978 resultados para Project objectives


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The project outlined throughout this program management plan aims to develop a health-focused student advocacy group in the San Antonio Independent School District (SAISD). At its core, this project will be an opportunity for SAISD students to engage in service-learning, through which they will learn and develop by designing, organizing and participating in meaningful public health service experiences. ^ This program management plan addresses the genuine need for public health community education by using the service-learning model as a framework to engage students to effect change. The plan delineates the process by which the student advocacy group is to be assembled, selection of service-learning project, project objectives, technical objectives, and communication requirements. Ideally, the plan should help to facilitate project coordination, communication, and planning, and to support the direction of resources. The appendices that follow also provide useful tools with which to follow through with project implementation. ^ The plan is about more than providing a tool to educate students about the health issues in their community. It is about providing a way to teach health advocacy and self-interest and encourage civic engagement via public health. Students have the potential to positively effect lasting change among their peers, in their schools and in the community.^

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to present what kind of elements and evaluation methods should be included into a framework for evaluating the achievements and impacts of transport projects supported in EC Framework Programmes (FP). Further, the paper discusses the possibilities of such an evaluation framework in producing recommendations regarding future transport research and policy objectives as well as mutual learning for the basis of strategic long term planning. Methods The paper describes the two-dimensional evaluation methodology developed in the course of the FP7 METRONOME project. The dimensions are: (1) achievement of project objectives and targets in different levels and (2) research project impacts according to four impact groups. The methodology uses four complementary approaches in evaluation, namely evaluation matrices, coordinator questionnaires, lead user interviews and workshops. Results Based on the methodology testing, with a sample of FP5 and FP6 projects, the main results relating to the rationale, implementation and achievements of FP projects is presented. In general, achievement of objectives in both FPs was good. Strongest impacts were identified within the impact group of management and co-ordination. Also scientific and end-user impacts of the projects were adequate, but wider societal impacts quite modest. The paper concludes with a discussion both on the theoretical and practical implications of the proposed methodology and by presenting some relevant future research needs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

En este Proyecto de fin de carrera titulado: LA VÍDEOVIGILANCIA: TECNOLOGÍAS ACTUALES Y ASPECTOS SOCIOPOLÍTICOS, tiene como objetivo hacer un estudio en los sistemas de Vídeovigilancia basado en cámaras-IP, con fines de seguridad, control o supervisión. Nos basaremos en exponer los sistemas Vídeovigilancia basados en cámara-IP actuales de ultima generación, cuya principal virtud de estos sistemas, es la comunicación con otros lugares, o espacios públicos como privados y poder visualizar tanto en vivo como en diferido lo que este pasando en ese lugar y en ese momento o haya pasado a través del protocolo de comunicación-IP. Se explicara desde el más básico al más complejo sistema de videovigilancia-IP, también explicaremos su puesta en practica mediante los múltiples interconexiones que estos conlleven. Llegando a este punto, se nos plantea las siguientes cuestiones que da origen a este PFC. Estos sistemas de Vídeovigilancia-IP, captan las imágenes por medio de las cámaras-IP, proporcionando su facilidad tanto de visionado/grabacion, como de control, ya que no es necesario estar presente e interactuando con otros sistemas digitales de diverso índole actuales, gracias al protocolo-IP. Estos sistemas-IP, tienen su puesta en práctica mediante las instalaciones requeridas ,estas podrán ser sencillas o muy complejas de todos los sistemas-IP. Debido al gran aumento masivo, las tecnologías actuales de diverso índole de cámaras-IP en materia de la vídeovigilancia en lugares públicos, y privados en nuestra sociedad actual, lo hace un medio particularmente invasivo y por ello resulta necesario tanto la concurrencia de condiciones que legitimen los tratamientos de datos de personas identificables, como la definición de los principios y garantías que deban aplicarse ya que estas, repercutirán sobre los derechos de las personas, lo que obligara a fijar ciertas garantías. Se nos plantea los casos en los que la captación y/o tratamiento de imágenes con fines de Vídeovigilancia que pertenezcan a personas identificadas o identificables, ha obligado a España, y según dispuesto por la Directiva 95/46/CE del Parlamento Europeo, a regularizar esta situación mediante la Ley Orgánica de Protección de Datos (LOPD) 15/1999 de 13 de diciembre, bajo los procedimientos del Estado español en materia sociopolítica, y dando vigor a esta ley, mediante la aprobación de la Instrucción 1/2006 de 8 de noviembre de 2006, cuyo máximo organismo es la Agencia española de Protección de Datos (AGPD). Una vez planteada la motivación y justificación del proyecto, se derivan unos objetivos a cumplir con la realización del mismo. Los objetivos del proyecto se pueden diferenciar en dos clases principalmente. Los objetivos principales y objetivos secundarios. Los objetivos principales de este PFC, nacen directamente de las necesidades planteadas originalmente en materia de Vídeovigilancia, tanto tecnológicamente basado en las cámaras-IP en la captación y/o tratamiento de imágenes, así como sociopolíticamente donde trataremos de describirlo mediante las indicaciones y criterios con casos prácticos y de cómo deben de aplicarse según la instrucción 1/2006 mediante la LOPD en materia de Vídeovigilancia, en cuanto a la protección de datos que puedan repercutir sobre el derecho de las personas. Por otra parte los objetivos secundarios, son la extensión del objetivo primario y son de orden cuantificador en este PFC, dando una explicación más exhaustiva del objetivo principal. ABSTRACT In this final year project, entitled: THE VIDEOSURVEILLANCE: CURRENT TECHNOLOGIES AND POLITICALSOCIALS ASPECTS, aims to make a study of video surveillance systems based on IP cameras, for security, control or supervision. We will rely on to expose the camera based video surveillance systems IP-current last generation, whose main virtue of these systems, is communication with other places, or public and private spaces and to view both live and time so this happening in that place and at that time or passed through-IP communication protocol. He explained from the most basic to the most complex-IP video surveillance system, also explain its implementation into practice through multiple interconnections that these entail. Arriving at this point, we face the following issues which gave rise to this PFC. These IP-video surveillance systems, captured images through IP-cameras, providing both ease of viewing / recording, as a control, since it is not necessary to be present and interacting with other digital systems such diverse today, thanks IP-protocol. These systems-IP, have their implementation through the facilities required, these can be simple or very complex all-IP video surveillance systems. Due to the large increase in mass, current technologies of different kinds of IP cameras for video surveillance in public places, and private in our society, it makes a particularly invasive and therefore attendance is necessary both conditions that legitimize data processing of identifiable people, as the definition of the principles and safeguards to be applied as these will impact on the rights of the people, which forced to set certain guarantees. We face those cases in which the uptake and / or image processing video surveillance purposes belonging to identified or identifiable, has forced Spain, and as required by Directive 95/46/EC of the European Parliament, to regularize this situation by the Organic Law on Data Protection (LOPD) 15/1999 of December 13, under the procedures of the Spanish State in sociopolitical, and giving effect to this Act, with the approval of the Instruction 1/2006 of 8 November 2006, the governing body is the Spanish Agency for Data Protection (AGPD). Once raised the motivation and justification for the project, resulting in meeting targets to achieve the same. Project objectives can be differentiated into two main classes, the main objectives and secondary objectives: The main objectives of this PFC, born directly from requirements originally raised for capturing both technologically imaging me and try to describe where sociopolitically, the details and criteria as case studies and should be applied according to the instruction 1 / 2006 by the LOPD on video surveillance system in terms of data protection that could impact on the right people. Moreover the secondary objectives are the extension of the primary and are of a quantifier in this PFC, giving a fuller explanation of the main objective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

El reflectómetro óptico en el dominio del tiempo, conocido por sus siglas en inglés como OTDR, es un dispositivo muy utilizado en sistemas de comunicaciones por fibra óptica para conocer de una manera rápida y sencilla como varía la potencia óptica a lo largo de la fibra óptica, siendo otro de sus usos frecuentes la localización de fallos y roturas en un enlace. Este proyecto fin de carrera, consiste en la realización mediante Matlab de una interfaz gráfica que permite simular un OTDR para distintos tipos de fibras, conectores y empalmes visualizándose por pantalla la variación de la potencia óptica en función de la distancia, pudiendo ampliar cualquier tramo del enlace que se desee visualizar con mayor detalle. Los objetivos del proyecto podemos establecerlos en dos partes. Primero, realizar una interfaz que nos permita diseñar un enlace de fibra óptica de forma sencilla, permitiendo además medir desde la atenuación de la fibra a la de un empalme. En segundo lugar, emplear la interfaz desarrollada para comprobar conceptos teóricos, haciendo hincapié en los principales errores de un enlace de fibra óptica real. Para una mejor visualización y concepción de lo implementado, es necesario revisar los principios básicos de funcionamiento de la fibra óptica y las principales características de un enlace, así como, los distintos dispositivos que lo componen, para después explicar el funcionamiento del OTDR y sus usos; por ello, en los capítulos segundo y tercero, se explican estas nociones básicas, necesarias para un mejor entendimiento del proyecto. Para poder utilizar la interfaz gráfica de usuario, el capítulo cuarto muestra la descripción de las funciones con parámetros, así como el manual de usuario de la interfaz gráfica. En el capítulo quinto se hace una recopilación y estudios de resultados para distintas simulaciones comprobando desde casos sencillos a casos extremos en los que se debe prestar una especial atención a los elementos que componen el enlace, siendo finalmente, en el sexto capítulo donde se presentan distintas conclusiones así como posibles trabajos futuros, a partir de lo realizado. ABSTRACT. The optical time domain reflectometer, known as OTDR, is a widely used device in systems for fiber optic communications used to know quick and simply how the optical power its varying along the fiber, with particular emphasis to another of its frequent uses in troubleshooting on a link. This final project consists in carrying through a graphical interface in Matlab to simulate an OTDR for different types of fibers, connectors and splices, visualizing the variation of optical power as a function of the distance. It is possible to zoom in specific sections to view them with greater detail. The project objectives can be set in two parts: - Make an interface that allows us to design a fiber optic link easily and measuring from the fiber attenuation to a splice one. - Use the interface developed to test theoretical concepts, emphasizing the most important mistakes of a real optical fiber link. For better visualization and understanding of what it’s been implemented, it is necessary to review the basic operating principles of fiber optics and the main characteristics of a fiber link, and also the different types of devices that comprise it, and then explaining also how the OTDR works and its uses, therefore, in second and third chapters, explains these basics needed for a better understanding of the project. To use the GUI, the fourth chapter shows the description of the functions with parameters and the user manual of the GUI. The fifth chapter is a compilation and study of some simulation results for simple cases to check from simply to extreme cases putting special attention to the elements that make up the link. To sum up, in the sixth chapter will appear different conclusions and possible future works for improving the graphical interface or making a new one.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

AIRBUS Military has undertaken a project to implement the industrial Digital Mock-Up (iDMU) concept to support the industrialization process of a medium size aerostructure. Within the framework of a collaborative engineering strategy, such project is part of the efforts to deploy Digital Manufacturing as a key technology for the industrialization of aircrafts assembly lines. The project has confirmed the potential of the iDMU to improve the industrial design process in a collaborative engineering environment. This communication presents the main project objectives, the key methodological points, the main project achievements and the next additional developments to increase the scope and benefits of the iDMU concept.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

En este proyecto se abordan el diseño y análisis, con sus diferentes etapas, de varias configuraciones de prototipos para luminarias LED enfocadas al ámbito domestico e industrial. Se realizarán montajes sobre diferentes materiales para evaluar los resultados y decidir que soporte es más adecuado para cada circunstancia. Inicialmente expondremos el estado actual de esta tecnología y caracterizaremos, de forma preliminar, los dispositivos que vamos a utilizar para elaborar los prototipos que posteriormente analizaremos. Seguidamente detallaremos el proceso de construcción de cada prototipo, indicando especialmente las diferencias y similitudes entre ellos que, en siguientes secciones, serán analizadas. Trabajaremos con dos rangos de potencia para las luminarias. El primero de ellos se centra en obtener la máxima potencia lumínica, con valores comprendidos entre 40W y 50W, considerando un uso industrial, alumbrado público, etc. El segundo rango de potencias, se enfocará al ámbito doméstico, adecuando la temperatura de color a este entorno, para combinar la potencia, de entre 9W y 12W, con una iluminación más cálida. Finalmente someteremos los prototipos elaborados a una serie de análisis y, ante los resultados, concluiremos cuales serán aptos para el uso al que se pretenden dedicar y aquellos que deberán ser modificados. En el entorno de laboratorio, donde se llevaran a cabo análisis térmicos, eléctricos y lumínicos, emplearemos instrumental especializado para cada tipo de análisis así como su software correspondiente. A excepción de las mediciones relacionadas con el espectro de radiación lumínica, el resto serán obtenidas mediante la plataforma LabVIEW®, un completo software grafico para el desarrollo de instrumentación virtual. Como sección final, expondremos una evaluación sobre el cumplimiento de los objetivos establecidos para el proyecto, posibles mejoras o trabajos futuros y conclusiones obtenidas. ABSTRACT. This project concerns the design and analysis, with its different stages, of various configurations of LED luminaries prototypes focused on domestic and industrial environments. Mounts on different materials will be made to evaluate the results and decide which material is most appropriate for each circumstance. Initially we will expose the current state of this technology and characterize, in a preliminary way, the devices that we will use to produce the prototypes which subsequently will analyze. Later we detail the process of construction of each prototype, especially indicating the differences and similarities between them. In the following sections, we will analyze these characteristics. We will work with two power ranges for luminaries. The first one focuses on maximum light output, with values between 40W and 50W, thinking about industrial use, street lighting, etc. The second power range will focus on the domestic environment, adjusting the color temperature in this environment to combine power, between 9W and 12W, with warm lighting. Finally the prototypes will submit a series of analyzes and, with the results obtained, we conclude if will be suitable for the intended use and those that should be modified. In laboratory environment, where thermal, electrical and lighting analyzes were carried out, we will use specialized instruments for each type of analysis as well as the corresponding software. Except for measurements related to the spectrum of light radiation, the rest of information will be obtained by LabVIEW®, complete graphical development software for virtual instrumentation. As a final section, we will present an evaluation of compliance with the project objectives, possible future work, or improvements, and conclusions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Retention of sugarcane leaves and tops on the soil surface after harvesting has almost completely replaced pre- and post-harvest burning of crop residues in the Australian sugar industry. Since its introduction around 25 years ago, residue retention has increased soil organic matter to improve soil fertility as well as improve harvest flexibility and reduce erosion. However, in the wet tropics residue retention also poses potential problems of prolonged waterlogging, and late-season release of nitrogen which can reduce sugar content of the crop. The objective of this project is to examine the management of sugarcane residues in the wet tropics using a systems approach. Subsidiary objectives are (a) to improve understanding of nitrogen cycling in Australian sugarcane soils in the wet tropics, and (b) to identify ways to manage crop residues to retain their advantages and limit their disadvantages. Project objectives will be addressed using several approaches. Historic farm production data recorded by sugar mills in the wet tropics will be analysed to determine the effect of residue burning or retention on crop yield and sugar content. The impact of climate on soil processes will be highlighed by development of an index of nitrogen mineralisation using the Agricultural Production Systems Simulator (APSIM) model. Increased understanding of nitrogen cycling in Australian sugarcane soils and management of crop residues will be gained through a field experiment recently established in the Australian wet tropics. From this experiment the decomposition and nitrogen dynamics of residues placed on the soil surface and incorporated will be compared. The effect of differences in temperature, soil water content and pH will be further examined on these soils under glasshouse conditions. Preliminary results show a high ammonium to nitrate ratio in tropics soils, which may be due to low rates of nitrification that increase the retention of nitrogen in a form (ammonium) that is less subject to leaching. Further results will be presented at Congress.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient for ensuring time, cost and quality achievement of large-scale construction projects due to complexity in planning and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation) under-estimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk numagement throughout project life cycle. However, the effectiveness of risk management depends on the technique in which the effects of risk factors are analysed and! or quantified. This study proposes Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique as a tool for risk analysis because it can handle subjective as well as objective factors in decision model that are conflicting in nature. This provides a decision support system (DSS) to project managenumt for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and competitive business environment. The whole methodology is explained through a case study of a cross-country petroleum pipeline project in India and its effectiveness in project1nana.gement is demonstrated.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The current INFRAWEBS European research project aims at developing ICT framework enabling software and service providers to generate and establish open and extensible development platforms for Web Service applications. One of the concrete project objectives is developing a full-life-cycle software toolset for creating and maintaining Semantic Web Services (SWSs) supporting specific applications based on Web Service Modelling Ontology (WSMO) framework. According to WSMO, functional and behavioural descriptions of a SWS may be represented by means of complex logical expressions (axioms). The paper describes a specialized userfriendly tool for constructing and editing such axioms – INFRAWEBS Axiom Editor. After discussing the main design principles of the Editor, its functional architecture is briefly presented. The tool is implemented in Eclipse Graphical Environment Framework and Eclipse Rich Client Platform.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper reviews the literature of construction risk modelling and assessment. It also reviews the real practice of risk assessment. The review resulted in significant results, summarised as follows. There has been a major shift in risk perception from an estimation variance into a project attribute. Although the Probability–Impact risk model is prevailing, substantial efforts are being put to improving it reflecting the increasing complexity of construction projects. The literature lacks a comprehensive assessment approach capable of capturing risk impact on different project objectives. Obtaining a realistic project risk level demands an effective mechanism for aggregating individual risk assessments. The various assessment tools suffer from low take-up; professionals typically rely on their experience. It is concluded that a simple analytical tool that uses risk cost as a common scale and utilises professional experience could be a viable option to facilitate closing the gap between theory and practice of risk assessment.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Nas últimas décadas tem-se verificado uma degradação contínua do meio ambiente, intensificada pela produção em massa das indústrias, aliado a um crescente consumismo da sociedade. Atualmente, as organizações e a sociedade civil demonstram uma crescente preocupação com os problemas ambientais, é neste contexto que surgem as questões associadas aos sistemas de gestão ambiental (SGA), como forma de integrar as preocupações das organizações com a proteção do ambiente. O presente projeto, realizado no âmbito do estágio curricular do Mestrado de Engenharia do Ambiente, pretende explorar e servir de apoio na implementação e desenvolvimento de um Sistema de Gestão Ambiental em duas Unidades Industriais da Amorim & Irmãos, S.A. Para o cumprimento dos objetivos do projeto foi realizada uma revisão bibliográfica da temática Sistemas de Gestão Ambiental, que possibilitou alargar o conhecimento sobre o tema do estágio. A segunda fase do trabalho consistiu na integração nos processos e infraestruturas da empresa. A terceira fase incluiu a realização dos trabalhos práticos necessários para a implementação e desenvolvimento dos Sistemas de Gestão Ambiental. Tendo em conta a metodologia seguida conclui-se que a realização este projeto foi muito vantajosa para todas as partes envolvidas, tendo contribuído: para um grande avanço na implementação e desenvolvimento dos Sistemas de Gestão Ambiental nas duas Unidades Industriais, permitindo assim melhorar os seus desempenhos ambientais; para a aquisição e consolidação de conhecimentos na área e proporcionou uma experiencia que será benéfica no envolvimento de um projeto desta natureza.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Over the past 15 years, the number of international development projects aimed at combating global poverty has increased significantly. Within the water and sanitation sector however, and despite heightened global attention and an increase in the number of infrastructure projects, over 800 million people remain without access to appropriate water and sanitation facilities. The majority of donor aid in the water supply and sanitation sector of developing countries is delivered through standalone projects. The quality of projects at the design and preparation stage is a critical determinant in meeting project objectives. The quality of projects at early stage of design, widely referred to as quality at entry (QAE), however remains unquantified and largely subjective. This research argues that water and sanitation infrastructure projects in the developing world tend to be designed in the absence of a specific set of actions that ensure high QAE, and consequently have relatively high rates of failure. This research analyzes 32 cases of water and sanitation infrastructure projects implemented with partial or full World Bank financing globally from 2000 – 2010. The research uses categorical data analysis, regression analysis and descriptive analysis to examine perceived linkages between project QAE and project development outcomes and determines which upstream project design factors are likely to impact the QAE of international development projects in water supply and sanitation. The research proposes a number of specific design stage actions that can be incorporated into the formal review process of water and sanitation projects financed by the World Bank or other international development partners.