997 resultados para meta-scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis consists of three related studies: an ERP Major Issues Study; an Historical Study of the Queensland Government Financial Management System; and a Meta-Study that integrates these and other related studies conducted under the umbrella of the Cooperative ERP Lifecycle Knowledge Management research program. This research provides a comprehensive view of ERP lifecycle issues encountered in SAP R/3 projects across the Queensland Government. This study follows a preliminary ERP issues study (Chang, 2002) conducted in five Queensland Government agencies. The Major Issues Study aims to achieve the following: (1) identify / explicate major issues in relation to the ES life-cycle in the public sector; (2) rank the importance of these issues; and, (3) highlight areas of consensus and dissent among stakeholder groups. To provide a rich context for this study, this thesis includes an historical recount of the Queensland Government Financial Management System (QGFMS). This recount tells of its inception as a centralised system; the selection of SAP and subsequent decentralisation; and, its eventual recentralisation under the Shared Services Initiative and CorpTech. This historical recount gives an insight into the conditions that affected the selection and ongoing management and support of QGFMS. This research forms part of a program entitled Cooperative ERP Lifecycle Knowledge Management. This thesis provides a concluding report for this research program by summarising related studies conducted in the Queensland Government SAP context: Chan (2003); Vayo et al (2002); Ng (2003); Timbrell et al (2001); Timbrell et al (2002); Chang (2002); Putra (1998); and, Niehus et al (1998). A study of Oracle in the United Arab Emirates by Dhaheri (2002) is also included. The thesis then integrates the findings from these studies in an overarching Meta-Study. The Meta-Study discusses key themes across all of these studies, creating an holistic report for the research program. Themes discussed in the meta-study include common issues found across the related studies; knowledge dynamics of the ERP lifecycle; ERP maintenance and support; and, the relationship between the key players in the ERP lifecycle.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A schedule coordination problem involving two train services provided by different operators is modeled as an optimization of revenue intake. The coordination is achieved through the adjustment of commencement times of the train services by negotiation. The problem is subject to constraints regarding to passenger demands and idle costs of rolling-stocks from both operators. This paper models the operators as software agents having the flexibility to incorporate one of the two (and potentially more) proposed negotiation strategies. Empirical results show that agents employing different combination of strategies have significant impact on the quality of solution and negotiation time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the recent regulatory reforms in a number of countries, railways resources are no longer managed by a single party but are distributed among different stakeholders. To facilitate the operation of train services, a train service provider (SP) has to negotiate with the infrastructure provider (IP) for a train schedule and the associated track access charge. This paper models the SP and IP as software agents and the negotiation as a prioritized fuzzy constraint satisfaction (PFCS) problem. Computer simulations have been conducted to demonstrate the effects on the train schedule when the SP has different optimization criteria. The results show that by assigning different priorities on the fuzzy constraints, agents can represent SPs with different operational objectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Efforts to prevent the development of overweight and obesity have increasingly focused early in the life course as we recognise that both metabolic and behavioural patterns are often established within the first few years of life. Randomised controlled trials (RCTs) of interventions are even more powerful when, with forethought, they are synthesised into an individual patient data (IPD) prospective meta-analysis (PMA). An IPD PMA is a unique research design where several trials are identified for inclusion in an analysis before any of the individual trial results become known and the data are provided for each randomised patient. This methodology minimises the publication and selection bias often associated with a retrospective meta-analysis by allowing hypotheses, analysis methods and selection criteria to be specified a priori. Methods/Design: The Early Prevention of Obesity in CHildren (EPOCH) Collaboration was formed in 2009. The main objective of the EPOCH Collaboration is to determine if early intervention for childhood obesity impacts on body mass index (BMI) z scores at age 18-24 months. Additional research questions will focus on whether early intervention has an impact on children’s dietary quality, TV viewing time, duration of breastfeeding and parenting styles. This protocol includes the hypotheses, inclusion criteria and outcome measures to be used in the IPD PMA. The sample size of the combined dataset at final outcome assessment (approximately 1800 infants) will allow greater precision when exploring differences in the effect of early intervention with respect to pre-specified participant- and intervention-level characteristics. Discussion: Finalisation of the data collection procedures and analysis plans will be complete by the end of 2010. Data collection and analysis will occur during 2011-2012 and results should be available by 2013. Trial registration number: ACTRN12610000789066

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aims--Telemonitoring (TM) and structured telephone support (STS) have the potential to deliver specialised management to more patients with chronic heart failure (CHF), but their efficacy is still to be proven. Objectives To review randomised controlled trials (RCTs) of TM or STS on all- cause mortality and all-cause and CHF-related hospitalisations in patients with CHF, as a non-invasive remote model of specialised disease-management intervention.--Methods and Results--Data sources:We searched 15 electronic databases and hand-searched bibliographies of relevant studies, systematic reviews, and meeting abstracts. Two reviewers independently extracted all data. Study eligibility and participants: We included any randomised controlled trials (RCT) comparing TM or STS to usual care of patients with CHF. Studies that included intensified management with additional home or clinic visits were excluded. Synthesis: Primary outcomes (mortality and hospitalisations) were analysed; secondary outcomes (cost, length of stay, quality of life) were tabulated.--Results: Thirty RCTs of STS and TM were identified (25 peer-reviewed publications (n=8,323) and five abstracts (n=1,482)). Of the 25 peer-reviewed studies, 11 evaluated TM (2,710 participants), 16 evaluated STS (5,613 participants) and two tested both interventions. TM reduced all-cause mortality (risk ratio (RR 0•66 [95% CI 0•54-0•81], p<0•0001) and STS showed similar trends (RR 0•88 [95% CI 0•76-1•01], p=0•08). Both TM (RR 0•79 [95% CI 0•67-0•94], p=0•008) and STS (RR 0•77 [95% CI 0•68-0•87], p<0•0001) reduced CHF-related hospitalisations. Both interventions improved quality of life, reduced costs, and were acceptable to patients. Improvements in prescribing, patient-knowledge and self-care, and functional class were observed.--Conclusion: TM and STS both appear effective interventions to improve outcomes in patients with CHF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In cloud computing resource allocation and scheduling of multiple composite web services is an important challenge. This is especially so in a hybrid cloud where there may be some free resources available from private clouds but some fee-paying resources from public clouds. Meeting this challenge involves two classical computational problems. One is assigning resources to each of the tasks in the composite web service. The other is scheduling the allocated resources when each resource may be used by more than one task and may be needed at different points of time. In addition, we must consider Quality-of-Service issues, such as execution time and running costs. Existing approaches to resource allocation and scheduling in public clouds and grid computing are not applicable to this new problem. This paper presents a random-key genetic algorithm that solves new resource allocation and scheduling problem. Experimental results demonstrate the effectiveness and scalability of the algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Real-world business processes rely on the availability of scarce, shared resources, both human and non-human. Current workflow management systems support allocation of individual human resources to tasks but lack support for the full range of resource types used in practice, and the inevitable constraints on their availability and applicability. Based on past experience with resource-intensive workflow applications, we derive generic requirements for a workflow system which can use its knowledge of resource capabilities and availability to help create feasible task schedules. We then define the necessary architecture for implementing such a system and demonstrate its practicality through a proof-of-concept implementation. This work is presented in the context of a real-life surgical care process observed in a number of German hospitals.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The elastic task model, a significant development in scheduling of real-time control tasks, provides a mechanism for flexible workload management in uncertain environments. It tells how to adjust the control periods to fulfill the workload constraints. However, it is not directly linked to the quality-of-control (QoC) management, the ultimate goal of a control system. As a result, it does not tell how to make the best use of the system resources to maximize the QoC improvement. To fill in this gap, a new feedback scheduling framework, which we refer to as QoC elastic scheduling, is developed in this paper for real-time process control systems. It addresses the QoC directly through embedding both the QoC management and workload adaptation into a constrained optimization problem. The resulting solution for period adjustment is in a closed-form expressed in QoC measurements, enabling closed-loop feedback of the QoC to the task scheduler. Whenever the QoC elastic scheduler is activated, it improves the QoC the most while still meeting the system constraints. Examples are given to demonstrate the effectiveness of the QoC elastic scheduling.