951 resultados para Public projects


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"Supersedes PA-392, Small watershed projects under the Watershed protection and flood prevention act."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"Issued May 1963, slightly revised May 1968."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Considers (90) S. 537, (90) S. 1144, , (90) S. 1215, (90) S. 1529, (90) S. 1549, (90) S. 1622 , (90) S. 1812, (90) S. 2024, (90) S. 2059, (90) S. 2169. (90) S. 2236,(90) S. 2611.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Digitization offers excellent opportunities for the preservation and safe-keeping of valuable library collections. The article recounts the first coordinated attempts of “Ivan Vazov” Public Library – Plovdiv at digitizing some of its treasured collections such as manuscripts, early printed books and archives through partner projects and revealing them to the world community.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A tanulmány a Public-Private Partnership (PPP) egyik nagy kérdésének megközelítéseit vizsgálja: miként védhető a közérdek e projektekben. Piaci és nem piaci megoldásokat tesz az elemzés mérlegre, valamint kitér arra, hogy miért különleges a PPP projektek esetében a közérdek védelmének kérdése. A szabályozott verseny körülményeinek kialakítása több megközelítésben is perdöntő kérdés a PPP értéknövelésének előmozdításához, bár a létező megoldások nem mentesek anomáliáktól. A képviseleti demokrácia intézményi működésének támogatására pedig a társadalmi részvétel megoldásait javasolja az irodalom. E megközelítés is több formájában, többféle céllal és szintén kihívásokkal segítheti az értéknövelő PPP projekteket. A tanulmány az elvi lehetőségek értékelő elemzését követően a megvalósítás realitásait is mérlegre teszi. = This study focuses on a key issue in Public-Private Partnership (PPP) projects: how may public interest be protected. It assesses market based and non market based approaches, and also explains why PPP projects are peculiar when addressing the protection of public interest. Setting up the conditions for simulated competition is of paramount importance for different reasons in order to enable value creating PPP projects. Existing solutions however are not without anomalies. To promote the institutions of democracy, participatory solutions are recommended in the literature. That approach may help value creating PPP projects in various forms, with a range of objectives and challenges. The study concludes the analytical assessment of options by highlighting the realistic conditions of implementation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A tanulmány a Public-Private Partnership (PPP) immanens logikai kihívásai közül két kiemelt kérdést elemez: az állami fél közszolgálati-közigazgatási beágyazottságából eredő dilemmákat, valamint az állami és a magánfél eltérő kulturális hátteréből eredő feszültségek jellemzőit. A PPP projektek gyakorlati megvalósítása szempontjából e két kardinális kérdés kifinomult elméleti hátterébe nyújt bepillantást. A közszolgáltatási dilemmák közül azonosítja és tárgyalja a jogszerűség vs. eredményesség, a hatékonyság vs. eredményesség, a centralizáció vs. decentralizáció, a közérdek vs. egyéni szabadságjogok védelme, valamint a kormányzat kicsinyítése vs. jogbiztonság védelme, és a vállalkozói szemlélet vs. közszolgálatiság közti egyensúlyozás kihívásait. Az állami és az üzleti fél kulturális különbözőségének központi motívumaként a döntéshozatalbeli különbséget ragadja meg, és a bizalom szerepét hangsúlyozza a működőképes modell megtalálásának lehetőségeként. = This study analyses two cardinal issues of Public-Private Partnership (PPP) projects’ immanent challenges: the management dilemmas of public services/governance, and the tensions between the private and public parties due to their different cultural imbeddedness. It provides theoretical insights into these two issues of practical relevance. As public service management dilemmas, it identifies the trade-offs between rights vs. effectiveness, efficiency vs. effectiveness, centralization vs. decentralization, protecting the public interest vs. individual freedom, minimizing government vs. protecting human rights, the entrepreneurial approach vs. public service ethos. The study captures the cultural difference between the public and the private parties in their different approaches to decision making, while it concludes that the role of trust is key in finding feasible solutions for PPP models.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.