1000 resultados para Pedagogic projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the issues with sharing information between different disciplines in collaborative projects. The focus is on the information itself rather than the wider issues of collaboration. A range of projects carried out by the Cooperative Research Centre for Construction Innovation (CRC CI) in Australia is used to illustrate the issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When complex projects go wrong they can go horribly wrong with severe financial consequences. We are undertaking research to develop leading performance indicators for complex projects, metrics to provide early warning of potential difficulties. The assessment of success of complex projects can be made by a range of stakeholders over different time scales, against different levels of project results: the project’s outputs at the end of the project; the project’s outcomes in the months following project completion; and the project’s impact in the years following completion. We aim to identify leading performance indicators, which may include both success criteria and success factors, and which can be measured by the project team during project delivery to forecast success as assessed by key stakeholders in the days, months and years following the project. The hope is the leading performance indicators will act as alarm bells to show if a project is diverting from plan so early corrective action can be taken. It may be that different combinations of the leading performance indicators will be appropriate depending on the nature of project complexity. In this paper we develop a new model of project success, whereby success is assessed by different stakeholders over different time frames against different levels of project results. We then relate this to measurements that can be taken during project delivery. A methodology is described to evaluate the early parts of this model. Its implications and limitations are described. This paper describes work in progress.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The role of the evaluation for Official Development Assistance (ODA) enterprises including educational development has become critical after increasing “aid fatigue” experienced by the international community in the 1990s. To date, however, monitoring and evaluating outcomes of the projects has been limited to the project life. Consequently these have been mainly through the international aid agencies. Furthermore, the monitoring and evaluation led by international aid agencies have paid little attention to aspects of the sustainability of technical cooperation in educational development. To sustain the impact of technical cooperation, the reinforcement of evaluation has drawn increasing attention in light of the emerging modalities in international development. Therefore this research was inspired to investigate alternative evaluation frameworks for an educational reform project for teacher quality improvement that may increase possibilities for long term sustainability. Importantly, the new modalities in international development and educational issues provide new options. In addition, the research reviewed theoretical and practical issues surrounding evaluation in general, and highlighted the evaluation of education reform projects. The research reported explored via case studies, the evaluation processes employed by the Egyptian education reform projects implemented by the Japan International Cooperation Agency (JICA) and the United Nations Children’s Fund (UNICEF). The case studies used three data sources (archival and relevant documents, a survey questionnaire and interviews) to illuminate the contextually-embedded evaluation processes. The research found that process evaluation is a potential alternative method since it is likely to be locally institutionalised, which may yield long-term sustainability of the projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPP) have been widely used as a method for public infrastructure project delivery not only locally and internationally, however the adoption of PPPs in social infrastructure procurement has still been very limited. The objective of this paper is to investigate the potential of implementation of current PPP framework in social affordable housing projects in South East Queensland. Data were collected from 22 interviewees with rich experiences in the industry. The findings of this study show that affordable housing investment have been considered by the industry practitioners as a risky business in comparison to other private rental housing investment. The main determents of the adoption of PPPs in social infrastructure project are the tenant-related factors, such as the inability of paying rent and the inability of caring the property. The study also suggests the importance of seeking strategic partnership with community-based organisation that has experiences in managing similar tenants’ profiles. Current PPP guideline is also viewed as inappropriate for the affordable housing projects, but the principle of VFM framework and risk allocation in PPPs still be applied to the affordable housing projects. This study helps to understand the viability of PPP in social housing procurement projects, and point out the importance of developing guideline for multi-stakeholder partnership and the expansion of the current VFM and PPPs guidelines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Road and highway infrastructure provides the backbone for a nation's economic growth. The versatile dispersion of population in Australia, from sparsely settled communities in remote areas to regenerated inner city suburbs with high density living in metropolitans, calls for continuing development and improvement on roads infrastructure under the current federal government policies and state governments' strategic plans. As road infrastructure projects involve large resources and mechanism, achieving sustainability not only in economic scales but also through environmental and social responsibility becomes a crucial issue. Current efforts are often impeded by different interpretation on sustainability agenda by stakeholders involved in these types of projects. As a result, sustainability deliverables at the project level is not often as transparent and measurable, compared to promises in project briefs and designs. This paper reviews the past studies on sustainable infrastructure construction, focusing on roads and highway projects. Through literature study and consultation with the industry, key sustainability indicators specific to road infrastructure projects have been identified. Based on these findings, this paper introduces an on-going research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, and issues that impact on the gap between sustainability foci and its actual realization at project end level. The exploration helps generate an integrated decision-making model for sustainable road infrastructure projects. The research will promote to the industry more systematic and integrated approaches to decision-making on the implementation of sustainability strategies to achieve deliverable goals throughout the development and delivery process of road infrastructure projects in Australia.