973 resultados para multi-threaded program


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Global warming mitigation has recently become a priority worldwide. A large body of literature dealing with energy related problems has focused on reducing greenhouse gases emissions at an engineering scale. In contrast, the minimization of climate change at a wider macroeconomic level has so far received much less attention. We investigate here the issue of how to mitigate global warming by performing changes in an economy. To this end, we make use of a systematic tool that combines three methods: linear programming, environmentally extended input output models, and life cycle assessment principles. The problem of identifying key economic sectors that contribute significantly to global warming is posed in mathematical terms as a bi criteria linear program that seeks to optimize simultaneously the total economic output and the total life cycle CO2 emissions. We have applied this approach to the European Union economy, finding that significant reductions in global warming potential can be attained by regulating specific economic sectors. Our tool is intended to aid policymakers in the design of more effective public policies for achieving the environmental and economic targets sought.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the past two decades numerous programs have emerged to treat individuals with developmental disabilities who have sexual offending behaviours. There has, however been very few studies that systematically examine the effectiveness of long term treatment with this population. The present research examines the therapeutic outcomes of a multi-modal behaviour approach with six individuals with intellectual disabilities previously charged with sexual assault. The participants also exhibited severe behavioural challenges that included verbal aggression, physical aggression, destruction and self-injury. These six participants (5 males, 1 female) were admitted to a Long Term Residential Treatment Program (LTRTP), due to the severity of their behaviours and due to their lack of treatment success in other programs. Individualized treatment plans focused on the reduction of maladaptive behaviours and the enhancing of skills such as positive coping strategies, socio-sexual knowledge, life skills, recreation and leisure skills. The treatment program also included psychiatric, psychological, medical, behavioural and educational interventions. The participants remained in the Long Term Residential Treatment Program (LTRTP) program from 181 to 932 days (average of 1.5 years). Pre and post treatment evaluations were conducted using the following tools: frequency of target behaviours, Psychopathology Inventory for Mentally Retarded Adults (PIMRA), Emotional Problems Scale (EPS), Socio-Sexual Knowledge and Attitudes Assessment Tool (SSKAAT-R) and Quality of Life Questionnaire (QOL-Q). Recidivism rates and the need for re-hospitalization were also noted for each participant. By offering high levels of individualized interventions, all six participants showed a 37 % rate of reduction in maladaptive behaviours with zero to low rates of inappropriate sexualbehaviour, there were no psychiatric hospitalizations, and there was no recidivism for 5 of 6 participants. In addition, medication was reduced. Mental health scores on the PIMRA were reduced across all participants by 25 % and scores on the Quality of Life Questionnaire increased for all participants by an average of 72 %. These findings add to and build upon the existing literature on long term treatment benefits for individuals with a intellectual disability who sexually offend. By utilizing an individualized and multimodal treatment approach to reduce severe behavioural challenges, not only can the maladaptive behaviours be reduced, but adaptive behaviours can be increased, mental health concerns can be managed, and overall quality of life can be improved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Up to 40% of North American post-secondary students smoke at least occasionally, and most want to quit. Given students' preferences for free, easy-to-access, self-directed, convenient cessation methods, a motivational, incentive-based cessation contest may be an effective way to assist students to quit. The current study describes 3- and 6-month outcomes experienced by post-secondary student smokers who entered the 'Let's Make A Deal!' contest. Methodology: Contestants from five university campuses who chose to quit completely ('Quit For Good') or reduce their tobacco consumption by 50% ('Keep The Count') were invited to participate in a study of the contest. Three and six months after registration, participants were contacted by phone to assess their smoking and quitting behaviours. Qualitative and quantitative measures were collected, including weekly tobacco consumption, efficacy to resist temptations to smoke, use of quitting aids, and strategies to cope with withdrawal. Quitting was assessed using 7-day point prevalence and continuous abstinence. Results: Seventy-four (64.9%) of the 114 participants recruited for the study completed the follow-ups. Over 31 % of participants who entered Quit For Good and 23.5% of participants who entered Keep The Count were identified as quitters at the 6-month follow-up. Among the quitters, 45.5% experienced sustained abstinence from smoking for the 6-month duration of the study. Keep The Count contestants reduced their tobacco consumption by 57.2% at 3-month follow-up and sustained some of this reduction through to the 6-month follow-up. Qualitative data provides insights into how quitters coped with withdrawal and what hampered continuing smokers' efforts to quit. Significance: A motivational, incentive-based contest for post-secondary students can facilitate both smoking cessation and harm reduction. The contest environment, incentives, resources, and "buddies" provide positive structural and social supports to help smokers overcome potential barriers to quitting, successfully stop smoking, and manage potential triggers to relapse. The contest cessation rates are higher than the typical 5-7% associated with unassisted quitting.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Municipalities that engage in recreation planning have the potential to use their resources more effectively. However, successful planning means getting the plan off the shelf and implemented. This study investigated the factors that influenced municipal recreation plan implementation in three municipalities. Interviews were conducted with eleven key informants (recreation directors, planning consultants, a city councillor, and members of plan steering committees). The findings of this study suggested that because the implementation of recreation plans occurs in a highly political environment, recreation professionals will need effective strategies to get their plans implemented and that implementation can be facilitated by developing or expanding strategies that: (l) build the power of the recreation department within the municipal government structure; (2) build support for recreation within the local community; and (3) build the political and organizational capacity in the recreation department.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of my research was to develop and refine pedagogic approaches, and establish fitness baselines to adapt fitness and conditioning programs for Moderate-functioning ASD individuals. I conducted a seven-week study with two teens and two trainers. The trainers implemented individualized fitness and conditioning programs that I developed. I conducted pre and post fitness baselines for each teen, a pre and post study interview with the trainers, and recorded semi-structured observations during each session. I used multi-level, within-case and across case analyses, working inductively and deductively. My findings indicated that fundamental movement concepts can be used to establish fitness baselines and develop individualized fitness programs. I tracked and evaluated progressions and improvements using conventional measurements applied to unconventional movements. This process contributed to understanding and making relevant modifications to activities as effective pedagogic strategies for my trainers. Further research should investigate fitness and conditioning programs with lower functioning ASD individuals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study examined the operational planning, implementation and execution issues of major sport events, as well as the mitigation and management strategies used to address these issues, with the aim of determining best practices in sport event operational planning. The three Research Questions were: 1) What can previous major sport events provide to guide the operational management of future events? 2) What are the operational issues that arise in the planning and execution of a major sport event, how are they mitigated and what are the strategies used to deal with these issues? 3) What are the best practices for sport event operational planning and how can these practices aid future events? Data collection involved a modified Delphi technique that consisted of one round of in-depth interviews followed by two rounds of questionnaires. Both data collection and analysis were guided by an adaptation of the work of Parent, Rouillard & Leopkey (2011) with a focus on previously established issue and strategy categories. The results provided a list of Top 26 Prominent Issues and Top 17 Prominent Strategies with additional issue-strategy links that can be used to aid event managers producing future major sport events. The following issue categories emerged as having had the highest impact on previous major sport events that participants had managed: timing, funding and knowledge management. In addition, participants used strategies from the following categories most frequently: other, formalized agreements and communication.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Les systèmes logiciels sont devenus de plus en plus répondus et importants dans notre société. Ainsi, il y a un besoin constant de logiciels de haute qualité. Pour améliorer la qualité de logiciels, l’une des techniques les plus utilisées est le refactoring qui sert à améliorer la structure d'un programme tout en préservant son comportement externe. Le refactoring promet, s'il est appliqué convenablement, à améliorer la compréhensibilité, la maintenabilité et l'extensibilité du logiciel tout en améliorant la productivité des programmeurs. En général, le refactoring pourra s’appliquer au niveau de spécification, conception ou code. Cette thèse porte sur l'automatisation de processus de recommandation de refactoring, au niveau code, s’appliquant en deux étapes principales: 1) la détection des fragments de code qui devraient être améliorés (e.g., les défauts de conception), et 2) l'identification des solutions de refactoring à appliquer. Pour la première étape, nous traduisons des régularités qui peuvent être trouvés dans des exemples de défauts de conception. Nous utilisons un algorithme génétique pour générer automatiquement des règles de détection à partir des exemples de défauts. Pour la deuxième étape, nous introduisons une approche se basant sur une recherche heuristique. Le processus consiste à trouver la séquence optimale d'opérations de refactoring permettant d'améliorer la qualité du logiciel en minimisant le nombre de défauts tout en priorisant les instances les plus critiques. De plus, nous explorons d'autres objectifs à optimiser: le nombre de changements requis pour appliquer la solution de refactoring, la préservation de la sémantique, et la consistance avec l’historique de changements. Ainsi, réduire le nombre de changements permets de garder autant que possible avec la conception initiale. La préservation de la sémantique assure que le programme restructuré est sémantiquement cohérent. De plus, nous utilisons l'historique de changement pour suggérer de nouveaux refactorings dans des contextes similaires. En outre, nous introduisons une approche multi-objective pour améliorer les attributs de qualité du logiciel (la flexibilité, la maintenabilité, etc.), fixer les « mauvaises » pratiques de conception (défauts de conception), tout en introduisant les « bonnes » pratiques de conception (patrons de conception).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

S.P.I.R.E., at use at Central Institute for the Deaf, is a comprehensive, multi-sensory systematic reading and language program that targets at risk and struggling students. The purpose of this project was to write additional stories and sentences for students who are hearing impaired through reader 2 that may be used in conjunction with the exiting stories and supplements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An eddy current testing system consists of a multi-sensor probe, computer and a special expansion card and software for data collection and analysis. The probe incorporates an excitation coil, and sensor coils; at least one sensor coil is a lateral current-normal coil and at least one is a current perturbation coil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent empirical studies have shown that multi-angle spectral data can be useful for predicting canopy height, but the physical reason for this correlation was not understood. We follow the concept of canopy spectral invariants, specifically escape probability, to gain insight into the observed correlation. Airborne Multi-Angle Imaging Spectrometer (AirMISR) and airborne Laser Vegetation Imaging Sensor (LVIS) data acquired during a NASA Terrestrial Ecology Program aircraft campaign underlie our analysis. Two multivariate linear regression models were developed to estimate LVIS height measures from 28 AirMISR multi-angle spectral reflectances and from the spectrally invariant escape probability at 7 AirMISR view angles. Both models achieved nearly the same accuracy, suggesting that canopy spectral invariant theory can explain the observed correlation. We hypothesize that the escape probability is sensitive to the aspect ratio (crown diameter to crown height). The multi-angle spectral data alone therefore may not provide enough information to retrieve canopy height globally.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Foundation construction process has been an important key point in a successful construction engineering. The frequency of using diaphragm wall construction method among many deep excavation construction methods in Taiwan is the highest in the world. The traditional view of managing diaphragm wall unit in the sequencing of construction activities is to establish each phase of the sequencing of construction activities by heuristics. However, it conflicts final phase of engineering construction with unit construction and effects planning construction time. In order to avoid this kind of situation, we use management of science in the study of diaphragm wall unit construction to formulate multi-objective combinational optimization problem. Because the characteristic (belong to NP-Complete problem) of problem mathematic model is multi-objective and combining explosive, it is advised that using the 2-type Self-Learning Neural Network (SLNN) to solve the N=12, 24, 36 of diaphragm wall unit in the sequencing of construction activities program problem. In order to compare the liability of the results, this study will use random researching method in comparison with the SLNN. It is found that the testing result of SLNN is superior to random researching method in whether solution-quality or Solving-efficiency.