886 resultados para Power distribution network


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The high active and reactive power level demanded by the distribution systems, the growth of consuming centers, and the long lines of the distribution systems result in voltage variations in the busses compromising the quality of energy supplied. To ensure the energy quality supplied in the distribution system short-term planning, some devices and actions are used to implement an effective control of voltage, reactive power, and power factor of the network. Among these devices and actions are the voltage regulators (VRs) and capacitor banks (CBs), as well as exchanging the conductors sizes of distribution lines. This paper presents a methodology based on the Non-Dominated Sorting Genetic Algorithm (NSGA-II) for optimized allocation of VRs, CBs, and exchange of conductors in radial distribution systems. The Multiobjective Genetic Algorithm (MGA) is aided by an inference process developed using fuzzy logic, which applies specialized knowledge to achieve the reduction of the search space for the allocation of CBs and VRs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a mixed integer nonlinear programming multiobjective model for short-term planning of distribution networks that considers in an integrated manner the following planning activities: allocation of capacitor banks; voltage regulators; the cable replacement of branches and feeders. The objective functions considered in the proposed model are: to minimize operational and investment costs and minimize the voltage deviations in the the network buses, subject to a set of technical and operational constraints. A multiobjective genetic algorithm based on a Non-Dominated Sorting Genetic Algorithm (NSGA-II) is proposed to solve this model. The proposed mathematical model and solution methodology is validated testing a medium voltage distribution system with 135 buses. © 2013 Brazilian Society for Automatics - SBA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, to solve the reconfiguration problem of radial distribution systems a scatter search, which is a metaheuristic-based algorithm, is proposed. In the codification process of this algorithm a structure called node-depth representation is used. It then, via the operators and from the electrical power system point of view, results finding only radial topologies. In order to show the effectiveness, usefulness, and the efficiency of the proposed method, a commonly used test system, 135-bus, and a practical system, a part of Sao Paulo state's distribution network, 7052 bus, are conducted. Results confirm the efficiency of the proposed algorithm that can find high quality solutions satisfying all the physical and operational constraints of the problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is focused on Smart Grid applications in medium voltage distribution networks. For the development of new applications it appears useful the availability of simulation tools able to model dynamic behavior of both the power system and the communication network. Such a co-simulation environment would allow the assessment of the feasibility of using a given network technology to support communication-based Smart Grid control schemes on an existing segment of the electrical grid and to determine the range of control schemes that different communications technologies can support. For this reason, is presented a co-simulation platform that has been built by linking the Electromagnetic Transients Program Simulator (EMTP v3.0) with a Telecommunication Network Simulator (OPNET-Riverbed v18.0). The simulator is used to design and analyze a coordinate use of Distributed Energy Resources (DERs) for the voltage/var control (VVC) in distribution network. This thesis is focused control structure based on the use of phase measurement units (PMUs). In order to limit the required reinforcements of the communication infrastructures currently adopted by Distribution Network Operators (DNOs), the study is focused on leader-less MAS schemes that do not assign special coordinating rules to specific agents. Leader-less MAS are expected to produce more uniform communication traffic than centralized approaches that include a moderator agent. Moreover, leader-less MAS are expected to be less affected by limitations and constraint of some communication links. The developed co-simulator has allowed the definition of specific countermeasures against the limitations of the communication network, with particular reference to the latency and loss and information, for both the case of wired and wireless communication networks. Moreover, the co-simulation platform has bee also coupled with a mobility simulator in order to study specific countermeasures against the negative effects on the medium voltage/current distribution network caused by the concurrent connection of electric vehicles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research presents the development and implementation of fault location algorithms in power distribution networks with distributed generation units installed along their feeders. The proposed algorithms are capable of locating the fault based on voltage and current signals recorded by intelligent electronic devices installed at the end of the feeder sections, information to compute the loads connected to these feeders and their electric characteristics, and the operating status of the network. In addition, this work presents the study of analytical models of distributed generation and load technologies that could contribute to the performance of the proposed fault location algorithms. The validation of the algorithms was based on computer simulations using network models implemented in ATP, whereas the algorithms were implemented in MATLAB.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The cost and limited flexibility of traditional approaches to 11kV network reinforcement threatens to constrain the uptake of low carbon technologies. Ofgem has released £500m of funding for DNOs to trial innovative techniques and share the learning with the rest of the industry. One of the techniques under study is the addition of Energy Storage at key substations to the network to help with peak load lopping. This paper looks in detail at the sizing algorithm for use in the assessment of alternatives to traditional reinforcement and investigates a method of sizing a battery for use on a Network taking into account load growth, capacity fade and battery lifecycle issues. A further complication to the analysis is the method of operation of the battery system and how this affects the Depth of Discharge (DoD). The proposed method is being trialled on an area of 11kV network in Milton Keynes Central area and the simulation results are presented in this paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dynamic asset rating is one of a number of techniques that could be used to facilitate low carbon electricity network operation. This paper focusses on distribution level transformer dynamic rating under this context. The models available for use with dynamic asset rating are discussed and compared using measured load and weather conditions from a trial Network area within Milton Keynes. The paper then uses the most appropriate model to investigate, through simulation, the potential gains in dynamic rating compared to static rating under two transformer cooling methods to understand the potential gain to the Network Operator.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses the potentiality of reconfiguring distribution networks into islanded Microgrids to reduce the network infrastructure reinforcement requirement and incorporate various dispersed energy resources. The major challenge would be properly breaking down the network and its resultant protection and automation system changes. A reconfiguration method is proposed based on allocation of distributed generation resources to fulfil this purpose, with a heuristic algorithm. Cost/reliability data is required for the next stage tasks to realise a case study of a particular network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports work of a MEng student final year project, which looks in detail at the impacts that distributed generation can have on existing low-voltage distribution network protection systems. After a review of up-to-date protection issues, this paper will investigate several key issues that face distributed generation connections when it comes to network protection systems. These issues include, the blinding of protection systems, failure to automatically reclose, unintentional islanding, loss of mains power and the false tripping of feeders. Each of these problems impacts on protection systems in its own way. This study aims to review and investigate these problems via simulation demonstrations on one representative network to recommend solutions to practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The realisation of an eventual low-voltage (LV) Smart Grid with a complete communication infrastructure is a gradual process. During this evolution the protection scheme of distribution networks should be continuously adapted and optimised to fit the protection and cost requirements at the time. This paper aims to review practices and research around the design of an effective, adaptive and economical distribution network protection scheme. The background of this topic is introduced and potential problems are defined from conventional protection theories and new Smart Grid technologies. Challenges are identified with possible solutions defined as a pathway to the ultimate flexible and reliable LV protection systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Automatic load transfer (ALT) on the 11 kV network is the process by which circuit breakers on the network are switched to form open points in order to feed load from different primary substations. Some of the potential benefits that may be gained from dynamically using ALT include maximising utilisation of existing assets, voltage regulation and reduced losses. One of the key issues, that has yet to be properly addressed in published research, is how to validate that the modelled benefits really exist. On an 11 kV distribution network where the load is continually changing and the load on each distribution substation is unlikely to be monitored - reduction in losses from moving the normally open point is particularly difficult to prove. This study proposes a method to overcome this problem and uses measured primary feeder data from two parts of the Western Power Distribution 11 kV Network under different configurations. The process of choosing the different configurations is based on a heuristic modelling method of locating minimum voltages to help reduce losses.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Future power systems are expected to integrate large-scale stochastic and intermittent generation and load due to reduced use of fossil fuel resources, including renewable energy sources (RES) and electric vehicles (EV). Inclusion of such resources poses challenges for the dynamic stability of synchronous transmission and distribution networks, not least in terms of generation where system inertia may not be wholly governed by large-scale generation but displaced by small-scale and localised generation. Energy storage systems (ESS) can limit the impact of dispersed and distributed generation by offering supporting reserve while accommodating large-scale EV connection; the latter (load) also participating in storage provision. In this paper, a local energy storage system (LESS) is proposed. The structure, requirement and optimal sizing of the LESS are discussed. Three operating modes are detailed, including: 1) storage pack management; 2) normal operation; and 3) contingency operation. The proposed LESS scheme is evaluated using simulation studies based on data obtained from the Northern Ireland regional and residential network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Today’s power system network is more complex with enhanced responsibility to maintain reliable, stable and quality supply of power at transmission and distribution level. Maintaining grid balance is a bigger issue, in case of any unexpected generation shortage or grid disturbance or any participation of an intermittent nature of renewable energy sources like wind and solar power in the energy mix. In order to compensate such imbalance and improve reliability, and stability of power system, an energy storage system (ESS) can be considered as a vital solution. Also ESS can be used to mitigate associated issues of renewable energy sources while integration into the power system network. Thus ESS supports to get a reduction in greenhouse gas (GHG) emissions by means of integrating more renewable energy sources to the grid effectively. There are various types of Energy Storage (ES) technologies which are being used in power systems network for large scale (MW) to small scale (KW) level. Based on the type and characteristics, each storage technology is suitable for a particular role of applications. This paper presents an extensive review study on various types of ES technologies in characteristics and applications point of view. It also demonstrates various applications of ESS in detail. Finally, with the aid of ES-selectTM tool software, a feasibility analysis has been carried out to identify a suitable ES technology for appropriate applications at different grid locations and also helps to develop a smart hybrid storage system for grid applications in future.