909 resultados para Option prices


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The management of main material prices of provincial highway project quota has problems of lag and blindness. Framework of provincial highway project quota data MIS and main material price data warehouse were established based on WEB firstly. Then concrete processes of provincial highway project main material prices were brought forward based on BP neural network algorithmic. After that standard BP algorithmic, additional momentum modify BP network algorithmic, self-adaptive study speed improved BP network algorithmic were compared in predicting highway project main prices. The result indicated that it is feasible to predict highway main material prices using BP NN, and using self-adaptive study speed improved BP network algorithmic is the relatively best one.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We examine the nature and extent of statutory executive stock option (ESO) disclosures by Australian listed companies over the 2001 to 2004 period, and the influence of corporate governance mechanisms on these disclosures. Our results show a progressive increase in overall compliance from 2001 to 2004. However, despite the improved compliance, the results reveal managements’ continued reluctance to disclose more sensitive ESO information. Factors associated with good internal governance, including board independence, audit committee independence and effectiveness, and compensation committee independence and effectiveness are found to contribute to improved compliance. Similarly, certain external governance factors are associated with improved disclosure, including external auditor quality, shareholder activism (as proxied by companies identified as poor performers by the Australian Shareholders’ Association), and regulatory intervention.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper estimates a simultaneous-equation model of wages and prices for Australia, underpinned by a competing claims framework of imperfect competition. Two separate co-integrating relationships for wages and prices are identified by imposing the economic hypotheses implied by the theory. The steady-state relationships for wages and prices are then embedded in a parsimonious, dynamic wage-price model. The final model is both simple and parsimonious and able to describe the process of wage and price inflation in Australia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

uring periods of market stress, electricity prices can rise dramatically. Electricity retailers cannot pass these extreme prices on to customers because of retail price regulation. Improved prediction of these price spikes therefore is important for risk management. This paper builds a time-varying-probability Markov-switching model of Queensland electricity prices, aimed particularly at forecasting price spikes. Variables capturing demand and weather patterns are used to drive the transition probabilities. Unlike traditional Markov-switching models that assume normality of the prices in each state, the model presented here uses a generalised beta distribution to allow for the skewness in the distribution of electricity prices during high-price episodes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The changing development and population sprawl in major cities, especially those located in high rainfall areas, has resulted in the need to review and re-assess potential flood impacts in these cities. In many cases these new flood lines and flood maps have placed residential property that was previously considered to be flood free to now be considered to be potentially flood liable. Previous research based in Sydney and the UK has identified the fact that residential property that has been subject to flooding has a decreased price and higher investment risk than flood free property in the same location. These studies have also shown that the greatest impact on residential property subject to flooding is just following a flood event. In June 2009, Brisbane City Council released revised flood maps for the Greater Brisbane region and these maps have identified areas that have not previously been considered flood liable. This paper will analyse the sale performance of flood liable streets in the main flood areas of Brisbane over the period January 1990 through to June 2009, to determine the variation in price for these flood liable areas to the residential property immediately adjoining them. The average sale price will be tracked on both a geographic location and socio-economic basis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the massive decline in savings arising from the Global Financial Crisis (GFC), it is timely to review superannuation fund investment and disclosure strategies in the lead-up to the crisis. Accordingly, this study examines differences among superannuation funds’ default investment options in terms of naming and framing over three years from 2005 to 2007, as presented in product disclosure statements (PDSs). The findings indicate that default options are becoming more alike regardless of their name, and consequently, members may face increasing difficulties in distinguishing between balanced and growth-named default options when comparing them across superannuation funds. Comparability is also likely to be constrained by variations in the framing of default options presented in investment option menus in PDSs. These findings highlight the need for standardisation of default option definitions and disclosures to ensure descriptive accuracy, transparency and comparability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Justice Mullins of the Queensland Supreme Court recently considered the status of a put option contained in a registered lease in circumstances where there was an assignment of the reversion. The matter arose for determination in Denham Bros Ltd v W Freestone Leasing Pty Ltd [2002] QSC 307. The decision is of interest as a lease containing a put option, exercisable by a landlord, is perhaps less commonly encountered than a lease containing a call option, exercisable by a tenant.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider the problem of binary classification where the classifier can, for a particular cost, choose not to classify an observation. Just as in the conventional classification problem, minimization of the sample average of the cost is a difficult optimization problem. As an alternative, we propose the optimization of a certain convex loss function φ, analogous to the hinge loss used in support vector machines (SVMs). Its convexity ensures that the sample average of this surrogate loss can be efficiently minimized. We study its statistical properties. We show that minimizing the expected surrogate loss—the φ-risk—also minimizes the risk. We also study the rate at which the φ-risk approaches its minimum value. We show that fast rates are possible when the conditional probability P(Y=1|X) is unlikely to be close to certain critical values.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sourcing appropriate funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. The Australian infrastructure funding policy dilemmas are reflective of similar matters in many countries, particularly the United States of America, where infrastructure cost recovery policies have been in place since the 1970’s. There is an extensive body of both theoretical and empirical literature from these countries that discusses the passing on (to home buyers) of these infrastructure charges, and the corresponding impact on housing prices. The theoretical evidence is consistent in its findings that infrastructure charges are passed on to home buyers by way of higher house prices. The empirical evidence is also consistent in its findings, with “overshifting” of these charges evident in all models since the 1980’s, i.e. $1 infrastructure charge results in greater than $1 increase in house prices. However, despite over a dozen separate studies over two decades in the US on this topic, no empirical works have been carried out in Australia to test if similar shifting or overshifting occurs here. The purpose of this research is to conduct a preliminary analysis of the more recent models used in these US empirical studies in order to identify the key study area selection criteria and success factors. The paper concludes that many of the study area selection criteria are implicit rather than explicit. By collecting data across the models, some implicit criteria become apparent, whilst others remain elusive. This data will inform future research on whether an existing model can be adopted or adapted for use in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article reviews the literature on the outcome of flapless surgery for dental implants in the posterior maxilla. The literature search was carried out in using the keywords: flapless, dental implants and maxilla. A hand search and Medline search were carried out on studies published between 1971 and 2011. The authors included research involving a minimum of 15 dental implants with a followup period of 1 year, an outcome measurement of implant survival, but excluded studies involving multiple simultaneous interventions, and studies with missing data. The Cochrane approach for cohort studies and Oxford Centre for Evidence- Based Medicine were applied. Of the 56 published papers selected, 14 papers on the flapless technique showed high overall implant survival rates. The prospective studies yielded 97.01% (95% CI: 90.72–99.0) while retrospective studies or case series illustrated 95.08% (95% CI: 91.0–97.93) survival. The average of intraoperative complications was 6.55% using the flapless procedure. The limited data obtained showed that flapless surgery in posterior maxilla areas could be a viable and predictable treatment method for implant placement. Flapless surgery tends to be more applicable in this area of the mouth. Further long-term clinical controlled studies are needed.