967 resultados para Nylon cable tie
Resumo:
This paper deals with the coupling of High Power Microwaves with a buried twisted pair cable. The electric field at a distance of 1km from the HPM antenna has been computed and is used for further computation of induced voltage and current. It is found that the peak of the induced current and voltage in a buried unshielded twisted pair cable at a distance of 1km from an HPM antenna of power level 10GW is 20A and 2kV respectively.
Resumo:
<正>目的:血管生成素(angiopoietins)家族,在血管新生过程中扮演重要角色。这一家族的所有成员通过作用于内皮细胞表面的酪氨酸激酶受体Tie-1或Tie-2发挥作用,对形成正常、稳定、成熟的脉管系统非常重要。Ang/Tie系统在肿瘤和胚胎血管新生过程中的作用已得到广泛研究,但在有着相似的血管新生病理过程的动脉粥样硬化病变中的作用研究甚少。本研究的目的:(1)对
Resumo:
The Tie-2 receptor has been shown to play a role in angiogenesis in atherosclerosis. The conventional method assaying the level of soluble Tie-2 (sTie-2) was ELISA. However, this method has some disadvantages. The aims of this research are to establish a more simple detection method, the optical protein-chip based on imaging ellipsomtry (OPC-IE) applying to Tie-2 assay. The sTie-2 biosensor surface on silicon wafer was prepared first, and then serum levels of sTie-2 in 38 patients with AMI were measured on admission (day 1), day 2, day 3 and day 7 after onset of chest pain and 41 healthy controls by ELISA and OPC-IE in parallel. Median level of sTie-2 increased significantly in the AMI patients when compared with the controls. Statistics showed there was a significant correlation in sTie-2 results between the two methods (r=0.923, P0.01). The result of this study showed that the level of sTie-2 increased in AMI, and OPC-IE assay was a fast, reliable, and convenient technique to measure sTie-2 in serum.
Resumo:
[ES]El objetivo del presente proyecto es el de diseñar, construir y verificar la validez de un sistema de medida de posición mediante sensores por cable para un mecanismo de cinemática paralela 5R, extensible a cualquier otro mecanismo espacial o planar. En el presente informe el lector encontrará un análisis exhaustivo de los inconvenientes prácticos derivados de la naturaleza del método de monitorización propuesto, el desarrollo completo del modelo matemático obtenido para solventarlos, descripciones y planos sobre el montaje in situ del sistema de medida, resultados empíricos sobre el manipulador paralelo y posibles riesgos para la consecución del proyecto