983 resultados para Team building


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, specifically to support Jisc’s members in the area of Digital Leadership. It is one example of the base model being used in a particular context and is not meant to be definitive.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

(Original loaned to library for scanning)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

(Original loaned to library for scanning)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Building Team-based Working is designed for use by managers and consultants who are introducing team-based working into organizations. The book synthesizes knowledge about how to build team-based organizations, focusing particularly on the psychological and social processes that can facilitate or obstruct successful teamwork. Rather than advise managers on how to build effective teams, as most books in this area tend to do, this book instead focuses on how to build organizations structured around teams. The text is divided into six sections describing the six main stages of developing team-based working in an organization. The chapters follow a common structure. Each one opens with a summary of the aims and activities relevant to that stage and concludes with a selection of appropriate support materials and tools. These materials can also be downloaded from the CD accompanying the text. The advice given is based on evidence gathered by the authors over 20 years of practical management experience, research work in organizations, and consultancy across the public, manufacturing and service sectors.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Enhancing collaboration in building information modelling (BIM) teams has attracted considerable attention. Current research studies have almost entirely focused on the technical aspects of BIM overlooking the significant effects of team configurations and working procedures on collaboration in BIM teams. Against this backdrop, the present study is driven by the objective of enhancing awareness of the challenges that face teams in developing BIM models and propose a number of effective measures modifying team configurations and adjusting working processes to enhance collaboration. To this end, the study draws upon a case-study and ethnographic theory building research approach through which the development of the BIM model was explored and its major challenges with corresponding applied solutions in a high profile infrastructure project backdrop. The study set out to contribute to the field by providing evidence and opening a window for conceptualisation of the problems and modifications for enhancing collaboration in BIM through the lens of team working principles. The discussion presented outlines practical implications and provides insight into how issues of collaboration in BIM could be dealt with armed with a heightened awareness of principles of team working.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This is an initial report of the PolyU SD part of the team to study Pre-fabricated Building Design and Construction Methodology and marks the completion of Phase 1. It follows our first notes prepared for the meeting on 2 February that identified some critical issues including future lifestyles, life expectancy of buildings, sustainability, size, flexibility and planning considerations. It is also an expansion of our presentation in Dongguan on 23 February. It is not a comprehensive survey of existing approaches or possible ways forward, but it has homed in on certain specific issues and does give specific examples to make the suggestions concrete. It is recommended that more comprehensive research be done to establish previous work and experience internationally. It is also recommended that more research be done on lifestyles as a preliminary to developing at least three concepts for evaluation before proceeding to the detailed design of one concept for full prototyping and market testing. The goal at this point is not to define a single direction but to suggest several future trajectories for further consideration. By the same token, this report is not intended as an exhaustive description of the considerable base of knowledge and ideas brought by the PolyU team to this exciting task. Before taking on an issue of this magnitude and importance in the definition of Hong Kong's future, one must carry out a thoughtful analysis of the issues at hand and an informed definition of paradigms, directions, goals and methods whereby our energies can be best used in the next steps. This report is the result of this analysis

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In architecture courses, instilling a wider understanding of the industry specific representations practiced in the Building Industry is normally done under the auspices of Technology and Science subjects. Traditionally, building industry professionals communicated their design intentions using industry specific representations. Originally these mainly two dimensional representations such as plans, sections, elevations, schedules, etc. were produced manually, using a drawing board. Currently, this manual process has been digitised in the form of Computer Aided Design and Drafting (CADD) or ubiquitously simply CAD. While CAD has significant productivity and accuracy advantages over the earlier manual method, it still only produces industry specific representations of the design intent. Essentially, CAD is a digital version of the drawing board. The tool used for the production of these representations in industry is still mainly CAD. This is also the approach taken in most traditional university courses and mirrors the reality of the situation in the building industry. A successor to CAD, in the form of Building Information Modelling (BIM), is presently evolving in the Construction Industry. CAD is mostly a technical tool that conforms to existing industry practices. BIM on the other hand is revolutionary both as a technical tool and as an industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team. Essentially, BIM builds any building twice: once in the virtual world, where any faults are resolved, and finally, in the real world. There is, however, no established model for learning through the use of this technology in Architecture courses. Queensland University of Technology (QUT), a tertiary institution that maintains close links with industry, recognises the importance of equipping their graduates with skills that are relevant to industry. BIM skills are currently in increasing demand throughout the construction industry through the evolution of construction industry practices. As such, during the second half of 2008, QUT 4th year architectural students were formally introduced for the first time to BIM, as both a technology and as an industry practice. This paper will outline the teaching team’s experiences and methodologies in offering a BIM unit (Architectural Technology and Science IV) at QUT for the first time and provide a description of the learning model. The paper will present the results of a survey on the learners’ perspectives of both BIM and their learning experiences as they learn about and through this technology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Current software tools for documenting and developing models of buildings focus on supporting a single user who is a specialist in the specific software used within their own discipline. Extensions to these tools for use by teams maintain the single discipline view and focus on version and file management. There is a perceived need in industry to have tools that specifically support collaboration among individuals from multiple disciplines with both a graphical representation of the design and a persistent data model. This project involves the development of a prototype of such a software tool. We have identified multi-user 3D virtual worlds as an appropriate software base for the development of a collaborative design tool. These worlds are inherently multi-user and therefore directly support collaboration through a sense of awareness of others in the virtual world, their location within the world, and provide various channels for direct and indirect communication. Such software platforms also provide a 3D building and modelling environment that can be adapted to the needs of the building and construction industry. DesignWorld is a prototype system for collaborative design developed by augmenting the Second Life (SL) commercial software platform1 with a collection web-based tools for communication and design. Agents manage communication between the 3D virtual world and the web-based tools. In addition, agents maintain a persistent external model of designs in the 3D world which can be augmented with data such as relationships, disciplines and versions not usually associated with 3D virtual worlds but required in design scenarios.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study investigated the effects of factors like member satisfaction and social rituals on desirable outcomes such as attendance, intention to rejoin and merchandise sales. This study focuses on the inaugural members of a new team in Australia’s A-League to gain insight into how loyalty develops amongst fans of new sporting organisations. The results show the importance to sports marketers of satisfying members and building ritual behaviour, as both are correlated with all of the positive outcomes investigated here.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives: The Nurse Researcher Project (NRP) was initiated to support development of a nursing research and evidence based practice culture in Cancer Care Services (CCS) in a large tertiary hospital in Australia. The position was established and evaluated to inform future directions in the organisation.---------- Background: The demand for quality cancer care has been expanding over the past decades. Nurses are well placed to make an impact on improving health outcomes of people affected by cancer. At the same time, there is a robust body of literature documenting the barriers to undertaking and utilising research by and for nurses and nursing. A number of strategies have been implemented to address these barriers including a range of staff researcher positions but there is scant attention to evaluating the outcomes of these strategies. The role of nurse researcher has been documented in the literature with the aim to provide support to nurses in the clinical setting. There is, to date, little information in relation to the design, implementation and evaluation of this role.---------- Design: The Donabedian’s model of program evaluation was used to implement and evaluate this initiative.---------- Methods: The ‘NRP’ outlined the steps needed to implement the nurse researcher role in a clinical setting. The steps involved the design of the role, planning for the support system for the role, and evaluation of outcomes of the role over two years.---------- Discussion: This paper proposes an innovative and feasible model to support clinical nursing research which would be relevant to a range of service areas.---------- Conclusion: Nurse researchers are able to play a crucial role in advancing nursing knowledge and facilitating evidence based practice, especially when placed to support a specialised team of nurses at a service level. This role can be implemented through appropriate planning of the position, building a support system and incorporating an evaluation plan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.