812 resultados para Project Approach


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Existing research and best practice were utilized to develop the Project Management, Stakeholder Engagement and Change Facilitation (PSC) approach to road safety infrastructure projects. Two case studies involving Queensland Transport and Main Roads demonstrated that use of the PSC has potential to create synergies for projects undertaken by multi-disciplinary road safety groups, and to complement Safe System projects and philosophy. The case studies were the North West Road Safety Alliance project, and the implementation of Road Safety Audit policy, and utilised a mix of qualitative and quantitative methods including interviews and surveys.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

An integrated approach to energy planning, when applied to large hydroelectric projects, requires that the energy-opportunity cost of the land submerged under the reservoir be incorporated into the planning methodology. Biomass energy lost from the submerged land has to be compared to the electrical energy generated, for which we develop four alternative formulations of the net-energy function. The design problem is posed as an LP problem and is solved for two sites in India. Our results show that the proposed designs may not be viable in net-energy terms, whereas a marginal reduction in the generation capacity could lead to an optimal design that gives substantial savings in the submerged area. Allowing seasonal variations in the hydroelectric generation capacity also reduces the reservoir size. A mixed hydro-wood generation system is then examined and is found to be viable.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Much of science progresses within the tight boundaries of what is often seen as a "black box". Though familiar to funding agencies, researchers and the academic journals they publish in, it is an entity that outsiders rarely get to peek into. Crowdfunding is a novel means that allows the public to participate in, as well as to support and witness advancements in science. Here we describe our recent crowdfunding efforts to sequence the Azolla genome, a little fern with massive green potential. Crowdfunding is a worthy platform not only for obtaining seed money for exploratory research, but also for engaging directly with the general public as a rewarding form of outreach.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The UK government started the UK eUniversities project in order to create a virtual campus for online education provisions, competing in a global market. The UKeU (WWW.ukeu.com) claims to "have created a new approach to e-learning" which "opens up a range of exciting opportunities for students, business and industry worldwide" to obtain both postgraduate and undergraduate qualifications. Although there has been many promises about the e-learning revolution using state-of-the-art multimedia technology, closer scrutiny of what is being delivered reveals that many of the e-learning models currently being used are little more than the old text based computer aided learning running on a global network. As part of the UKeU project a consortium of universities have been involved in developing a two year foundation degree from 2004. We look at the approach taken by the consortium in developing global e-learning provisions and the problems and the pitfalls that lay ahead.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Although discussions are underway within the Action Team 14 of the United Nations COPUOS, there is currently no concerted international plan addressing the impact threat from near-Earth objects (NEOs) and how to organize, prepare and implement mitigation measures. We report on a new international project to address impact hazard mitigation issues, being the subject of a proposal submitted to the European Commission in response to the 2011 FP7 Call "Prevention of impacts from near-Earth objects on our planet". Our consortium consists of 13 research institutes, universities, and industrial partners from 6 countries and includes leading US and Russian space organizations. The primary aim of the project, NEOShield, is to investigate in detail the three most promising mitigation techniques: the kinetic impactor, blast deflection,and the gravity tractor, and devise feasible demonstration missions. Furthermore, we will investigate options for an international strategy for implementation when an actual impact threat arises. The NEOShield project was formally accepted by the European Commission on 17 November 2011 and funded with a total of 5.8 million Euros for a period of 3.5 years. The kick-off meeting took place at the DLR Institute of Planetary Research, Berlin, in January 2012. In this paper we present a brief overview of the planned scope of the project.