846 resultados para Public Participation Geographic Information System


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Informa sobre el taller que tuvo como objetivo establecer procedimientos para mejorar los servicios del Centro de Documentacion del Secretariado Tecnico de Republica Dominicana y capacitarlo en su funcion de punto focal nacional del sistema de Informacion del Caribe.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract:The aim of this paper is to review the literature on voting systems based on Condorcet and Borda. We compared and classified them. Also we referred to some strengths and weaknesses of voting systems and finally in a case study, we made use of the Borda voting system for collective decision making in the Salonga National Park in the Democratic Republic of Congo. Resumen: el objetivo de este trabajo es hacer una revisión bibliográfica de los sistemas de votación basados en Condorcet y Borda. Se ha comparado y clasificado los mismos. Así mismo se ha hecho referencia a algunas debilidades y fortalezas de los sistemas de votación y por último en un caso de estudio, se ha hecho uso del sistema de votación de Borda para la toma de decisión colectiva en el Parque Nacional de Salonga en la República Democrática del Congo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Modern managers are under tremendous pressure in attempting to fulfil a profoundly complex managerial task, that of handling information resources. Information management, an intricate process requiring a high measure of human cognition and discernment, involves matching a manager's lack of information processing capacity against his information needs, with voluminous information at his disposal. The nature of the task will undoubtedly become more complex in the case of a large organisation. Management of large-scale organisations is therefore an exceedingly challenging prospect for any manager to be faced with. A system that supports executive information needs will help reduce managerial and informational mismatches. In the context of the Malaysian public sector, the task of overall management lies with the Prime Minister and the Cabinet. The Prime Minister's Office is presently supporting the Prime Minister's information and managerial needs, although not without various shortcomings. The rigid formalised structure predominant of the Malaysian public sector, so opposed to dynamic treatment of problematic issues as faced by that sector, further escalates the managerial and organisational problem of coping with a state of complexity. The principal features of the research are twofold: the development of a methodology for diagnosing the problem organisation' and the design of an office system. The methodological development is done in the context of the Malaysian public sector, and aims at understanding the complexity of its communication and control situation. The outcome is a viable model of the public sector. `Design', on the other hand, is developing a syntax or language for office systems which provides an alternative to current views on office systems. The design is done with reference to, rather than for, the Prime Minister's Office. The desirable outcome will be an office model called Office Communication and Information System (OCIS).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The polyparametric intelligence information system for diagnostics human functional state in medicine and public health is developed. The essence of the system consists in polyparametric describing of human functional state with the unified set of physiological parameters and using the polyparametric cognitive model developed as the tool for a system analysis of multitude data and diagnostics of a human functional state. The model is developed on the basis of general principles geometry and symmetry by algorithms of artificial intelligence systems. The architecture of the system is represented. The model allows analyzing traditional signs - absolute values of electrophysiological parameters and new signs generated by the model – relationships of ones. The classification of physiological multidimensional data is made with a transformer of the model. The results are presented to a physician in a form of visual graph – a pattern individual functional state. This graph allows performing clinical syndrome analysis. A level of human functional state is defined in the case of the developed standard (“ideal”) functional state. The complete formalization of results makes it possible to accumulate physiological data and to analyze them by mathematics methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Accounting Information System (AIS) is an important course in the Department of Accounting (DoAc) of universities in Taiwan. This course is required for seniors not only because it meets the needs of the profession, but also because it provides continual study for the department's students.^ The scores of The National College and University Joint Entrance Examination (NUEE) show that students with high learning ability are admitted to public universities with high scores, while those with low learning ability are admitted only to private universities. The same situation has been found by the researcher while teaching an AIS course in DoAc of The Public Chun Shin University (CSU) and The Private Chinese Culture University (CCU).^ The purpose of this study was to determine whether low ability students enrolled in private universities in Taiwan in a mastery learning program could attain the same level as high ability students from public universities enrolled in a traditional program. An experimental design was used. The mastery learning method was used to teach three groups of seniors with low learning ability studying in the DoAc at CCU. The traditional method was used to teach the control group which consisted of senior students of DoAc of CSU with high learning ability. As a part of the mastery learning strategy, a formative test, quizzes, and homework were completed by the experimental group only, while the mid-term examination was completed by both groups as part of the course. The dependent variable was the summative test, the final examination. It was completed by both groups upon the course's completion.^ As predicted, there were significant differences between the two groups' results on the pretest. There were no significant differences between the two groups' results on the posttest. These findings support the hypothesis of the study and reveal the effectiveness of mastery learning strategies with low learning ability students. ^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^