satisfactorily complied with minimum performance requirement ISO 5840, 2005. ^ In conclusion, it was demonstrated that the applicability of a degradable polymer in conjugation with silk fibroin for tissue engineering cardiovascular use, specifically for aortic valve leaflet design, met the performance demands. Thinner thicknesses (t<75 µm) in conjunction with stiffness lower than 320 MPa (80:1, F108: Silk) are essential for the correct functionality of proposed heart valve biomaterial F108-SilkC. Fatigue tests were demonstrated to be a useful tool to characterize biomaterials that undergo cyclic loading. ^
Resumo:
Investigation of the performance of engineering project organizations is critical for understanding and eliminating inefficiencies in today’s dynamic global markets. The existing theoretical frameworks consider project organizations as monolithic systems and attribute the performance of project organizations to the characteristics of the constituents. However, project organizations consist of complex interdependent networks of agents, information, and resources whose interactions give rise to emergent properties that affect the overall performance of project organizations. Yet, our understanding of the emergent properties in project organizations and their impact on project performance is rather limited. This limitation is one of the major barriers towards creation of integrated theories of performance assessment in project organizations. The objective of this paper is to investigate the emergent properties that affect the ability of project organization to cope with uncertainty. Based on the theories of complex systems, we propose and test a novel framework in which the likelihood of performance variations in project organizations could be investigated based on the environment of uncertainty (i.e., static complexity, dynamic complexity, and external source of disruption) as well as the emergent properties (i.e., absorptive capacity, adaptive capacity, and restorative capacity) of project organizations. The existence and significance of different dimensions of the environment of uncertainty and emergent properties in the proposed framework are tested based on the analysis of the information collected from interviews with senior project managers in the construction industry. The outcomes of this study provide a novel theoretical lens for proactive bottom-up investigation of performance in project organizations at the interface of emergent properties and uncertainty
Resumo:
As advances in numerical modelling techniques support the increased confidence in predictions from computer simulations, the need remains to have experimental verification built into the design process. This paper outlines the experimental investigation carried out on a shielded vertical axis turbine in a marine environment. The experiments consist of performance measurements and the use of particle image velocimetry on a small scale device in a marine current flume. The results demonstrate that the performance of the device can be modelled numerically; in particular, the results show that the numerical model used can correctly predict the increase in performance with Reynolds number.
Resumo:
Part 16: Performance Measurement Systems
Resumo:
This project is focused on exchanging knowledge between ABS, UKBI and managers of business incubators in the UK. The project relates to exploitation of extant knowledge-base on assessing and improving business incubation management practice and performance and builds on two earlier studies. It addresses a pressing need for assessing and benchmarking business incubation input, process and outcome performance and highlighting best practice. The overarching aim of this project was to obtain proof-of-concept for a business incubation performance assessment and benchmarking online tool, fine-tune it and put it in use by nurturing a community of business incubation management practice, aligned by the resultant tool. The purpose was to offer an appropriate set of measures, in areas identified by relevant research on business incubation performance management and impact as critical, against which: 1.The input and process performance of business incubation management practice can be assessed and benchmarked within the auspices of a community of incubator managers concerned with best practice 2.The outcome performance and impact of business incubators can be assessed longitudinally. As such, the developed online assessment framework is geared towards the needs of researchers, policy makers and practitioners concerned with business incubation performance, added value and impact.
Resumo:
The paper charts the history and development of the Hong Kong Housing Department (HKHD) Performance Assessment Scoring System (PASS) from 1990 to the present day and examines its effect on facilitating change to the quality of construction work of building contractors engaged in the production of public sector housing projects Hong Kong. The paper builds partly on empirical research carried out by the author as part of a doctoral thesis from 2000 to 2005, on experiential knowledge and also on some relevant case studies. The outcomes from this earlier research and validation of PASS based on results derived from the system since the research was originally undertaken are of benefit to practitioners and academics working and studying in the areas of performance assessment and organisational culture and change. The conclusions presented in the paper further underpin the connection established in previous research between strong organisational culture and project and corporate success. Organisational culture was measured using a survey instrument originally developed by Denison and Neale (1994), adapted for the environment of the study, and corporate success was measured by the PASS system mentioned above. The major results of the original study indicate that there is significant linkage between strong organisational cultures and business success and the detailed findings were that, (1) strong organisational culture was positively associated a high level of company effectiveness, (2) a high level of company effectiveness was positively associated with the cultural traits of ‘consistency’, ‘adaptability’ and ‘mission’, and (3) a high level of company effectiveness was positively associated with the combined cultural traits represented by the dimensions of ‘external focus’ and ‘stable culture’. Several opportunities to take forward this research have been identified, including extending the study to other countries and also longitudinally re-evaluating some of the original case studies to ascertain how organisational cultures have changed or further developed in relation to the changing construction climate in Hong Kong.
Resumo:
The purpose of this paper is to summarize the outcomes of a detailed research study carried out as part of the fulfilment of a doctoral programme which examined the relationships between, and impacts of organisational culture on construction performance within a Hong Kong context. The research used a mixed methodology approach consisting of an organisational culture survey using an adapted validated and reliable measurement instrument (the Denison Organisational Culture Survey), mini-case studies in four Hong Kong construction companies and correlated the derived culture scores against performance scores measured by the Hong Kong Housing Department Performance Assessment Scoring System (PASS). The significance of the research was to advance knowledge of the importance of organisational culture strength as a performance driver in the construction industry and the further proof of the culture performance links using a set of measures of the latter which were not financially-based. The findings of the research make a contribution to theory by further validating the work by Denison (1990) and others, not only in that a successful link between organisational culture and performance was demonstrated, but it also identifies particular cultural factors in organisations that appear to be significantly responsible for achieving successful outcomes and reveals opportunities for further research into the organisational culture of construction companies Keywords: organisational culture, construction performance, business success.
Resumo:
Currently in Australia, there are no decision support tools for traffic and transport engineers to assess the crash risk potential of proposed road projects at design level. A selection of equivalent tools already exists for traffic performance assessment, e.g. aaSIDRA or VISSIM. The Urban Crash Risk Assessment Tool (UCRAT) was developed for VicRoads by ARRB Group to promote methodical identification of future crash risks arising from proposed road infrastructure, where safety cannot be evaluated based on past crash history. The tool will assist practitioners with key design decisions to arrive at the safest and the most cost -optimal design options. This paper details the development and application of UCRAT software. This professional tool may be used to calculate an expected mean number of casualty crashes for an intersection, a road link or defined road network consisting of a number of such elements. The mean number of crashes provides a measure of risk associated with the proposed functional design and allows evaluation of alternative options. The tool is based on historical data for existing road infrastructure in metropolitan Melbourne and takes into account the influence of key design features, traffic volumes, road function and the speed environment. Crash prediction modelling and risk assessment approaches were combined to develop its unique algorithms. The tool has application in such projects as road access proposals associated with land use developments, public transport integration projects and new road corridor upgrade proposals.
Resumo:
Performance based planning is a form of planning regulation that is not well understood and the theoretical advantages of this type of planning are rarely achieved in practice. Normatively, this type of regulation relies on performance standards that are quantifiable and technically based which are designed to manage the effects of development, where performance standards provide certainty in respect of the level of performance and the means of achievement is flexible. Few empirical studies have attempted to examine how performance based planning has been conceptualised and implemented in practice. Existing literature is predominately anecdotal and consultant based (Baker et al. 2006) and has not sought to quantitatively examine how land use has been managed or determine how context influences implementation. The Integrated Planning Act 1997 (IPA) operated as Queensland’s principal planning legislation between March 1998 and December 2009. The IPA prevented Local Governments from prohibiting development or use and the term zone was absent from the legislation. While the IPA did not use the term performance based planning, the system is widely considered to be performance based in practice (e.g. Baker et al. 2006; Steele 2009a, 2009b). However, the degree to which the IPA and the planning system in Queensland is performance based is debated (e.g. Yearbury 1998; England 2004). Four research questions guided the research framework using Queensland as the case study. The questions sought to: determine if there is a common understanding of performance based planning; identify how performance based planning was expressed under the IPA; understand how performance based planning was implemented in plans; and explore the experiences of participants in the planning system. The research developed a performance adoption spectrum. The spectrum describes how performance based planning is implemented, ranging between pure and hybrid interpretations. An ex-post evaluation of seventeen IPA plans sought to determine plan performativity within the conceptual spectrum. Land use was examined from the procedural dimension of performance (Assessment Tables) and the substantive dimension of performance (Codes). A documentary analysis and forty one interviews supplemented the research. The analytical framework considered how context influenced performance based planning, including whether: the location of the local government affected land use management techniques; temporal variation in implementation exists; plan-making guidelines affected implementation; different perceptions of the concept exist; this type of planning applies to a range of spatial scales. Outcomes were viewed as the medium for determining the acceptability of development in Queensland, a significant departure from pure approaches found in the United States. Interviews highlighted the absence of plan-making direction in the IPA, which contributed to the confusion about the intended direction of the planning system and the myth that the IPA would guarantee a performance based system. A hybridised form of performance based planning evolved in Queensland which was dependent on prescriptive land use zones and specification of land use type, with some local governments going to extreme lengths to discourage certain activities in a predetermined manner. Context had varying degrees of influence on plan-making methods. Decision-making was found to be inconsistent and the system created a range of unforeseen consequences including difficulties associated with land valuation, increased development speculation, and the role of planners in court was found to be less critical than in the previous planning system.