868 resultados para construction projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to investigate the relationship between the facets of cultural intelligence (CQ) (cognitive, meta-cognitive, motivational and behavioural) and the dimensions of cross-cultural adjustment (interaction, general and work adjustment).

Design/methodology/approach: Interviews and questionnaire survey were carried out with British expatriates from the architectural, engineering and construction sector. A total of 191 respondents, with experience from 29 different countries, actively participated in this research. Structural equation model was subsequently developed to investigate the relationship between elements of CQ and cross-cultural adjustment.

Findings: Results of structural equation modelling revealed that collectively all the four aspects of CQ have significant influence on general, interaction and work adjustment, particularly motivational and cognitive CQ. Cognitive CQ which empowers the expatriates with in-depth knowledge about different cultures was a significant predictor of interaction and work adjustment, whereas, motivational CQ is a significant predictor for general and work adjustment. However, no support was gathered for meta-cognitive and behavioural aspects of CQ.

Practical implications: Globally, construction companies and projects are entering an era of increased internationalisation which has prompted the migration/promotion of British construction professionals to different parts of the world for their specialised capabilities and skills. Thus, it is of utmost importance that these professionals adjust to their new world of varied culture and still be productive in their work.

Originality/value: An understanding of these essential factors can actually help British construction organisations to select and mentor individuals and to provide necessary training for successful international assignments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.