937 resultados para offshore wind farms
Resumo:
This paper examines the ability of the doubly fed induction generator (DFIG) to deliver multiple reactive power objectives during variable wind conditions. The reactive power requirement is decomposed based on various control objectives (e.g. power factor control, voltage control, loss minimisation, and flicker mitigation) defined around different time frames (i.e. seconds, minutes, and hourly), and the control reference is generated by aggregating the individual reactive power requirement for each control strategy. A novel coordinated controller is implemented for the rotor-side converter and the grid-side converter considering their capability curves and illustrating that it can effectively utilise the aggregated DFIG reactive power capability for system performance enhancement. The performance of the multi-objective strategy is examined for a range of wind and network conditions, and it is shown that for the majority of the scenarios, more than 92% of the main control objective can be achieved while introducing the integrated flicker control scheme with the main reactive power control scheme. Therefore, optimal control coordination across the different control strategies can maximise the availability of ancillary services from DFIG-based wind farms without additional dynamic reactive power devices being installed in power networks.
Resumo:
In July 2010, the Shanghai Donghai Bridge wind farm, the first commercial offshore wind project was connected to the main grid in China. Three months later, four contracts were handed out to build a total of 1GW wind power capacity in the first round of an offshore concession project by the Chinese central government. At that time, there was a worldwide expectation that Chinese offshore wind power capacity would expand rapidly. However, China only achieved a total offshore wind power installed capacity of 389.2 MW by the end of 2012. This paper studies the recent development of offshore wind power in China by dividing the offshore wind power projects into three categories. This paper presents the difficulties for the Chinese government to achieve its 12th Five Year Plan for offshore wind power. Some policy recommendations to overcome the current difficulties are made in the conclusions.
Resumo:
The doubly-fed induction generator (DFIG) now represents the dominant technology in wind turbine design. One consequence of this is limited damping and inertial response during transient grid disturbances. A dasiadecoupledpsila strategy is therefore proposed to operate the DFIG grid-side converter (GSC) as a static synchronous compensator (STATCOM) during a fault, supporting the local voltage, while the DFIG operates as a fixed-speed induction generator (FSIG) providing an inertial response. The modeling aspects of the decoupled control strategy, the selection of protection control settings, the significance of the fault location and operation at sub- and super-synchronous speeds are analyzed in detail. In addition, a case study is developed to validate the proposed strategy under different wind penetrations levels. The simulations show that suitable configuration of the decoupled strategy can be deployed to improve system voltage stability and inertial response for a range of scenarios, especially at high wind penetration. The conclusions are placed in context of the practical limitations of the technology employed and the system conditions.
Resumo:
Wind energy has been identified as key to the European Union’s 2050 low carbon economy. However, as wind is a variable resource and stochastic by nature, it is difficult to plan and schedule the power system under varying wind power generation. This paper investigates the impacts of offshore wind power forecast error on the operation and management of a pool-based electricity market in 2050. The impact of the magnitude and variance of the offshore wind power forecast error on system generation costs, emission costs, dispatch-down of wind, number of start-ups and system marginal price is analysed. The main findings of this research are that the magnitude of the offshore wind power forecast error has the largest impact on system generation costs and dispatch-down of wind, but the variance of the offshore wind power forecast error has the biggest impact on emissions costs and system marginal price. Overall offshore wind power forecast error variance results in a system marginal price increase of 9.6% in 2050.
Resumo:
In the United Kingdom wind power is recognised as the main source of renewable energy to achieve the European Union 2020 renewable energy targets. Currently over 50% of renewable power is generated from onshore wind with a large number of offshore wind projects in development. Recently the government has re-iterated its commitment to offshore wind power and has announced that offshore wind subsidies are to increase from £135/MWh to £140/MWh until 2019. This paper provides a detailed overview of the offshore wind power industry in the United Kingdom in terms of market growth, policy development and offshore wind farm costs. The paper clearly shows that the United Kingdom is the world leader for installed offshore wind power capacity as pro-active policies and procedures have made it the most attractive location to develop offshore wind farm arrays. The key finding is that the United Kingdom has the potential to continue to lead the world in offshore wind power as it has over 48 GW of offshore wind power projects at different stages of operation and development. The growth of offshore wind power in the United Kingdom has seen offshore wind farm costs rise and level off at approximately £3 million/MW, which are higher than onshore wind costs at £1.5–2 million/MW. Considering the recent increase in offshore wind power subsidies and plans for 48 GW of offshore wind power could see more offshore wind power becoming increasingly financially competitive with onshore wind power. Therefore offshore wind power is likely to become a significant source of electricity in the United Kingdom beyond 2020.
Resumo:
This paper investigates the impacts of offshore wind power forecast error on the operation and management of a pool-based electricity market in 2050. The impact from offshore wind power forecast errors of up to 2000 MW on system generation costs, emission costs, dispatch-down of wind, number of start-ups and system marginal price are analysed. The main findings of this research are an increase in system marginal prices of approximately 1% for every percentage point rise in the offshore wind power forecast error regardless of the average forecast error sign. If offshore wind power generates less than forecasted (−13%) generation costs and system marginal prices increases by 10%. However, if offshore wind power generates more than forecasted (4%) the generation costs decrease yet the system marginal prices increase by 3%. The dispatch down of large quantities of wind power highlights the need for flexible interconnector capacity. From a system operator's perspective it is more beneficial when scheduling wind ahead of the trading period to forecast less wind than will be generated.
Resumo:
The future European power system will have a hierarchical structure created by layers of system control from a Supergrid via regional high-voltage transmission through to medium and low-voltage distribution. Each level will have generation sources such as large-scale offshore wind, wave, solar thermal, nuclear directly connected to this Supergrid and high levels of embedded generation, connected to the medium-voltage distribution system. It is expected that the fuel portfolio will be dominated by offshore wind in Northern Europe and PV in Southern Europe. The strategies required to manage the coordination of supply-side variability with demand-side variability will include large scale interconnection, demand side management, load aggregation and storage in the context of the Supergrid combined with the Smart Grid. The design challenge associated with this will not only include control topology, data acquisition, analysis and communications technologies, but also the selection of fuel portfolio at a macro level. This paper quantifies the amount of demand side management, storage and so-called 'back-up generation' needed to support an 80% renewable energy portfolio in Europe by 2050. © 2013 IEEE.
Resumo:
In the coming decade installed offshore wind capacity is expected to expand rapidly. This will be both technically and economically challenging. Precise wind resource assessment is one of the more imminent challenges. It is more difficult to assess wind power offshore than onshore due to the paucity of representative wind speed data. Offshore site-specific data is less accessible and is far more costly to collect. However, offshore wind speed data collected from sources such as wave buoys, remote sensing from satellites, national weather ships, and coastal meteorological stations and met masts on barges and platforms may be extrapolated to assess offshore wind power. This study attempts to determine the usefulness of pre-existing offshore wind speed measurements in resource assessment, and presents the results of wind resource estimation in the Atlantic Ocean and in the Irish Sea using data from two offshore meteorological buoys. © 2012 IEEE.
Resumo:
In the coming decade installed offshore wind capacity is expected to expand rapidly. This will be both technically and economically challenging. Precise wind resource assessment is one of the more imminent challenges. It is more difficult to assess wind power offshore than onshore due to the paucity of representative wind speed data. Offshore site-specific data is less accessible and is far more costly to collect. However, offshore wind speed data collected from sources such as wave buoys, remote sensing from satellites, national weather ships, and coastal meteorological stations and met masts on barges and platforms may be extrapolated to assess offshore wind power. This study attempts to determine the usefulness of pre-existing offshore wind speed measurements in resource assessment, and presents the results of wind resource estimation in the Atlantic Ocean and in the Irish Sea using data from two offshore meteorological buoys
Resumo:
At least 34 % of the United Kingdom’s power must come from renewable energy sources to meet planned European Union targets in 2030. Wind power will provide the majority of this renewable electricity with an estimated 36 GW offshore and 21 GW onshore. The success of the Crown Estate’s leasing rounds 1 and 2 in offshore wind has meant the United Kingdom is now one of the world leaders in offshore wind power development. Leasing round 3 will see offshore wind in the United Kingdom surpass 36 GW of installed capacity. This is a significant increase from the current installed offshore wind capacity of 3.6 GW. This research investigates the power system performance of offshore wind power in the United Kingdom in 2030.
Resumo:
Using the contingent valuation method, this study investigates the preferences of local people for a wind farm that is planned in the Province of Rome. We estimate the reductions in their bimonthly electrical bills over a period of time that respondents are willing to accept as compensation for the installation of the wind farm. Our results suggest that respondents who perceive that the wind farm generates substantial negative impacts on landscape beauty ask higher reductions than others, while respondents who believe that the wind farm produces economic benefits for local communities ask lower reductions than others. Finally, we find that the demand for compensative measures is influenced particularly by socio-economic factors such as age and education.
Resumo:
Esta tese apresenta um estudo sobre otimização económica de parques eólicos, com o objetivo de obter um algoritmo para otimização económica de parques eólicos através do custo da energia produzida. No estudo utilizou-se uma abordagem multidisciplinar. Inicialmente, apresentam-se as principais tecnologias e diferentes arquiteturas utilizadas nos parques eólicos. Bem como esquemas de funcionamento e gestão dos parques. São identificadas variáveis necessárias e apresenta-se um modelo dimensionamento para cálculo dos custos da energia produzida, tendo-se dado ênfase às instalações onshore e ligados a rede elétrica de distribuição. É feita uma análise rigorosa das características das topologias dos aerogeradores disponíveis no mercado, e simula-se o funcionamento de um parque eólico para testar a validade dos modelos desenvolvidos. Também é implementado um algoritmo para a obtenção de uma resposta otimizada para o ciclo de vida económico do parque eólico em estudo. A abordagem proposta envolve algoritmos para otimização do custo de produção com multiplas funções objetivas com base na descrição matemática da produção de eletricidade. Foram desenvolvidos modelos de otimização linear, que estabelece a ligação entre o custo económico e a produção de eletricidade, tendo em conta ainda as emissões de CO2 em instrumentos de política energética para energia eólica. São propostas expressões para o cálculo do custo de energia com variáveis não convencionais, nomeadamente, para a produção variável do parque eólico, fator de funcionamento e coeficiente de eficiência geral do sistema. Para as duas últimas, também é analisado o impacto da distribuição do vento predominante no sistema de conversão de energia eólica. Verifica-se que os resultados obtidos pelos algoritmos propostos são similares às obtidas por demais métodos numéricos já publicados na comunidade científica, e que o algoritmo de otimização económica sofre influência significativa dos valores obtidos dos coeficientes em questão. Finalmente, é demonstrado que o algoritmo proposto (LCOEwso) é útil para o dimensionamento e cálculo dos custos de capital e O&M dos parques eólicos com informação incompleta ou em fase de projeto. Nesse sentido, o contributo desta tese vem ser desenvolver uma ferramenta de apoio à tomada de decisão de um gestor, investidor ou ainda agente público em fomentar a implantação de um parque eólico.
Resumo:
This paper is on offshore wind energy conversion systems installed on the deep water and equipped with back-to-back neutral point clamped full-power converter, permanent magnet synchronous generator with an AC link. The model for the drive train is a five-mass model which incorporates the dynamic of the structure and the tower in order to emulate the effect of the moving surface. A three-level converter and a four-level converter are the two options with a fractional-order control strategy considered to equip the conversion system. Simulation studies are carried out to assess the quality of the energy injected into the electric grid. Finally, conclusions are presented. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
Na sequência da integração da energia eólica em larga escala foram estabelecidos códigos de rede pelos vários operadores de sistema, exigindo que os parques eólicos permaneçam em serviço durante e após a ocorrência de defeitos na rede a montante. Nos parques eólicos equipados com sistemas de velocidade constante este requisito pode ser assegurado pela instalação, no ponto de interligação à rede, de equipamento de compensação dinâmica de potência reactiva, controlado como fonte de tensão, sendo as funções de controlo baseadas em medidas efectuadas no ponto de interligação relativamente às componentes directas da tensão e da corrente. Como a adopção deste tipo de soluções externas é adequada ao funcionamento do sistema em regime equilibrado, este artigo foca a avaliação do desempenho da solução no caso da ocorrência de defeitos assimétricos. Os resultados obtidos através das simulações dinâmicas evidenciam o aparecimento de sobre tensões nas fases não afectadas pelo defeito que poderão colocar o parque eólico fora de serviço.