967 resultados para management units


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Innovation is part and parcel of any service in today's environment, so as to remain competitive. Quality improvement in healthcare services is a complex, multi-dimensional task. This study proposes innovation management in healthcare services using a logical framework. A problem tree and an objective tree are developed to identify and mitigate issues and concerns. A logical framework is formulated to develop a plan for implementation and monitoring strategies, potentially creating an environment for continuous quality improvement in a specific unit. We recommend logical framework as a valuable model for innovation management in healthcare services. Copyright © 2006 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: To determine the cost effectiveness of a magnetic resonance imaging scan (MRI) within 5 days of injury compared with the usual management of occult scaphoid fracture. Methods: All patients with suspected scaphoid fractures in five hospitals were invited to participate in a randomised controlled trial of usual treatment with or without an MRI scan. Healthcare costs were compared, and a cost effectiveness analysis of the use of MRI in this scenario was performed. Results: Twenty eight of the 37 patients identified were randomised: 17 in the control group, 11 in the MRI group. The groups were similar at baseline and follow up in terms of number of scaphoid fractures, other injuries, pain, and function. Of the patients without fracture, the MRI group had significantly fewer days immobilised: a median of 3.0 (interquartile range 3.0-3.0) v 10.0 (7-12) in the control group (p = 0.006). The MRI group used fewer healthcare units (median 3.0, interquartile range 2.0-4.25) than the control group (5.0, 3.0-6.5) (p = 0.03 for the difference). However, the median cost of health care in the MRI group ($594.35 AUD, $551.35-667.23) was slightly higher than in the control group ($428.15, $124.40-702.65) (p = 0.19 for the difference). The mean incremental cost effectiveness ratio derived from this simulation was that MRI costs $44.37 per day saved from unnecessary immobilisation (95% confidence interval $4.29 to $101.02). An illustrative willingness to pay was calculated using a combination of the trials measure of the subjects' individual productivity losses and the average daily earnings. Conclusions: Use of MRI in the management of occult scaphoid fracture reduces the number of days of unnecessary immobilisation and use of healthcare units. Healthcare costs increased non-significantly in relation to the use of MRI in this setting. However, when productivity losses are considered, MRI may be considered cost effective, depending on the individual case.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a novel mixed-integer nonlinear approach is proposed to solve the short-term hydro scheduling problem in the day-ahead electricity market, considering not only head-dependency, but also start/stop of units, discontinuous operating regions and discharge ramping constraints. Results from a case study based on one of the main Portuguese cascaded hydro energy systems are presented, showing that the proposedmixed-integer nonlinear approach is proficient. Conclusions are duly drawn. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The reactive power management is an important task in future power systems. The control of reactive power allows the increase of distributed energy resources penetration as well as the optimal operation of distribution networks. Currently, the control of reactive power is only controlled in large power units and in high and very high voltage substations. In this paper a reactive power control in smart grids paradigm is proposed, considering the management of distributed energy resources and of the distribution network by an aggregator namely Virtual Power Player (VPP).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Natural gas industry has been confronted with big challenges: great growth in demand, investments on new GSUs – gas supply units, and efficient technical system management. The right number of GSUs, their best location on networks and the optimal allocation to loads is a decision problem that can be formulated as a combinatorial programming problem, with the objective of minimizing system expenses. Our emphasis is on the formulation, interpretation and development of a solution algorithm that will analyze the trade-off between infrastructure investment expenditure and operating system costs. The location model was applied to a 12 node natural gas network, and its effectiveness was tested in five different operating scenarios.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Smart grids are envisaged as infrastructures able to accommodate all centralized and distributed energy resources (DER), including intensive use of renewable and distributed generation (DG), storage, demand response (DR), and also electric vehicles (EV), from which plug-in vehicles, i.e. gridable vehicles, are especially relevant. Moreover, smart grids must accommodate a large number of diverse types or players in the context of a competitive business environment. Smart grids should also provide the required means to efficiently manage all these resources what is especially important in order to make the better possible use of renewable based power generation, namely to minimize wind curtailment. An integrated approach, considering all the available energy resources, including demand response and storage, is crucial to attain these goals. This paper proposes a methodology for energy resource management that considers several Virtual Power Players (VPPs) managing a network with high penetration of distributed generation, demand response, storage units and network reconfiguration. The resources are controlled through a flexible SCADA (Supervisory Control And Data Acquisition) system that can be accessed by the evolved entities (VPPs) under contracted use conditions. A case study evidences the advantages of the proposed methodology to support a Virtual Power Player (VPP) managing the energy resources that it can access in an incident situation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy Resources Management can play a very relevant role in future power systems in SmartGrid context, with high penetration of distributed generation and storage systems. This paper deals with the importance of resources management in incident situation. The system to consider a high penetration of distributed generation, demand response, storage units and network reconfiguration. A case study evidences the advantages of using a flexible SCADA to control the energy resources in incident situation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the energy management of a small power system, the scheduling of the generation units is a crucial problem for which adequate methodologies can maximize the performance of the energy supply. This paper proposes an innovative methodology for distributed energy resources management. The optimal operation of distributed generation, demand response and storage resources is formulated as a mixed-integer linear programming model (MILP) and solved by a deterministic optimization technique CPLEX-based implemented in General Algebraic Modeling Systems (GAMS). The paper deals with a vision for the grids of the future, focusing on conceptual and operational aspects of electrical grids characterized by an intensive penetration of DG, in the scope of competitive environments and using artificial intelligence methodologies to attain the envisaged goals. These concepts are implemented in a computational framework which includes both grid and market simulation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tese de Doutoramento em Ciências do Mar, especialidade em Ecologia Marinha.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The knowledge-based society we live in has stressed the importance of human capital and brought talent to the top of most wanted skills, especially to companies who want to succeed in turbulent environments worldwide. In fact, streams, sequences of decisions and resource commitments characterize the day-to-day of multinational companies (MNCs). Such decision-making activities encompass major strategic moves like internationalization and new market entries or diversification and acquisitions. In most companies, these strategic decisions are extensively discussed and debated and are generally framed, formulated, and articulated in specialized language often developed by the best minds in the company. Yet the language used in such deliberations, in detailing and enacting the implementation strategy is usually taken for granted and receives little if any explicit attention (Brannen & Doz, 2012) an can still be a “forgotten factor” (Marschan et al. 1997). Literature on language management and international business refers to lack of awareness of business managers of the impact that language can have not only in communication effectiveness but especially in knowledge transfer and knowledge management in business environments. In the context of MNCs, management is, for many different reasons, more complex and demanding than that of a national company, mainly because of diversity factors inherent to internationalization, namely geographical and cultural spaces, i.e, varied mindsets. Moreover, the way of functioning, and managing language, of the MNC depends on its vision, its values and its internationalization model, i.e on in the way the MNE adapts to and controls the new markets, which can vary essentially from a more ethnocentric to a more pluricentric focus. Regardless of the internationalization model followed by the MNC, communication between different business units is essential to achieve unity in diversity and business sustainability. For the business flow and prosperity, inter-subsidiary, intra-company and company-client (customers, suppliers, governments, municipalities, etc..) communication must work in various directions and levels of the organization. If not well managed, this diversity can be a barrier to global coordination and create turbulent environments, even if a good technological support is available (Feely et al., 2002: 4). According to Marchan-Piekkari (1999) the tongue can be both (i) a barrier, (ii) a facilitator and (iii) a source of power. Moreover, the lack of preparation for the barriers of linguistic diversity can lead to various costs, including negotiations’ failure and failure on internationalization.. On the other hand, communication and language fluency is not just a message transfer procedure, but above all a knowledge transfer process, which requires extra-linguistic skills (persuasion, assertiveness …) in order to promote credibility of both parties. For this reason, MNCs need a common code to communicate and trade information inside and outside the company, which will require one or more strategies, in order to overcome possible barriers and organization distortions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives - This study intended to characterize work environment contamination by particles in 2 waste-sorting plants. Material and Methods - Particles were measured by portable direct-reading equipment. Besides mass concentration in different sizes, data related with the number of particles concentration were also obtained. Results - Both sorting units showed the same distribution concerning the 2 exposure metrics: particulate matter 5 (PM5) and particulate matter 10 (PM10) reached the highest levels and 0.3 μm was the fraction with a higher number of particles. Unit B showed higher (p < 0.05) levels for both exposure metrics. For instance, in unit B the PM10 size is 9-fold higher than in unit A. In unit A, particulate matter values obtained in pre-sorting and in the sequential sorting cabinet were higher without ventilation working. Conclusions - Workers from both waste-sorting plants are exposed to particles. Particle counting provided additional information that is of extreme value for analyzing the health effects of particles since higher values of particles concentration were obtained in the smallest fraction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work is discussed the importance of the renewable production forecast in an island environment. A probabilistic forecast based on kernel density estimators is proposed. The aggregation of these forecasts, allows the determination of thermal generation amount needed to schedule and operating a power grid of an island with high penetration of renewable generation. A case study based on electric system of S. Miguel Island is presented. The results show that the forecast techniques are an imperative tool help the grid management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

ABSTRACT OBJECTIVE To estimate the required number of public beds for adults in intensive care units in the state of Rio de Janeiro to meet the existing demand and compare results with recommendations by the Brazilian Ministry of Health. METHODS The study uses a hybrid model combining time series and queuing theory to predict the demand and estimate the number of required beds. Four patient flow scenarios were considered according to bed requests, percentage of abandonments and average length of stay in intensive care unit beds. The results were plotted against Ministry of Health parameters. Data were obtained from the State Regulation Center from 2010 to 2011. RESULTS There were 33,101 medical requests for 268 regulated intensive care unit beds in Rio de Janeiro. With an average length of stay in regulated ICUs of 11.3 days, there would be a need for 595 active beds to ensure system stability and 628 beds to ensure a maximum waiting time of six hours. Deducting current abandonment rates due to clinical improvement (25.8%), these figures fall to 441 and 417. With an average length of stay of 6.5 days, the number of required beds would be 342 and 366, respectively; deducting abandonment rates, 254 and 275. The Brazilian Ministry of Health establishes a parameter of 118 to 353 beds. Although the number of regulated beds is within the recommended range, an increase in beds of 122.0% is required to guarantee system stability and of 134.0% for a maximum waiting time of six hours. CONCLUSIONS Adequate bed estimation must consider reasons for limited timely access and patient flow management in a scenario that associates prioritization of requests with the lowest average length of stay.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada como requisito parcial para obtenção do grau de Mestre em Ciência e Sistemas de Informação Geográfica