977 resultados para building site logistics


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Salvage logging is a common practice carried out in burned forests worldwide, and intended to mitigate the economic losses caused by wildfires. Logging implies an additional disturbance occurring shortly after fire, although its ecological effects can be somewhat mitigated by leaving wood debris on site. The composition of the bird community and its capacity to provide ecosystem services such as seed dispersal of fleshy-fruited plants have been shown to be affected by postfire logging. We assessed the effects of the habitat structure resulting from different postfire management practices on the bird community, in three burned pine forests in Catalonia (western Mediterranean). For this purpose, we focused on the group of species that is responsible for seed dispersal, a process which takes place primarily during the winter in the Mediterranean basin. In addition, we assessed microhabitat selection by seed disperser birds in such environments in relation to management practices. Our results showed a significant, positive relationship between the density of wood debris piles and the abundance of seed disperser birds. Furthermore, such piles were the preferred microhabitat of these species. This reveals an important effect of forest management on seed disperser birds, which is likely to affect the dynamics of bird-dependent seed dispersal. Thus, building wood debris piles can be a useful practice for the conservation of both the species and their ecosystem services, while also being compatible with timber harvesting

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing a construction project supply chain effectively and efficiently is extremely difficult due to involvement of numerous sectors that are supported by ineffective communication system. An efficient construction supply chain system ensures the delivery of materials and other services to construction site while minimising costs and rewarding all sectors based on value added to the supply chain. The advancement of information, communication and wireless technologies is driving construction companies to deploy supply chain management strategies to seek better outputs. As part of the emerging wireless technologies, contextaware computing capability represents the next generation of ICT to the construction services. Conceptually, context-awareness could be integrated with Web Services in order to ensure the delivery of pertinent information to construction site and enhance construction supply chain collaboration. An initial study has indicated that this integrated system has the potential of serving and improving the construction services delivery through access to context-specific data, information and services on as-needed basis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reducing energy use in tenanted commercial property requires a greater understanding of ‘buildings as communities’. Tenanted commercial properties represent: (1) the divergent communities that share specific buildings; and (2) the organizational communities represented by multi-site landlord and tenant companies. In any particular tenanted space the opportunity for environmental change is mediated (hindered or enabled) through the lease. This discussion draws on theoretical and practical understandings of (1) the socio-legal relationships of landlords, tenants and their advisors; (2) the real performance of engineering building services strategies to improve energy efficiency; (3) how organizational cultures affect the ability of the sector to engage with energy-efficiency strategies; and (4) the financial and economic basis of the relationship between owners and occupiers. The transformational complexity stems from: (1) the variety of commercial building stock; (2) the number of stakeholders (solicitors, investors, developers, agents, owners, tenants and facilities managers); (3) the fragmentation within the communities of practice; and (4) leasehold structures and language. An agenda is proposed for truly interdisciplinary research that brings together both the physical and the social sciences of energy use in buildings so that technological solutions are made effective by an understanding of the way that buildings are used and communities behave.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is potential to reduce both operational and embodied greenhouse gas emission from buildings. To date the focus has been on reducing the operational element, although given the urgency of carbon reductions, it may be more beneficial to consider upfront embodied carbon reductions. This paper describes a case study on the whole life carbon cycle of a warehouse building in Swindon, UK. It examines the relationship between embodied carbon (Ec) and operational carbon (Oc), the proportions of Ec from the structural and non-structural elements, carbon benchmarking of the structure, the value of ‘cradle to site’ or ‘cradle to grave’ assessments and the significance of the timing of emissions during the life of the building. The case study indicates that Ec was dominant for the building and that the structure was responsible for more than half of the Ec. Weighting of future emissions appears to be an important factor to consider. The PAS 2050 reduction factors had only a modest effect but weighting to allow for future decarbonisation of the national grid energy supply had a large effect. This suggests that future operational carbon emissions are being overestimated compared to embodied.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

How does the work of designers impact on the safety of operatives at the construction site? Safety research and policy emphasize the importance of designing for safe construction, yet the interface between design and construction is poorly understood: accidents have multiple causes making it hard to establish causal links between design choices and safety outcomes. An in-depth case study of a major station project examines how professionals on the construction site perceive and manage the safety challenges of a building design. Analyses reveal understandings that, on the project studied, design has an impact on safety because of: (1) the timing of design work, where the volume of late design changes increased the difficulty of planning safe procedures, e.g. for working at height, lifting heavy items, refurbishing and demolishing old buildings; and (2) inputs from design stakeholders with insufficient practical knowledge of construction and operation required unplanned work-arounds, e.g. to coordinate different sub-systems, provide maintenance access, and manage loads during construction. These findings suggest that safety suffers where projects are under-designed, and that alongside regulation, there is a need for robust management attention to the contractual structures, incentives, processes and tools that enable clients and designers to understand material practices of construction and operation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Pre-Pottery Neolithic A (PPNA) period in Southwest Asia is essential for our understanding of the transition to sedentary, agricultural communities. Developments in architecture are key to understanding this transition, but many aspects of PPNA architecture remain elusive, such as construction techniques, the selection of building materials, and the functional use of space. The primary aim of the research described within this contribution was to build a PPNA-like structure in order to answer questions about PPNA architecture in general, while specifically addressing issues raised by the excavation of structures at the site of WF16, Southern Jordan. The second aim was to display a ‘PPNA’ building to visitors in Wadi Faynan to enhance their understanding of the period. The experimental construction based on one of the WF16 structures showed that 1) required materials can be acquired locally; 2) a construction technique using mud layers as described in this paper was likely used; 3) flat, or very slightly dome-shaped, roofs are functional and can also be used as a solid working platform; 4) the WF16 small semi-subterranean buildings appear inappropriate for housing a nuclear family unit.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The building industry is often berated for its short comings in meeting up with the demand for the provision of new housing. Addressing the need for new housing stock is a challenge that has led to debates among professional bodies, the construction sector, housing industry and government. The introduction of new manufacturing technologies is often offered as a solution, but the challenges of increasing the amount of off-site construction in residential building are well known and well-rehearsed. The modern flying factory (MFF) is a concept that involves the manufacture of specific components or modules in temporary off- or near- site locations using relatively simple and quick to set up and dismantle technologies and processes. The aim is to produce short batches and hence achieve some of the benefits of off-site manufacture on a much smaller scale than in dedicated factory environments. A case study of a modern flying factory being set up to produce pre-assembled utility cupboards for a large residential development in London is presented, involving participant observation and informal interviews with key actors on the design and operationalising of the process. The case reveals that although there are costs, efficiency and health and safety benefits to using MFF approaches, there are also challenges to overcome over the time required to set up and establish the process for relatively short runs, and in evaluating whether the MFF or traditional site based production is most effective for particular aspects of projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Commonly used in archaeological contexts, micromorphology did not see a parallel advance in the field of experimental archaeology. Drawing from early work conducted in the 1990`s on ethnohistoric sites in the Beagle Channel, we analyze a set of 25 thin sections taken from control features and experimental tests. The control features include animal pathways and environmental contexts (beach samples, forest litter, soils from the proximities of archaeological sites), while the experimental samples comprise anthropic structures, such as hearths, and valves of Mytilus edulis (the most important component of shell middens in the region) heated from 200 degrees C to 800 degrees C. Their micromorphological study constitutes a modern analogue to assist archaeologists studying site formation and ethnographical settings in cold climates, with particular emphasis on shell midden contexts. (c) 2010 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Advanced Building Energy Data Visualization is a way to detect performance problems in commercialbuildings. By placing sensors in a building that collects data from example, air temperature and electricalpower, then makes it possible to calculate the data in Data Visualization software. This softwaregenerates visual diagrams so the building manager or building operator can see if for example thepower consumption is to high.A first step (before sensors are installed in a building) to see how the energy consumption is in abuilding can be to use a Benchmarking Tool. There is a number of Benchmarking Tools that is availablefor free on the Internet. Each tool have a bit different approach, but they all show how much energyconsumption there is in a building compared to other similar buildings.In this study a new web design for the benchmarking tool CalARCH has been developed. CalARCHis developed at the Berkeley Lab in Berkeley, California, USA. CalARCH uses data collected only frombuildings in California, and is only for comparing buildings in California with other similar buildingsin the state.Five different versions of the web site were made. Then a web survey was done to determine whichversion would be the best for CalARCH. The results showed that Version 5 and Version 3 was the best.Then a new version was made, based on these two versions. This study was made at the LawrenceBerkeley Laboratory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The breeding biology of the only Scarlet Ibis Eudocimus ruber colony in southeastern Brazil was studied during the 1996-97 breeding season. The ibises began to visit their colony site by mid-September. Nest building and egg laying took place in early November and was synchronous, making the first nesting pulse. Mean clutch size in this pulse was 2.45 eggs/nest, and 0.67 young/nest reached age three weeks, when they were able to walk about the nest tree and environs. Predation was the main cause of nest failures (74% of all losses), followed by nest collapses (19%). A second nesting pulse, also synchronous, started in late December, when the young from the first nests were already able to wander about the colony and make short flights. Mean clutch size of this pulse was 2.05 eggs/nest and productivity was 0.34 young/nest. Nest collapses during storms accounted for 58% of the losses, and predation for a further 27%. A third pulse, with only a few nests, started when the second pulse young were in their third week, but no nest was successful. The incubation time was 21-24 days, and the young were able to fly well when 40 days old, deserting the colony by age 75 days. Nesting early in the breeding season yielded greater success. Nests were built close to each other (a sphere with a 1.8 m radius and centered on an average nest would include the four nearest neighbors) and there was always more than one nest per tree. Most nests were built on the upper third of the nest-tree and had some cover from overhanging branches. There was a trend for the ibises building their nests in even closer proximity during the second pulse, perhaps as a strategy to lessen individual predation risks. Received 30 August 2000, accepted 4 October 2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aims of this research were: - To identify the characteristics, properties and provenance of the building and decorative material found in three Hungarian Roman sites: Nagyharsány, Nemesvámos-Balácapuszta and Aquincum - To provide a database of information on the different sites - To have an overview of main conservation strategies applied in Hungary. Geological studies, macroscopical and microscopical observations, XRD investigations, physical and chemical analyses allowed us to define the characteristics and properties of the different kinds of collected materials. Building stones sampled from Nagyharsány site showed two different kinds of massive limestone belonging to the areas surrounding the villa. Also Building stones sampled from Nemesvámos-Balácapuszta Roman villa proved to be compatible with limestone belonging to local sources. Mural painting fragments show that all samples are units composed of multilayered structures. Mosaic tesserae can be classified as following: -Pale yellow , blackish and pink tesserae are comparable with local limestone; -White tessera, composed of marble, was probably imported from distant regions of the Empire, as the usual practice of Romans. Mortars present different characteristics according to the age, the site and the functions: -Building mortars are generally lime based, white or pale yellow in colour, present a high percentage of aggregates represented by fine sand; -Supporting mortars from both mosaics and mural paintings are reddish or pinkish in colour, due to the presence of high percentage of brick dust and tiles fragments, and present a higher content of MgO. Although the condition of the sites, there is an insignificant content of soluble salts. Database The whole study has allowed us to provide work sheets for each samples, including all characteristics and properties. Furthermore, all sites included in the frame of the research have been described and illustrated on the base of their floor plans, material and construction methodologies. It can be concluded that: 1. In Nagyharsány Archaeological site, it is possible to define a sequence of different construction phases on the base of the study of building material and mortars. The results are comparable with the chronology of the site provided by the archaeologists 2. The material used for construction was of local origin while the more precious ones, used for decorative elements, were probably imported from long distance 3. Construction techniques in Hungary mainly refer to the usual Roman knowledge and practice (Vitruvius); few differences have been found 4. The database will represent an archive for Archaeologists, Historians and Conservators dealing with Roman period in Hungary.