997 resultados para Marshall (Mich.)
Resumo:
Référence bibliographique : Rol, 57056
Resumo:
County Audit Report
Resumo:
County Profile
Resumo:
Larvae, pupae and adults of the piazurine weevil Pseudopiazurus papayanus (Marshall, 1922) are associated with Carica papaya Linnaeus,1753 (Caricaceae). The larval and pupal stages are described and illustrated. The sexual differences in the last abdominal segments of the pupae are also illustrated.
Resumo:
Report on a special investigation of the West Marshall Community School District for the period January 1, 2001 through June 30, 2007
Resumo:
Parasitizing behavior of Cervellus piranga Penteado-Dias (Hymenoptera, Braconidae, Braconinae) on papaya borer weevil Pseudopiazurus obesus Marshall (Coleoptera, Curculionidae). The papaya borer weevil Pseudopiazurus obesus is a pest associated with papaya crops in Brazil and Cervellus piranga is a naturally-occurring parasitoid which may contribute to regulate populations of this pest. We aimed at describing the parasitizing behavior of the parasitoid C. piranga on papaya borer weevil P. obesus larvae under field conditions. The sequence of events related to the parasitizing behavior of C. piranga is similar to other braconid species and includes the location and recognition of the attacked host plant followed by walks on the host plant and touching it with the tip of the antennae and the ovipositor. In the following event, the parasitoid assesses the suitability of the host by speeding up antennae and ovipositor movements. After locating and accepting the host, the parasitoid remains inactive on oviposition aperture sites and starts moving the antennae. Afterwards, the parasitoid inserts its ovipositor and starts cleaning it repeatedly. The female of C. piranga inserts the ovipositor through the hole and lay one egg into the papaya weevil borer. After oviposition, the female cleans continuously both ovipositor and antennae before leaving to forage for a new host.
Resumo:
The Iowa D.O.T. specifications do not require 100 percent of 50 blow Marshall density (generally 94%) for field compaction. However, stabilities are determined in the Laboratory on specimens compacted to 100 percent of Marshall density. The purpose of this study is to determine the stabilities of specimens compacted to various densities which are below 100 percent of the 50 blow Marshall density.
Resumo:
It has been observed in the Laboratory that an increase in oven heating time of relatively short duration between mixing and compaction of asphaltic concrete hot mixes can have an effect on the Marshall stability results obtained. The purpose of this short investigation is to determine the effect of oven heating time on the density and stability of hot mixes.
Resumo:
Collection : Actualités scientifiques et industrielles ; 604, 8
Effect of Delay in Testing Asphalt Concrete Specimens for Marshall Stability, MLR-86-08, Draft, 1986
Resumo:
The Central Laboratory has been delaying the mix design testing of 2 1/2" X 4" Marshall specimens for stability, until the next day after molding. For example, if the mixes are made and samples molded on Friday a man would have to come in and work on Saturday to test these specimens. The reason for this is that the ASTM-01559 "Resistance to Plastic Flow of Bituminous Mixes Using Marshall Apparatus," states that "the specimens after being molded shall be carefully transferred to a smooth, flat surface and allowed to stand overnight at room temperature, before being weighed, measured and tested." The AASHTO procedure, AASHTO Designation T-245-82 "Resistance to Plastic Flow of Bituminous Mixtures using Marshall Apparatus," does not say when the specimens shall be tested for stability. The IDOT Lab. Specifications, Test Method No. Iowa 502-8 and test method No. Iowa 506-C "compacting asphaltic concrete by the Marshall Method" and "Resistance to Plastic Flow of Bituminous Mixtures Using the Marshall Apparatus," respectively, only state that the specimens shall be cooled before testing. Due to the above conflict in specifications, a number of mix samples were tested, in the Central Lab, for stability on different days. This should furnish enough information to allow us to change the procedure and to test for stability the same day molded, or be able to delay the testing for 3 days or more.