986 resultados para Miller, Wayne
Resumo:
Audit report on Wayne County, Iowa for the year ended June 30, 2011
Resumo:
Audit report on Wayne County, Iowa for the year ended June 30, 2012
Resumo:
Audit report on the Wayne-Ringgold-Decatur County Solid Waste Management Commission for the year ended June 30, 2012
Resumo:
Se realiza una revisión taxonómica del género Chamaemelum Miller (Asteraceae) en la Península Ibérica e Islas Baleares. Se proponen dos cambios nomenclaturales: Chamaemelum nobile(L.) All. forma discoideum (Willk.) comb. i stat. nov. y C. fuscatum (Brot.) Vasc. forma minor (Hoffmanns. i Link) comb. i stat. nov. Para cada taxon se da el nombre correcto, así como las correspondientes sinonimias. Se adjunta una clave dicotómica de los táxones reconocidos y una relación de los testimonios de herbario estudiados.
Resumo:
For more than 80 years, visitors to the Iowa State Historical, Memorial, and Art Building were treated to the state’s collection of historic documents, literature, portraits, and historical, geological, and archeological artifacts. Those who visited might have memories of the spectacular sand paintings by Iowan Andrew Clemens, the variety of taxidermy Iowa animals, the pioneer Conestoga wagon in the basement, the biplane hanging from the dome ceiling, the odd display by the medical library of things removed from stomachs, or the Native American display on the third floor. This booklet is a look back at the origins of the museum. It includes some of the Historical Department reports, legislation passed by the general assembly, newspaper and magazine articles, and photographs pertaining to the museum and library. It is not intended to be an exhaustive review and documentation of displays and exhibits. It is a brief overview of the building’s history and some photographs that may bring back memories, for some, of a field trip as a student. This booklet has been created from a variety of source materials: photographs, newspaper articles, and various reports. The following have contributed: State Library of Iowa, Iowa State Historical Society, the Iowa Judicial Branch, Susan Wallace, Helen Dagley, Barb Corson, Jerome Thompson, Pam Rees, Georgiann Fischer, and Jason Mrachina.
Resumo:
Audit report on Wayne County, Iowa for the year ended June 30, 2013
Resumo:
Audit report on the Wayne-Ringgold-Decatur County Solid Waste Management Commission for the year ended June 30, 2013
Resumo:
Audit report on Wayne County, Iowa for the year ended June 30, 2014
Resumo:
Audit report on the Wayne-Ringgold-Decatur County Solid Waste Management Commission for the year ended June 30, 2014
Resumo:
Miller Creek is on the 2006 Section 303d Impaired Waters List and has a 19,926 acre watershed. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to sediment and nutrient delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. In an effort to control these problems, the Miller Creek Water Quality Project will target areas of 5 tons per acre or greater soil loss or with 0.5 tons per acre or greater sediment delivery rates. The assessment revealed these targeted priority lands make up 32% or 6,395 acres of the Miller Creek watershed. Priority lands include cropland, pasture land, timber, and sensitive riparian areas. It is the goal of this project to reduce sediment delivery by 70% on 60% or 3,837 acres of these priority lands. This will be accomplished through installation of strategically placed structural practices, rotational grazing systems, and buffer strips. These practices will reduce soil loss, reduce sediment delivery, improve water quality, and improve wildlife habitat in the watershed. Utilizing partnerships with NRCS and IDALS-DSC will be important in making this project successful. In addition to using matching funds from EQIP, WHIP, and CRP, the Monroe SWCD is committed to prioritizing local cost share funds through IFIP and REAP for use in the Miller Creek Watershed.
Resumo:
Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.