996 resultados para Military engineering
Resumo:
General note: Title and date provided by Bettye Lane.
Resumo:
General note: Title and date provided by Bettye Lane.
Resumo:
Mode of access: Internet.
Resumo:
Vol. 4-8 have imprint: London ; New York : E. & F.N. Spon.
Resumo:
Microfilm. Ann Arbor, Mich., University Microfilms [n.d.] (American culture series, Reel 301.6)
Resumo:
Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.
Resumo:
This paper develops a model for military conflicts where the defending forces have to determine an optimal partitioning of available resources to counter attacks from an adversary in two different fronts. The Lanchester attrition model is used to develop the dynamical equations governing the variation in force strength. Three different allocation schemes - Time-Zero-Allocation (TZA), Allocate-Assess-Reallocate (AAR), and Continuous Constant Allocation (CCA) - are considered and the optimal solutions are obtained in each case. Numerical examples are given to support the analytical results.
Resumo:
This paper develops a model for military conflicts where the defending forces have to determine an optimal partitioning of available resources to counter attacks from an adversary in two different fronts. The Lanchester attrition model is used to develop the dynamical equations governing the variation in force strength. Three different allocation schemes - Time-Zero-Allocation (TZA), Allocate-Assess-Reallocate (AAR), and Continuous Constant Allocation (CCA) - are considered and the optimal solutions are obtained in each case. Numerical examples are given to support the analytical results.
Resumo:
A resource interaction based game theoretical model for military conflicts is presented in this paper. The model includes both the spatial decision capability of adversaries (decision regarding movement and subsequent distribution of resources) as well as their temporal decision capability (decision regarding level of allocation of resources for conflict with adversary’s resources). Attrition is decided at present by simple deterministic models. An additional feature of this model is the inclusion of the possibility of a given resource interacting with several resources of the adversary.The decisions of the adversaries is determined by solving for the equilibrium Nash strategies given that the objectives of the adversaries may not be in direct conflict. Examples are given to show the applicability of these models and solution concepts.
Resumo:
This document introduces the main concepts of Collaborative Engineering as a new methodology, procedures and tools to design and develop an aircraft, as Airbus Military is implementing. Airbus designs and industrializes aircrafts under Concurrent Engineering techniques since decades with success. The introduction of new PLM methodologies, procedures and tools, mainly in the industrialization areas, and the need to reduce time-to-market conducted Airbus Military to push the engineering teams to do things in a different way. Traditional Engineering works sequentially, Concurrent Engineering basically overlaps tasks between teams using maturity states and taking assuming risks. Collaborative Engineering promotes a single team to develop product, processes and resources from the conceptual phase to the start of the serial production. The deliverable of the team is an iDMU (industrial DMU), a complete definition and verification of the virtual manufacturing of the product.
Resumo:
Airbus designs and industrializes aircrafts using Concurrent Engineering techniques since decades. The introduction of new PLM methods, procedures and tools, and the need to reduce time-to-market, led Airbus Military to pursue new working methods. Traditional Engineering works sequentially. Concurrent Engineering basically overlaps tasks between teams. Collaborative Engineering promotes teamwork to develop product, processes and resources from the conceptual phase to the start of the serial production. The CALIPSO-neo pilot project was launched to support the industrialization process of a medium size aerostructure. The aim is to implement the industrial Digital Mock-Up (iDMU) concept and its exploitation to create shop floor documentation. In a framework of a collaborative engineering strategy, the project is part of the efforts to deploy Digital Manufacturing as a key technology for the industrialization of aircraft assembly lines. This paper presents the context, the conceptual approach and the methodology adopted.
Resumo:
"May 1966."
Resumo:
Mode of access: Internet.