983 resultados para Short-Circuit
Resumo:
Nowadays, one of the most important challenges to enhance the efficiency of thin film silicon solar cells is to increase the short circuit intensity by means of optical confinement methods, such as textured back-reflector structures. In this work, two possible textured structures to be used as back reflectors for n-i-p solar cells have been optically analyzed and compared to a smooth one by using a system which is able to measure the angular distribution function (ADF) of the scattered light in a wide spectral range (350-1000 nm). The accurate analysis of the ADF data corresponding to the reflector structures and to the μc-Si:H films deposited onto them allows the optical losses due to the reflector absorption and its effectiveness in increasing light absorption in the μc-Si:H layer, mainly at long wavelengths, to be quantified.
Resumo:
Jotta kiinteistösähköverkkojen laskentaohjelmia voidaan vertailla mielekkäästi keskenään, on tunnettava suunnitteluprosessin vaiheet ja tarvittavat laskelmat. Sähköverkon mitoituksessa tärkeitä tietoja ovat verkon oikosulkuteho, kuormitukset ja vikavirrat, joiden avulla määritellään tarvittavat suojaukset, johtojen poikkipinnat ja jännitteenalenemat. Tällä hetkellä markkinoilla olevia ohjelmia ovat esimerkiksi Ecodial, NolaWi, DOCWin, EDSA ja KUBS+. Kun painotetaan ohjelman hintaa, kieltä, verkon rakentamista, komponenttikirjastojen kokoa, solmupisteiden määrää, suojauksen selektiivisyyden tarkastamista ja kosketusjännitesuojauksen toiminnan toteamista sekä tuloksien esitystä niin ohjelmista parhaiten pärjäävät Ecodial ja DOCWin. Vertailun tuloksena ehdotetaan suunnittelutyöhön valittavaksi ohjelmaksi ABB:n DOCWin:a, joka täyttää parhaiten halutut ominaisuudet ja on lisäksi käyttökustannuksiltaan edullinen.
Resumo:
Tässä työssä on tutkittu IGBT-modulin kyllästysvalvontaa. Periaatteellisena erona yleisesti käytössä olevaan IGBT:n kyllästysvalvontamenetelmään on valvonnan perustuminen IGBT-modulin läpi kulkevaan virtaan, sen yli olevan jännitteen mittaamisen asemesta. IGBT-modulin läpi kulkeva virta aiheuttaa pienen jännitehäviön IGBT-modulin sisällä olevassa DC-miinuskiskossa. Jännitehäviön suuruus riippuu modulin läpi kulkevan virran suuruudesta. Jännitehäviö voidaan mitata kahden mittapisteen välisenä jännite-erona. Kun jännite-ero mittapisteiden välillä kasvaa tarpeeksi suureksi, IGBT:n voidaan olettaa olevan oikosulussa ja laukaisu voidaan suorittaa. Kyllästystilan havaitsemista kuitenkin vaikeuttaa se, että kyseisen DC-miinuskiskon läpi kulkee moottorivirta. Moottorivirran aiheuttamat jännite-erot on pystyttävä erottamaan luotettavasti oikosulkutilanteesta. Lisäksi komponentin ylikuormitettavuusvaatimukset lisäävät kytkennän toteuttamisen vaikeutta. Komponenttia voidaan hetkellisesti ylikuormittaa moninkertaisella nimellisvirralla eikä tämäkään tilanne saa johtaa laukaisuun.Kyllästysvalvonta toteutetaan taajuusmuuttajaan, joka on tunnetusti varsin häiriöinen ympäristö. DC-miinuskiskon mittapisteiden välissä on tämän johdosta havaittavissa virrasta riippuvan jännite-eron lisäksi erittäin voimakkaita kytkentäilmiöistä johtuvia häiriöitä. Myös muiden IGBT-modulien kytkentäilmiöistä johtuvat häiriöt kytkeytyvät kyllästysvalvontakytkentään ja vaikeuttavat osaltaan sen toteuttamista.
Resumo:
Tässä kandidaatintyössä on tarkoitus määrittää monitoisioisen muuntajan yksivaiheisen sijaiskytkentä ja sen parametrit käyttämällä perinteisiä mittausmenetelmiä. Näihin kuuluvat tyhjäkäynti-, oikosulku- sekä tasajännitekoe. Muuntajasta on tehty simulointimalli, jota varten sijaiskytkennän parametreja tarvitaan.
Resumo:
This master’s thesis is focused on optimizing the parameters of a distribution transformer with respect to low voltage direct current (LVDC) distribution system. One of the main parts of low voltage direct current (LVDC) distribution system is transformer. It is studied from several viewpoints like filtering capabilities of harmonics caused by rectifier, losses and short circuit current limiting Determining available short circuit currents is one of the most important aspects of designing power distribution systems. Short circuits and their effects must be considered in selecting electrical equipment, circuit protection and other devices.
Resumo:
Tämän työn tavoitteena on analysoida Vaasan Sähköverkko Oy:n keskijänniteverkon nykytila sekä selvittää verkon kehittämisen suuntaviivoja. Nykytilan määrityksessä selvitetään kuormitettavuusasteet, jännitteenalenemat, häviöt oiko- ja maasulkusuojauksen toimivuus sekä keskeytyskustannukset. Nykytilan määrityksen apuna käytettiin verkkotietojärjestelmä Xpowerin tehojako-, oikosulku- ja maasulkulaskentoja. Nykytila on määritetty sekä normaalissa kytkentätilanteessa, että tilanteessa jossa yksi sähköasema kerrallaan on poissa käytöstä. Nykytilan määrityksen perusteella voidaan todeta, että normaalissa kytkentätilanteessa keskijänniteverkko täyttää suurilta osin sille asetetut tekniset reunaehdot, jotka ovat jännitteenalenema, kuormitettavuus, oikosulkukestoisuus sekä oiko- ja maasulkusuojauksen havahtuvaisuus. Jotta reunaehdot toteutuisivat kokonaisuudessaan, tulee oikosulkukestottomien lähtöjen releasetteluja muuttaa tai vaihtaa oikosulkukestottomat johto-osuudet suurempi poikkipintaiseen johtimeen. Nykytilan määrityksen perusteella neljän päämuuntajan kuormitettavuusaste on yli 90 %, joten näiden asemien alueiden kehitystä tulee tarkkailla. Sähköasemien korvaustarkastelun perusteella viiden sähköaseman korvaus tuottaa ongelmia jo nykyisillä huippukuormilla. Työssä tehtyjen selvitystöiden perusteella Vaasan Sähköverkko Oy:n keskijänniteverkkoon lisättiin 10 maastokatkaisijaa sekä selvitettiin verkon mahdollisia tulevaisuuden kehittämisen suuntaviivoja.
Resumo:
The aim of this master’s thesis is to develop an algorithm to calculate the cable network for heat and power station CHGRES. This algorithm includes important aspect which has an influence on the cable network reliability. Moreover, according to developed algorithm, the optimal solution for modernization cable system from economical and technical point of view was obtained. The conditions of existing cable lines show that replacement is necessary. Otherwise, the fault situation would happen. In this case company would loss not only money but also its prestige. As a solution, XLPE single core cables are more profitable than other types of cable considered in this work. Moreover, it is presented the dependence of value of short circuit current on number of 10/110 kV transformers connected in parallel between main grid and considered 10 kV busbar and how it affects on final decision. Furthermore, the losses of company in power (capacity) market due to fault situation are presented. These losses are commensurable with investment to replace existing cable system.
Resumo:
Työssä selvitetään elintarviketehtaan sähköverkon kunto sen suurimpien sähkönsyöttöjen osalta ja lasketaan oikosulkuvirtojen suuruus, kaapeleiden kuormitettavuus ja jännitteenalenemat verkon eri osissa. Laskentatulosten analysoinnin jälkeen esitetään korjaavat toimenpiteet löydettyjen epäkohtien osalta. Lisäksi tarkastellaan tehtaan energiankulutusta ja suunniteltujen energiansäästöehdotuksien vaikutuksia sähköverkon toimintaan. Työssä arvioidaan myös verkon eri osienvikaantumisen vaikutusta tehtaan tuotantoon ja esitetään parannuskeinoja verkon luotettavuuden parantamiseksi. Lopuksi on esitelty suunnitelma sähköverkon laajentamiselle ja käyty läpi tulevien investointien sähköteknistä mitoitusta ja vaikutusta verkon tulevaan tilaan.
Resumo:
Electrical motors on a ship attackable to different factors which decrease these lifetimes. One of the main external factors on a ship which usually is a reason of the motor failure is a moisture condensation which decreases the motor winding insulation and increase a probability of the short circuit. Therefore, the protection against moisture is necessary for ship electrical motors. The motor should be protected against moisture all time when it does not operate. The necessity of such protection requires a lot of energy consumption. This master’s thesis is focused on the creation of the electrical motor thermal model and on the different methods of the motor protection against moisture analysis with energy consumption point of view.
Resumo:
Since the introduction of automatic orbital welding in pipeline application in 1961, significant improvements have been obtained in orbital pipe welding systems. Requirement of more productive welding systems for pipeline application forces manufacturers to innovate new advanced systems and welding processes for orbital welding method. Various methods have been used to make welding process adaptive, such as visual sensing, passive visual sensing, real-time intelligent control, scan welding technique, multi laser vision sensor, thermal scanning, adaptive image processing, neural network model, machine vision, and optical sensing. Numerous studies are reviewed and discussed in this Master’s thesis and based on a wide range of experiments which already have been accomplished by different researches the vision sensor are reported to be the best choice for adaptive orbital pipe welding system. Also, in this study the most welding processes as well as the most pipe variations welded by orbital welding systems mainly for oil and gas pipeline applications are explained. The welding results show that Gas Metal Arc Welding (GMAW) and its variants like Surface Tension Transfer (STT) and modified short circuit are the most preferred processes in the welding of root pass and can be replaced to the Gas Tungsten Arc Welding (GTAW) in many applications. Furthermore, dual-tandem gas metal arc welding technique is currently considered the most efficient method in the welding of fill pass. Orbital GTAW process mostly is applied for applications ranging from single run welding of thin walled stainless tubes to multi run welding of thick walled pipes. Flux cored arc welding process is faster process with higher deposition rate and recently this process is getting more popular in pipe welding applications. Also, combination of gas metal arc welding and Nd:YAG laser has shown acceptable results in girth welding of land pipelines for oil and gas industry. This Master’s thesis can be implemented as a guideline in welding of pipes and tubes to achieve higher quality and efficiency. Also, this research can be used as a base material for future investigations to supplement present finding.
Resumo:
All over the world power systems become bigger and bigger every day. New equipment is installed, new feeders are constructed, new power units are installed. Some old elements of the network, however, are not changed in time. As a result, “bottlenecks” for capacity transmission can occur. By locked power problem the situation when a power plant has installed capacity exceeding the power it can actually deliver is usually meant. Regime, scheme or even technical restrictions-related issues usually cause this kind of problem. It is really important, since from the regime point of view it is typical decision to have a mobile capacity reserve, in case of malfunctions. And, what can be even more significant, power plant owner (JSC Fortum in our case) losses his money because of selling less electrical energy. The goal of master`s thesis is to analyze the current state of Chelyabinsk power system and the CHP-3 (Combined Heat and Power plant) in particular in relation with it`s ability to deliver the whole capacity of the CHP in it`s existing state and also taking into consideration the prospect of power unit 3 installation by the fourth quarter of 2010. The thesis contains some general information about the UPS of Russia, CPS of Ural, power system of Chelyabinsk and the Chelyabinsk region itself. Then the CHP-3 is described from technical point of view with it`s equipment observation. Regimes for the nowadays power system and for the system after the power unit 3 installation are reviewed. The problems occurring are described and, finally, a solution is offered.
Resumo:
Työssä tutkitaan, kuinka pitkää moottorikaapelia on jännitevälipiiritaajuusmuuttajan kanssa mahdollista käyttää niin, että määritellyt reunaehdot vielä toteutuvat. Tavoitteena on tuottaa tietoa myynnille, markkinoinnille, tuotehallinnalle sekä tuoteylläpidolle siitä, miten taajuus-muuttaja toimii pidemmillä moottorikaapeleilla kuin valmistaja suosittelee. Tutkitut moottori-kaapelipituudet olivat 175…1025 metriä ja tutkitut laitteet nimellislähtövirroiltaan 2,4...25 A. Työssä aihetta käsitellään jänniteheijastusten näkökulmasta. Lisäksi tutkitaan moottorikaapelin pituuden vaikutusta taajuusmuuttajan eri komponenttien lämpenemiseen. Taajuusmuuttajan toiminnallisuutta arvioidaan moottorin suunnanvaihtojen avulla sekä turvallista toimintaa oikosulkutestein. Tutkittujen taajuusmuuttajien kohdalla on mahdollista käyttää taajuusmuuttajavalmistajan suositusta pidempiä moottorikaapeleita. Moottoriliittimien ylijännitteitä aiheuttavat jännite-heijastukset eivät aiheuttaneet raja-arvoja ylittäviä huippujännitteitä tutkituilla laitekokoon-panoilla. Myös lämpötilannousu oli maltillista tai jopa vähäistä taajuusmuuttajasta mitatuilla komponenteilla. Moottorisäätö havaittiin toimintakykyiseksi pidemmilläkin moottorikaape-leilla, tosin moottorin vääntömomentti heikkeni moottorikaapelien pituutta kasvatettaessa. Virranmittaus toimi hyvin myös pitkillä kaapeleilla, tuottaen vikalaukaisun kaikissa tehdyissä oikosulkutilanteissa. Moottorin ja taajuusmuuttajan melutaso nousivat moottorikaapelien pi-tuutta kasvatettaessa, vaikkakin moottorin käynti oli tasaista ja katkotonta Moottorikaapelin pituutta voidaan kasvattaa 325 metriin kaikissa tutkituissa laitteissa ilman, että mikään tutkittu ominaisuus vielä olennaisesti heikkenisi. Vielä 525 metrin moottorikaape-leita on mahdollista käyttää, mutta tällöin vääntömomentin tuotto on jo heikompaa.
Resumo:
This work describes the methodology, basic procedures and instrumental employed by the Solar Energy Laboratory at Universidade Federal do Rio Grande do Sul for the determination of current-voltage characteristic curves of photovoltaic modules. According to this methodology, I-V characteristic curves were acquired for several modules under diverse conditions. The main electrical parameters were determined and the temperature and irradiance influence on photovoltaic modules performance was quantified. It was observed that most of the tested modules presented output power values considerably lower than those specified by the manufacturers. The described hardware allows the testing of modules with open-circuit voltage up to 50 V and short-circuit current up to 8 A.
Resumo:
In view of the importance of the intestine in the osmoregulation of freshwater fishes, we determined the effects of oxytocin, urotensin II (UII), and aldosterone added to the serosal side of the isolated posterior intestine of the freshwater-adapted teleost Anguilla anguilla on electrophysiological parameters. Oxytocin decreased the short-circuit current (SCC) and transepithelial potential difference (TPD) at concentrations of 1 and 10 mU/ml (to 50% and 42% of control values, respectively), but did not alter these parameters at a concentration of 0.1 mU/ml. UII reduced SCC and TPD at concentrations of 10 nM, 50 nM and 100 nM (to 85% of control values), but increased these parameters at the concentration of 500 nM (to 115% of control values). Aldosterone did not alter SCC or TPD at the concentrations tested (10 nM and 100 nM). Oxytocin may open Na+ channels in the apical membrane, allowing the flow of Na+ to the serosa, reducing SCC and TPD. Should this hypothesis be correct, oxytocin would be important for freshwater adaptation, since it would increase Na+ absorption. The reduction of SCC and TPD in the posterior intestine of A. anguilla induced by UII is evidence that this neurohormone is also important for freshwater adaptation in teleosts. Aldosterone did not show this effect probably due to the lack of receptors in this organ
Resumo:
Shiga toxin (Stx)-producing Escherichia coli (STEC) colonizes the large intestine causing a spectrum of disorders, including watery diarrhea, bloody diarrhea (hemorrhagic colitis), and hemolytic-uremic syndrome. It is estimated that hemolytic-uremic syndrome is the most common cause of acute renal failure in infants in Argentina. Stx is a multimeric toxin composed of one A subunit and five B subunits. In this study we demonstrate that the Stx2 B subunit inhibits the water absorption (Jw) across the human and rat colonic mucosa without altering the electrical parameters measured as transepithelial potential difference and short circuit current. The time-course Jw inhibition by 400 ng/ml purified Stx2 B subunit was similar to that obtained using 12 ng/ml Stx2 holotoxin suggesting that both, A and B subunits of Stx2 contributed to inhibit the Jw. Moreover, non-hemorrhagic fluid accumulation was observed in rat colon loops after 16 h of treatment with 3 and 30 ng/ml Stx2 B subunit. These changes indicate that Stx2 B subunit induces fluid accumulation independently of A subunit activity by altering the usual balance of intestinal absorption and secretion toward net secretion. In conclusion, our results suggest that the Stx2 B subunit, which is non-toxic for Vero cells, may contribute to the watery diarrhea observed in STEC infection. Further studies will be necessary to determine whether the toxicity of Stx2 B subunit may have pathogenic consequences when it is used as a component in an acellular STEC vaccine or as a vector in cancer vaccines.