863 resultados para Public address systems


Relevância:

90.00% 90.00%

Publicador:

Resumo:

One of the main problems in urban areas is the steady growth in car ownership and traffic levels. Therefore, the challenge of sustainability is focused on a shift of the demand for mobility from cars to collective means of transport. For this purpose, buses are a key element of the public transport systems. In this respect Real Time Passenger Information (RTPI) systems help people change their travel behaviour towards more sustainable transport modes. This paper provides an assessment methodology which evaluates how RTPI systems improve the quality of bus services performance in two European cities, Madrid and Bremerhaven. In the case of Madrid, bus punctuality has increased by 3%. Regarding the travellers perception, Madrid raised its quality of service by 6% while Bremerhaven increased by 13%. On the other hand, the users¿ perception of Public Transport (PT) image increased by 14%.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

El objetivo de este Proyecto Fin de Grado es el diseño de megafonía y PAGA (Public Address /General Alarm) de la estación de tren Waipahu Transit Center en la ciudad de Honolulú, Hawái. Esta estación forma parte de una nueva línea de tren que está en proceso de construcción actualmente llamada Honolulu Rail Transit. Inicialmente la línea de tren constará de 21 estaciones, en las que prácticamente todas están diseñadas como pasos elevados usando como referencia las autopistas que cruzan la isla. Se tiene prevista su fecha de finalización en el año 2019, aunque las primeras estaciones se inaugurarán en 2017. Se trata en primer lugar un estudio acústico del recinto a sonorizar, eligiendo los equipos necesarios: conmutadores, altavoces, amplificadores, procesador, equipo de control y micrófonos. Este primer estudio sirve para obtener una aproximación de equipos necesarios, así como la posible situación de estos dentro de la estación. Tras esto, se procede a la simulación de la estación mediante el programa de simulación acústica y electroacústica EASE 4.4. Para ello, se diseña la estación en un modelo 3D, en el que cada superficie se asocia a su material correspondiente. Para facilitar el diseño y el cómputo de las simulaciones se divide la estación en 3 partes por separado. Cada una corresponde a un nivel de la estación: Ground level, el nivel inferior que contiene la entrada; Concourse Level, pasillo que comunica los dos andenes; y Platform Level, en el que realizarán las paradas los trenes. Una vez realizado el diseño se procede al posicionamiento de altavoces en los diferentes niveles de la estación. Debido al clima existente en la isla, el cual ronda los 20°C a lo largo de todo el año, no es necesaria la instalación de sistemas de aire acondicionado o calefacción, por lo que la estación no está totalmente cerrada. Esto supone un problema al realizar las simulaciones en EASE, ya que al tratarse de un recinto abierto se deberán hallar parámetros como el tiempo de reverberación o el volumen equivalente por otros medios. Para ello, se utilizará el método Ray Tracing, mediante el cual se halla el tiempo de reverberación por la respuesta al impulso de la sala; y a continuación se calcula un volumen equivalente del recinto mediante la fórmula de Eyring. Con estos datos, se puede proceder a calcular los parámetros necesarios: nivel de presión sonora directo, nivel de presión sonora total y STI (Speech Transmission Index). Para obtener este último será necesario ecualizar antes en cada uno de los niveles de la estación. Una vez hechas las simulaciones, se comprueba que el nivel de presión sonora y los valores de inteligibilidad son acordes con los requisitos dados por el cliente. Tras esto, se procede a realizar los bucles de altavoces y el cálculo de amplificadores necesarios. Se estudia la situación de los micrófonos, que servirán para poder variar la potencia emitida por los altavoces dependiendo del nivel de ruido en la estación. Una vez obtenidos todos los equipos necesarios en la estación, se hace el conexionado entre éstos, tanto de una forma simplificada en la que se pueden ver los bucles de altavoces en cada nivel de la estación, como de una forma más detallada en la que se muestran las conexiones entre cada equipo del rack. Finalmente, se realiza el etiquetado de los equipos y un presupuesto estimado con los costes del diseño del sistema PAGA. ABSTRACT. The aim of this Final Degree Project is the design of the PAGA (Public Address / General Alarm) system in the train station Waipahu Transit Center in the city of Honolulu, Hawaii. This station is part of a new rail line that is currently under construction, called Honolulu Rail Transit. Initially, the rail line will have 21 stations, in which almost all are designed elevated using the highways that cross the island as reference. At first, it is treated an acoustic study in the areas to cover, choosing the equipment needed: switches, loudspeakers, amplifiers, DPS, control station and microphones. This first study helps to obtain an approximation of the equipments needed, as well as their placement inside the station. Thereafter, it is proceeded to do the simulation of the station through the acoustics and electroacoustics simulation software EASE 4.4. In order to do that, it is made the 3D design of the station, in which each surface is associated with its material. In order to ease the design and calculation of the simulations, the station has been divided in 3 zones. Each one corresponds with one level of the station: Ground Level, the lower level that has the entrance; Concourse Level, a corridor that links the two platforms; and Platform Level, where the trains will stop. Once the design is made, it is proceeded to place the speakers in the different levels of the station. Due to the weather in the island, which is about 20°C throughout the year, it is not necessary the installation of air conditioning or heating systems, so the station is not totally closed. This cause a problem when making the simulations in EASE, as the project is open, and it will be necessary to calculate parameters like the reverberation time or the equivalent volume by other methods. In order to do that, it will be used the Ray Tracing method, by which the reverberation time is calculated by the impulse response; and then it is calculated the equivalent volume of the area with the Eyring equation. With this information, it can be proceeded to calculate the parameters needed: direct sound pressure level, total sound pressure level and STI (Speech Transmission Index). In order to obtain the STI, it will be needed to equalize before in each of the station’s levels. Once the simulations are done, it is checked that the sound pressure level and the intelligibility values agree with the requirements given by the client. After that, it is proceeded to perform the speaker’s loops and the calculation of the amplifiers needed. It is studied the placement of the microphones, which will help to vary the power emitted by the speakers depending on the background noise level in the station. Once obtained all the necessary equipment in the station, it is done the connection diagram, both a simplified diagram in which there can be seen the speaker’s loops in each level of the station, or a more detailed diagram in which it is shown the wiring between each equipment of the rack. At last, it is done the labeling of the equipments and an estimated budget with the expenses for the PAGA design.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Urban Mass Transportation Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Highway Planning, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Federal Highway Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Transportation Department, Secretary of Transportation, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Urban Mass Transportation Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Urban Mass Transportation Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Urban Mass Transportation Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Urban Mass Transportation Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Metro, Seattle, Wash.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Transportation Department, Office of University Research, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Transportation Department, Office of University Research, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Urban Mass Transportation Administration, Washington, D.C.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Federal Transit Administration, Washington, D.C.