855 resultados para parallel bridge
Resumo:
Cases of high-sided vehicles striking low bridges is a large problem in many countries, especially the UK. This paper describes an experiment to evaluate a new design of markings for low bridges. A full size bridge was constructed which was capable of having its overhead clearance adjusted. Subjects sat in a truck cab as. it drove towards the bridge and were asked to judge whether the vehicle could pass safely under the bridge. The main objective of the research, was to determine whether marking the bridge with a newly devised experimental marking would result in more cautious decisions from subjects regarding whether or not the experimental bridge structure could be passed under safely compared with the currently used UK bridge marking standard. The results show that the type of bridge marking influenced the level of caution associated with decisions regarding bridge navigation, with the new marking design producing the most cautious decisions for the two different bridge heights used, at all distances away from the bridge structure. Additionally, the distance before the bridge at which decisions were given had an effect on the level of caution associated with decisions regarding bridge navigation (the closer to the bridge, the more cautious the decisions became, irrespective of the marking design). The implications of these results for reducing the number of bridge strikes are discussed. (C) 2002 Elsevier Science Ltd. All rights reserved.
Resumo:
Solid earth simulations have recently been developed to address issues such as natural disasters, global environmental destruction and the conservation of natural resources. The simulation of solid earth phenomena involves the analysis of complex structures including strata, faults, and heterogeneous material properties. Simulation of the generation and cycle of earthquakes is particularly important, but such simulations require the analysis of complex fault dynamics. GeoFEM is a parallel finite-element analysis system intended for solid earth field phenomena problems. This paper describes recent development in the GeoFEM project for the simulation of earthquake generation and cycles.
Resumo:
One of the major regulators of mitosis in somatic cells is cdc25B. cdc25B is tightly regulated at multiple levels. The final activation step involves the regulated binding of 14-3-3 proteins. Previous studies have demonstrated that Ser-323 is a primary 14-3-3 binding site in cdc25B, which influences its activity and cellular localization. 14-3-3 binding to this site appeared to interact with the N-terminal domain of cdc25B to regulate its activity. The presence of consensus 14-3-3 binding sites in the N-terminal domain suggested that the interaction is through direct binding of the 14-3-3 dimer to sites in the N-terminal domain. We have identified Ser-151 and Ser-230 in the N-terminal domain as functional 14-3-3 binding sites utilized by cdc25B in vivo. These low affinity sites cooperate to bind the 14-3-3 dimer bound to the high affinity Ser-323 site, thus forming an intramolecular bridge that constrains cdc25B structure to prevent access of the catalytic site. Loss of 14-3-3 binding to either N-terminal site relaxes cdc25B structure sufficiently to permit access to the catalytic site, and the nuclear export sequence located in the N-terminal domain. Mutation of the Ser-323 site was functionally equivalent to the mutation of all three sites, resulting in the complete loss of 14-3-3 binding, increased access of the catalytic site, and access to nuclear localization sequence.
Resumo:
A switch-mode assisted linear amplifier (SMALA) combining a linear (Class B) and a switch-mode (Class D) amplifier is presented. The usual single hysteretic controlled half-bridge current dumping stage is replaced by two parallel buck converter stages, in a parallel voltage controlled topology. These operate independently: one buck converter sources current to assist the upper Class B output device, and a complementary converter sinks current to assist the lower device. This topology lends itself to a novel control approach of a dead-band at low power levels where neither class D amplifier assists, allowing the class B amplifier to supply the load without interference, ensuring high fidelity. A 20 W implementation demonstrates 85% efficiency, with distortion below 0.08% measured across the full audio bandwidth at 15 W. The class D amplifier begins assisting at 2 W, and below this value, the distortion was below 0.03%. Complete circuitry is given, showing the simplicity of the additional class D amplifier and its corresponding control circuitry.
Resumo:
Este Trabalho refere-se ao Projecto de Execução de Fundações e Estruturas de uma Ponte Rodoviária em betão armado pré-esforçado, realizado no âmbito do Trabalho Final de Mestrado em Engenharia Civil – Especialização em Estruturas, do Instituto Superior de Engenharia de Lisboa. O Projecto de Execução é composto de Peças Escritas e Peças Desenhadas. Nas Peças Escritas estão incluídos: Memória Justificativa e Descritiva; Cálculos Justificativos e Anexos. A ponte é composta por dois tabuleiros paralelos com 10,28m de largura cada um e afastados entre si de 0,10m. A obra é constituída de 8 tramos; os tramos correntes com 31m de comprimento e os tramos extremos com 25 e 20m de comprimento, perfazendo um comprimento total de 231m. A obra foi parcialmente isolada dos sismos pela introdução, em todos os pilares, de aparelhos de apoio de elevado amortecimento sísmico do tipo HDRB (High Damping Rubber Bearings). Encontram-se particularmente discriminadas e detalhadas neste projecto as seguintes situações: - Cálculo do Pré-esforço e respectivas perdas; - Acção das sobrecargas rodoviárias; - Diferença de comportamento da obra na entrada em serviço e no longo prazo; - Análise sísmica e do isolamento sísmico; - Estudo dos efeitos diferidos: retracção e fluência. Tendo as abordagens de cálculo e as verificações de segurança seguido a regulamentação nacional em vigor, nomeadamente RSA e REBAP, foi no entanto feita uma aproximação às regras do “Capacity Design” previstas no EC8, em que se privilegia a actuação do projectista sobre o comportamento da estrutura, procurando uma resposta não linear da mesma, visando garantir que: - A rotura não ocorrerá nos elementos de fundação; - Nos pilares a dissipação de energia se faz através de rótulas plásticas, evitando-se roturas associadas a esforços transversos. A aplicação destas regras neste Projecto demonstrou haver um agravamento substancial na definição dos esforços a que devem resistir alguns dos componentes da estrutura, designadamente os pilares e as fundações, originando soluções de secções de betão e armaduras bem mais exigentes do que aqueles que resultariam da simples verificação de segurança, pela comparação entre esforços actuante e esforços resistentes “secção a secção”, imposta pela actual regulamentação nacional.
Resumo:
In the last years there has been a huge growth and consolidation of the Data Mining field. Some efforts are being done that seek the establishment of standards in the area. Included on these efforts there can be enumerated SEMMA and CRISP-DM. Both grow as industrial standards and define a set of sequential steps that pretends to guide the implementation of data mining applications. The question of the existence of substantial differences between them and the traditional KDD process arose. In this paper, is pretended to establish a parallel between these and the KDD process as well as an understanding of the similarities between them.
Resumo:
In the last years there has been a huge growth and consolidation of the Data Mining field. Some efforts are being done that seek the establishment of standards in the area. Included on these efforts there can be enumerated SEMMA and CRISP-DM. Both grow as industrial standards and define a set of sequential steps that pretends to guide the implementation of data mining applications. The question of the existence of substantial differences between them and the traditional KDD process arose. In this paper, is pretended to establish a parallel between these and the KDD process as well as an understanding of the similarities between them.
Resumo:
Flavour effects due to lepton interactions in the early Universe may have played an important role in the generation of the cosmological baryon asymmetry through leptogenesis. If the only source of high-energy CP violation comes from the left-handed leptonic sector, then it is possible to establish a bridge between flavoured leptogenesis and low-energy leptonic CP violation. We explore this connection taking into account our present knowledge about low-energy neutrino parameters and the matter-antimatter asymmetry observed in the Universe. In this framework, we find that leptogenesis favours a hierarchical light neutrino mass spectrum, while for quasi-degenerate and inverted hierarchical neutrino masses there is a very narrow allowed window. The absolute neutrino mass scale turns out to be m less than or similar to 0.1 eV. (c) 2007 Elsevier B.V. All rights reserved.
Resumo:
International Conference with Peer Review 2012 IEEE International Conference in Geoscience and Remote Sensing Symposium (IGARSS), 22-27 July 2012, Munich, Germany
Resumo:
The marriage of emerging information technologies with control technologies is a major driving force that, in the context of the factory-floor, is creating an enormous eagerness for extending the capabilities of currently available fieldbus networks to cover functionalities not considered up to a recent past. Providing wireless capabilities to such type of communication networks is a big share of that effort. The RFieldbus European project is just one example, where PROFIBUS was provided with suitable extensions for implementing hybrid wired/wireless communication systems. In RFieldbus, interoperability between wired and wireless components is achieved by the use specific intermediate networking systems operating as repeaters, thus creating a single logical ring (SLR) network. The main advantage of the SLR approach is that the effort for protocol extensions is not significant. However, a multiple logical ring (MLR) approach provides traffic and error isolation between different network segments. This concept was introduced in, where an approach for a bridge-based architecture was briefly outlined. This paper will focus on the details of the inter-Domain Protocol (IDP), which is responsible for handling transactions between different network domains (wired or wireless) running the PROFIBUS protocol.
Resumo:
Future industrial control/multimedia applications will increasingly impose or benefit from wireless and mobile communications. Therefore, there is an enormous eagerness for extending currently available industrial communications networks with wireless and mobility capabilities. The RFieldbus European project is just one example, where a PROFIBUS-based hybrid (wired/wireless) architecture was specified and implemented. In the RFieldbus architecture, interoperability between wired and wireless components is achieved by the use specific intermediate networking systems operating at the physical layer level, i.e. operating as repeaters. Instead, in this paper we will focus on a bridge-based approach, which presents several advantages. This concept was introduced in (Ferreira, et al., 2002), where a bridge-based approach was briefly outlined. Then, a specific Inter-Domain Protocol (IDP) was proposed to handle the Inter-Domain transactions in such a bridge-based approach (Ferreira, et al., 2003a). The major contribution of this paper is in extending these previous works by describing the protocol extensions to support inter-cell mobility in such a bridge-based hybrid wired/wireless PROFIBUS networks.
Resumo:
This paper proposes a global multiprocessor scheduling algorithm for the Linux kernel that combines the global EDF scheduler with a priority-aware work-stealing load balancing scheme, enabling parallel real-time tasks to be executed on more than one processor at a given time instant. We state that some priority inversion may actually be acceptable, provided it helps reduce contention, communication, synchronisation and coordination between parallel threads, while still guaranteeing the expected system’s predictability. Experimental results demonstrate the low scheduling overhead of the proposed approach comparatively to an existing real-time deadline-oriented scheduling class for the Linux kernel.