998 resultados para Telecommunication equipment industry


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

With this paper we would like to trigger a discussion on future needs of modeling and simulation techniques and tools for the telecommunication industry. We claim that the telecommunication market has undergone severe changes that affect the need for and type of simulations in industrial research. We suggest some approaches how to address these new challenges. We believe that there is need for intensive research in the area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reconciliation can be divided into stages, each stage representing the performance of a mining operation, such as: long-term estimation, short-term estimation, planning, mining and mineral processing. The gold industry includes another stage which is the budget, when the company informs the financial market of its annual production forecast. The division of reconciliation into stages increases the reliability of the annual budget informed by the mining companies, while also detecting and correcting the critical steps responsible for the overall estimation error by the optimization of sampling protocols and equipment. This paper develops and validates a new reconciliation model for the gold industry, which is based on correct sampling practices and the subdivision of reconciliation into stages, aiming for better grade estimates and more efficient control of the mining industry`s processes, from resource estimation to final production.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Work-related falls continues to be one of the leading causes of fatalities in the Australian construction industry, and the failure to use fall protection equipment, such as fall-arrest harnesses and arresting devices, has been found to be a contributing factor. In an attempt to gain an understanding of the issues surrounding the use of fallarrest harness systems by construction workers a study involving semi-structured interviews of 15 male construction workers was carried out at three construction sites. The majority of interviewees commented that there was discomfort in wearing a fall-arrest harness; that there were a number of problems when anchored via an arresting device; and that using a fall-arrest system reduced productivity. Most of the interviewees considered that they needed safety precautions against falls, and they expressed the view that workers’ attitudes towards safety depended critically upon their supervisors’ attitude towards safety. It was also found that workers were not trained in rescue procedures. Interviewees expressed concern that retrieval of a suspended worker may not be carried out in time to prevent the onset of suspension trauma. A number of issues were identified which require further research, such as, investigation into suspension trauma, harness and arresting device design, training provided to workers, and the provision for rescues.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of the TeleRisk Project on labour relations and professional risks within the context of teleworking in Portugal – supported by IDICT – Institute for Development and Inspection of Working Conditions (Ministry of Labour), is to study the practices and forms of teleworking in the manufacturing sectors in Portugal. The project chose also the software industry as a reference sector, even though it does not intend to exclude from the study any other sector of activity or the so-called “hybrid” forms of work. However, the latter must have some of the characteristics of telework. The project thus takes into account the so-called “traditional” sectors of activity, namely textile and machinery and metal engineering (machinery and equipment), not usually associated to this type of work. However, telework could include, in the so-called “traditional” sectors, other variations that are not found in technologically based sectors. One of the evaluation methods for the dynamics associated to telework consisted in carrying out surveys by means of questionnaires, aimed at employers in the sectors analysed. This paper presents some of the results of those surveys. It is important to mention that, being a preliminary analysis, it means that it does not pretend to have exhausted all the issues in the survey, but has meant that it shows the bigger tendencies, in terms of teleworking practices, of the Portuguese industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Risk assessment is one of the main pillars of the framework directive and other directives in respect of health and safety. It is also the basis of an effective management of safety and health as it is essential to reduce work-related accidents and occupational diseases. To survey the hazards eventually present in the workplaces the usual procedures are i) gathering information about tasks/activities, employees, equipment, legislation and standards; ii) observation of the tasks and; iii) quantification of respective risks through the most adequate risk assessment among the methodologies available. From this preliminary evaluation of a welding plant and, from the different measurable parameters, noise was considered the most critical. This paper focus not only the usual way of risk assessment for noise but also another approach that may allow us to identify the technique with which a weld is being performed.