940 resultados para historic monuments


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis interrogates the construction of fairness to the accused in historic child sexual abuse trials in Ireland. The protection of fairness is a requirement of any trial that claims to adhere to the rule of law. Historic child sexual abuse trials, in which the charges relate to events that are alleged to have taken place decades previously, present serious challenges to the ability of the trial process to safeguard fairness. They are a litmus test of the courts’ commitment to fairness. The thesis finds that in historic abuse trials fairness to the accused has been significantly eroded and that therefore the Irish Courts have failed to respect the core of the rule of law in these most serious of prosecutions. The thesis scrutinises two bodies of case law, both of which deal with the issue of whether evidence should reach the jury. First, it examines the decisions on applications brought by defendants seeking to prohibit their trial. The courts hearing prohibition applications face a dilemma: how to ensure the defendant is not put at risk of an unfair trial, while at the same time recognising that delay in reporting is a defining feature of these cases. The thesis traces the development of the prohibition case law and tracks the shifting interpretations given to fairness by the courts. Second, the thesis examines what fairness means in the superior courts’ decisions regarding the admissibility of the following kinds of evidence, each of which presents particular challenges to the ability of the trial to safeguard fairness: evidence of multiple complainants; evidence of recovered memories and evidence of complainants’ therapeutic records. The thesis finds that in both bodies of case law the Irish courts have hollowed out the meaning of fairness. It makes proposals on how fairness might be placed at the heart of courts’ decisions on admissibility in historic abuse trials. The thesis concludes that the erosion of fairness in historic abuse trials is indicative of a move away from the liberal model of criminal justice. It cautions that unless fairness is prioritised in historic child sexual abuse trials the legitimacy of these trials and that of all Irish criminal trials will be contestable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Intensive archaeological investigation was undertaken on an urban backlot in Annapolis, Maryland. Fieldwork was conducted on behalf of Historic Annapolis Foundation for the property's owners, King and Cornwall, Inc. Supplemental documentary research, an evaluation of existing conditions on the property, and below-ground excavation of a 35 X 70 ft. urban backlot were conducted. While the project was not a Section 106 compliance effort, the field methods and rationale for the site's investigation are comparable to those of standard Phase II site evaluations. Historical documentation attested to the fact that the 22 West Street Backlot, located along the western most edge of the Historic District of Annapolis, Maryland, had seen development and occupation since the first quarter of the eighteenth century. A substantial brick structure was known to have occupied the property in a series of altered forms for much of that period. This structure served a variety of purposes over time: a private residence in the eighteenth century, a boarding house in the nineteenth century (known as the National Hotel), a duplex in the early twentieth century, half of which remained in use until the structure was entirely razed in the 1970s after destruction by fire. Recovery and analysis of site formation processes (i.e., both cultural and natural transformations of the buried remains) indicated that sections of the site were disturbed to a depth of six feet. In contrast to what initially seemed a poor prognosis for site integrity, other areas of the backlot revealed numerous intact historical features and deposits. Structural remains from the dwelling and its associated outbuildings, additions, and attendant trash deposits were recovered. What was initiated as a program of limited testing evolved into a larger-scale undertaking that made use of largely hand-excavated units in conjunction with machine-assisted stripping of areas demonstrated to contain from four to six-foot deep sterile layers of fill. The current investigations provided a window into a portion of the city and period in its history not documented archaeologically. Moreover, this project provided valuable insight into the archaeology of the homelot within a lightly industrialized, urban context. Evidence was recovered of shifts in the layout and arrangement of the houselot as well as changing relations between individuals and the workplace--all within an urban context--an issue defined elsewhere in the archaeological literature as a significant one. No further investigations are recommended for the site, however, further analysis and interpretation of materials recovered are ongoing. In the event that the site were to undergo development, monitoring of any construction activity is recommended.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper details the computational methodology for analysis of the structural behaviour of historic composite structures. The modelling approach is based on finite element analysis and has been developed to aid the efficient and inexpensive computational mechanics of complex composite structures. The discussion is primarily focussed on the modelling methodology and analysis of structural designs that comprise of structural beam components acting as stiffeners to a wider shell part of the structure. A computational strategy for analysis of this type of composite structures that exploits their representation through smeared shell models is detailed in the paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The historic pattern of public sector pay movements in the UK has been counter-cyclical with private sector pay growth. Periods of relative decline in public sector pay against private sector movements have been followed by periods of ‘catch-up’ as Government controls are eased to remedy skill shortages or deal with industrial unrest among public servants. Public sector ‘catch up’ increases have therefore come at awkward times for Government, often coinciding with economic downturn in the private sector (Trinder 1994, White 1996, Bach 2002). Several such epochs of public sector pay policy can be identified since the 1970s. The question is whether the current limits on public sector pay being imposed by the UK Government fit this historic pattern or whether the pattern has been broken and, if so, how and why? This paper takes a historical approach in considering the context to public sector pay determination in the UK. In particular the paper seeks to review the period since Labour came into office (White and Hatchett 2003) and the various pay ‘modernisation’ exercises that have been in process over the last decade (White 2004). The paper draws on national statistics on public sector employment and pay levels to chart changes in public sector pay policy and draws on secondary literature to consider both Government policy intentions and the impact of these policies for public servants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The most appropriate way to measure the social benefits of conserving built cultural heritage sites is to ask the beneficiaries of conservation interventions how much they would be willing to pay for them. We use contingent valuation - a survey-based approach that elicits willingness to pay (WTP) directly from individuals - to estimate the benefits of a nationwide conservation of built cultural heritage sites in Armenia. The survey was administered to Armenian nationals living in Armenia, and obtained extensive information about the respondents' perceptions of the current state of conservation of monuments in Armenia, described the current situation, presented a hypothetical conservation program, elicited WTP for it, and queried individuals about what they thought would happen to monument sites in the absence of the government conservation program. We posit that respondents combined the information about the fate of monuments provided by the questionnaire with their prior beliefs, and that WTP for the good, or program, is likely to be affected by these updated beliefs. We propose a Bayesian updating model of prior beliefs, and empirically implement it with the data from our survey. We found that uncertainty about what would happen to monuments in the absence of the program results in lower WTP amounts. © 2008 Pion Ltd and its Licensors.

Relevância:

20.00% 20.00%

Publicador: