995 resultados para lean-production


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In the 1980’s, many United States industrial organizations started developing new production processes to improve quality, reduce cost, and better respond to customer needs and the pressures of global competition. This new paradigm was coined Lean Production (or simply “Lean”) in the book The Machine That Changed The World published in 1990 by researchers from MIT’s International Motor Vehicle Program. In 1993, a consortium of US defense aerospace firms and the USAF Aeronautical Systems Center, together with the AFRL Materials and Manufacturing Directorate, started the Lean Aircraft Initiative (LAI) at MIT. With expansion in 1998 to include government space products, the program was renamed the Lean Aerospace Initiative. LAI’s vision is to “Significantly reduce the cost and cycle time for military aerospace products throughout the entire value chain while continuing to improve product performance.” By late 1998, 23 industry and 13 government organizations with paying memberships, along with MIT and the UAW were participating in the LAI.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Lean construction is considered from a human resource management (HRM) perspective. It is contended that the UK construction sector is characterised by an institutionalised regressive approach to HRM. In the face of rapidly declining recruitment rates for built environment courses, the dominant HRM philosophy of utilitarian instrumentalism does little to attract the intelligent and creative young people that the industry so badly needs. Given this broader context, there is a danger that an uncritical acceptance of lean construction will exacerbate the industry's reputation for unrewarding jobs. Construction academics have strangely ignored the extensive literature that equates lean production to a HRM regime of control, exploitation and surveillance. The emphasis of lean thinking on eliminating waste and improving efficiency makes it easy to absorb into the best practice agenda because it conforms to the existing dominant way of thinking. 'Best practice' is seemingly judged by the extent to which it serves the interests of the industry's technocratic elite. Hence it acts as a conservative force in favour of maintaining the status quo. In this respect, lean construction is the latest manifestation of a long established trend. In common with countless other improvement initiatives, the rhetoric is heavy in the machine metaphor whilst exhorting others to be more efficient. If current trends in lean construction are extrapolated into the future the ultimate destination may be uncomfortably close to Aldous Huxley's apocalyptic vision of a Brave New World. In the face of these trends, the lean construction research community pleads neutrality whilst confining its attention to the rational high ground. The future of lean construction is not yet predetermined. Many choices remain to be made. The challenge for the research community is to improve practice whilst avoiding the dehumanising tendencies of high utilitarianism.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to present the results of a success story involving the extending of lean manufacturing practices between a focal firm and its supplier, both located in Brazil, thereby configuring a case of excellence. Design/methodology/approach – An in-depth case study was conducted involving two companies: Company A, focal, leader in its segment, located in Brazil; and Company B, Company A's supplier, also located in Brazil. Findings – Results indicate there are several mechanisms for extending lean manufacturing practices in the supply chain, such as workshops, training, and integrated teams. These mechanisms are shown and guidelines are also introduced for companies seeking to successfully extend lean manufacturing practices. Originality/value – An original use of define, measure, analyze, improve, control for structuring the extending of lean manufacturing practices to suppliers and, consequently, the importance of the lean six-sigma relationship in this context. Furthermore, the guidelines introduced serve as a benchmark for other companies interested in the topic.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In recent decades, two research themes have been prominent in the academic and organizational setting: lean manufacturing and green management. Since 1996, when Florida (1996) wrote an article focusing on the synergy between these two areas, the debate if “Lean is Green?” enters in the academic field. It is in this context that this research presents the results of a systematic literature on the topic, focusing on the characteristics, positive and negative impacts, lean paradigms, green paradigms and design of supply chains. To perform this procedure it were followed the methodological footsteps of Lage Junior and Godinho Filho (2010). The research occurred in the database Scopus and it was conducted from June, 2012 to July, 2012.The key word used was “green lean” and as search filter it were included only articles and conference Papers. Their main result is a deep analysis of the accumulated knowledge on the subject, where it is revealed that the majority of studies point to the synergy between some components of the lean manufacturing system in relation to environmental management. The research gap found is related to articles that address the entropy of the union of lean and green systems.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Ottimizzazione VARI dell'area assemblaggio in una multinazionale del settore metalmeccanico e definizione del ruolo del lean thinker per la gestione del sistema di lean production.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A lean bevezetése nem korlátozódik a termelés újraértelmezésére, hanem jellemzően a vállalati belső működés (számvitel, emberi erőforrás, beszerzés) és külső kapcsolatok (beszállítók, ellátási lánc) újszervezését is megköveteli. Ezek a kapcsolódási pontok számos, tudományterületek határán fekvő kutatási irányt nyitnak meg. Ebben a tanulmányban a lean termelés és a belső működéshez sorolt emberi erőforrás menedzsment kapcsolatára fókuszálok. Célom, hogy a tevékenységmenedzsment vonatkozó irodalmának áttekintésével bemutassam a lean termelés logikájához illeszkedő emberi erőforrás menedzsmentet, annak jellemző gyakorlatait. = Lean goes beyond manufacturing, implementing its principles usually requires companies to reorganize their companywide internal operations (accounting, human resource, purchasing) and also external relations (supplier, supply chain). This linkages offer several multidisciplinary research directions, this study focuses on the relationship between human resource management and lean production. The main aim of this working paper is to review Operations Management’s literatures on this issue and present the human resource policy and its practices that fit and support lean production.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A szerzők kutatásukban a karcsú menedzsment vállalati szintű versenyképességre gyakorolt hatását tanulmányozták. Ehhez olyan gondolkodási keretet alakítottak ki, amely összekapcsolja a szervezeti képességeket létrehozó gyakorlatokat és rutinokat az ezek eredményeként adódó teljesítménnyel és versenyképességgel. Vállalati esettanulmányokon keresztül mutatják be, hogy a) a karcsú termelés bevezetésének hatására hogyan változnak a szervezet képességei és b) milyen tényezők állnak a karcsú vállalatok javuló versenyképessége mögött. Eredményeik arra mutatnak rá, hogy a karcsú menedzsment elsősorban a vállalatok működőképességére és változóképességére gyakorol pozitív hatást, az üzleti teljesítményre nem feltétlenül. ______ In their research the authors studied the lean management’s effect has on competitiveness with a corporate level. To do this, a framework has been developing, which combines the organizational abilities establishing routines and practices resulting from their performance and competitiveness. Corporate case studies to show that a) the impact of the introduction of lean production, how to change the organization’s capabilities, and b) what factors are improving the competitiveness of the companies behind the slim. Their results point out that the lean management companies primarily in the functionality and variable ability positive effects on business performance is not necessarily.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

La gestione del fine vita dei prodotti è un argomento di interesse attuale per le aziende; sempre più spesso l’imprese non possono più esimersi dall’implementare un efficiente sistema di Reverse Logistics. Per rispondere efficacemente a queste nuove esigenze diventa fondamentale ampliare i tradizionali sistemi logistici verso tutte quelle attività svolte all’interno della Reverse Logitics. Una gestione efficace ed efficiente dell’intera supply chain è un aspetto di primaria importanza per un’azienda ed incide notevolmente sulla sua competitività; proprio per perseguire questo obiettivo, sempre più aziende promuovono politiche di gestione delle supply chain sia Lean che Green. L’obiettivo di questo lavoro, nato dalle esigenze descritte sopra, è quello di applicare un modello innovativo che consideri sia politiche di gestione Lean, che dualmente politiche Green, alla gestione di una supply chain del settore automotive, comprendente anche le attività di gestione dei veicoli fuori uso (ELV). Si è analizzato per prima cosa i principi base e gli strumenti utilizzati per l’applicazione della Lean Production e del Green supply chain management e in seguito si è analizzato le caratteristiche distintive della Reverse Logistics e in particolare delle reti che trattano i veicoli a fine vita. L’obiettivo finale dello studio è quello di elaborare e implementare, tramite l’utilizzo del software AMPL, un modello di ottimizzazione multi-obiettivo (MOP- Multi Objective Optimization) Lean e Green a una Reverse Supply Chain dei veicoli a fine vita. I risultati ottenuti evidenziano che è possibile raggiungere un ottimo compromesso tra le due logiche. E' stata effettuata anche una valutazione economica dei risultati ottenuti, che ha evidenziato come il trade-off scelto rappresenti anche uno degli scenari con minor costi.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

L’idea di focalizzare la tesi sulla supply chain ed in particolare sulle tecniche lean per la sua ottimizzazione deriva dal fatto che si tratta di un nuovo modo di ragionare, di un approccio moderno perfettamente adattabile al contesto socio-economico attuale, teso ad accrescere la flessibilità e l’efficienza dell’impresa attraverso un ripensamento dell’intero flusso di creazione del valore. Verranno analizzate le caratteristiche generali di questo modello organizzativo, per poi addentrarsi nella sua applicazione ed infine i vantaggi e gli eventuali svantaggi che le organizzazioni devono affrontare per implementare operativamente le tecniche lean. L’analisi effettuata nella tesi è strutturata come segue: La parte iniziale del primo capitolo definisce il concetto generale di supply chain sottolineando il contesto di riferimento in cui oggi operano le attività produttive. Vengono poi riportati l’accezione e il valore della supply chain management e le sue problematiche annesse di gestione e controllo. Nella seconda parte del capitolo vengono analizzati e descritti i modelli letterari esistenti utili per descrivere, impostare e classificare una supply chain. Il secondo capitolo, dopo una breve esposizione storica che descrive le origini della metodologia lean production, è orientato alla raccolta delle definizioni e alle loro differenti visioni tratte dal mondo della letteratura. Segue una parte più analitica, dove vengono analizzati in maniera dettagliata gli obiettivi, gli strumenti ed i principi che la filosofia lean prevede. Nel terzo capitolo viene approfondita la VSM, uno degli strumenti di principale importanza secondo le logiche della lean manufacturing. Vengono analizzati gli step necessari per una corretta implementazione, illustrando prima la simbologia internazionale necessaria per una sua comprensione e realizzazione e poi definiti gli step da applicare non solo per una semplice realizzazione, ma per l’ottenimento di una value stream map in ottica lean.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Con questo elaborato si è analizzata la situazione della Logistica di Produzione allo stato AS IS, dalla quale sono emerse una serie di criticità che provocano inefficienze e sprechi in termini di movimentazioni e risorse. A fronte delle criticità riscontrate, per prima cosa è stata eseguita una mappatura per quanto riguarda la modalità di alimentazione dei vari materiali presenti in azienda. Dopo aver definito una serie di criteri standard da seguire, si è proceduto al cambio dei vari codici nella modalità di alimentazione più appropriata ed alla eventuale ricollocazione dei materiali nell’area di magazzino specifica. In seguito, si è passati alla seconda parte delle attività richieste su direttiva aziendale: la mappatura di tutti i codici con due modalità di alimentazione specifiche (chiamate Kanb e Kit) ed il conseguente dimensionamento dei metri lineari necessari per l’eventuale realizzazione di un’area di magazzino ad hoc per questi materiali. In seguito, si è stabilito per ogni codice quale sia la tipologia di contenitore più adatta ad esso e di conseguenza la migliore collocazione nella nuova area di magazzino che verrà realizzata. Infine, si è realizzata una proposta di Layout del magazzino che comprenda anche la nuova area di dedicata alla tipologia di materiali sopra citati. Tutte queste attività sono state realizzate tenendo sempre conto dei principi e dei concetti della Lean Production in merito alla riduzione degli sprechi, in questo caso inerenti alla movimentazione e gestione dei materiali. L’obiettivo che si vuole raggiungere tramite la nuova area di magazzino è l’aumento dell’efficienza per quel che riguarda l’approvvigionamento delle linee produttive.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Among the important changes in the production processes, it is necessary to guarantee the sustainability of the human enterprises, what makes us to foresee changes in the managerial administration to adapt to a new model, with the insert of the concepts of Clean Production, Cleaner, Lean and Total Productive Maintenance (TPM). The main focus of this work was to elaborate a methodology that made it possible to guarantee the reliability in the waterworks of the sugarcane harvester, identifying and analyzing the manners of flaws, in order to result in the improvement of the environmental and socioeconomic quality in the atmosphere of an industry of sugarcane through the significant decrease of hydraulic oil spill. Through the existent report in ERP (Enterprise Resource Planning), used in a Sugarcane Industry Plant, it was possible to accompany of the operational acting of the sugarcane harvester used during 03 crops, regarding the manners of flaws in the waterworks of the same ones, and, in one of the crops it was elaborated the total control of the waterworks of 5 harvesters. Based on the obtained data and the developed methodology it was possible to develop a software that specifies the electric outlet of decisions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

No âmbito do Ciclo de Estudos conducente ao grau de Mestre em Engenharia Mecânica, Per-fil de Manutenção e Produção, foi desenvolvida esta Dissertação, que consiste no estudo do estado actual de implementação da “Total Productive Maintenance – TPM” na Área de Pren-sas da Volkswagen Autoeuropa, identificando os benefícios colhidos com a referida imple-mentação, e também algumas dificuldades. No final desta Dissertação, são enunciadas as considerações resultantes do presente estudo e são emitidas algumas sugestões, no sentido de que este trabalho se torne uma mais-valia para a Área de Prensas da Volkswagen Autoeuropa, contribuindo positivamente na busca da melhoria contínua, dos zero defeitos e das zero falhas e dos zero desperdícios e, finalmente propor um plano de melhoria, ou seja, uma adaptação do actual modelo funcional face ao modelo teórico.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Para fazer face à forte concorrência que a indústria gráfica começa a sentir, e com o objectivo de aumentar a sua rentabilidade e competitividade, propõe-se, neste estudo, aplicar o sistema de fabrico que revolucionou a indústria automóvel na segunda metade do século XX e que começa, progressivamente, a ser generalizado a outras indústrias. Através da concepção de um modelo de «lean production», ou Produção Magra, será possível avaliar o processo de fabrico de uma empresa gráfica, sugerindo importantes acções a tomar, em diversas áreas, conduzindo-a a um novo método de fabrico baseado no sistema de produção magra. Foi realizado um estudo de caso numa empresa gráfica, tendo sido aplicadas as várias ferramentas típicas da produção magra. A análise de dois momentos do estudo de caso revelou, através da aplicação do modelo e após as sugestões apresentadas, uma evolução da organização para um estado mais próximo do sistema de produção magra. O modelo de avaliação permite repensar a forma de produzir valor numa gráfica, que tipicamente labora sob um método de fabrico de produção em massa. Muitas alterações tecnológicas ocorreram nos últimos anos nesta indústria e o método de fabrico ainda se mantém. É agora possível produzir de forma mais optimizada, concentrando todos os esforços na eliminação dos desperdícios.