956 resultados para Mackinac Bridge Authority (Mich.)
Resumo:
verso: Dec.1902 making test with Murray Car carrying rural mail on Route #1 out of Adrian. WC Moran carrier Will Blain driver. One week on each route by Authority of P.O. Dept. Snow & bad roads all month. This picture printed in Auto edition of Adrian Telegram Mar 31 1923.
Resumo:
Collapsed Aug 6, '09
Resumo:
The other escaping prisoners were L. B. Smith, 4th Mich. cav.; W. Siutherland, 16th U. S. inf.; W. C. Trippe, 16th U. S. inf.; J. F. Wood, 26th Ohio inf.; R. G. Taylor, 2d Mass. cav.
Resumo:
"Old Mission Church of Mackinac Island"--Cover.
Resumo:
Bridges are a critical part of North America’s transportation network that need to be assessed frequently to inform bridge management decision making. Visual inspections are usually implemented for this purpose, during which inspectors must observe and report any excess displacements or vibrations. Unfortunately, these visual inspections are subjective and often highly variable and so a monitoring technology that can provide quantitative measurements to supplement inspections is needed. Digital Image Correlation (DIC) is a novel monitoring technology that uses digital images to measure displacement fields without any contact with the bridge. In this research, DIC and accelerometers were used to investigate the dynamic response of a railway bridge reported to experience large lateral displacements. Displacements were estimated using accelerometer measurements and were compared to DIC measurements. It was shown that accelerometers can provide reasonable estimates of displacement for zero-mean lateral displacements. By comparing measurements in the girder and in the piers, it was shown that for the bridge monitored, the large lateral displacements originated in the steel casting bearings positioned above the piers, and not in the piers themselves. The use of DIC for evaluating the effectiveness of rehabilitation of the LaSalle Causeway lift bridge in Kingston, Ontario was also investigated. Vertical displacements were measured at midspan and at the lifting end of the bridge during a static test and under dynamic live loading. The bridge displacements were well within the operating limits, however a gap at the lifting end of the bridge was identified. Rehabilitation of the bridge was conducted and by comparing measurements before and after rehabilitation, it was shown that the gap was successfully closed. Finally, DIC was used to monitor the midspan vertical and lateral displacements in a monitoring campaign of five steel rail bridges. DIC was also used to evaluate the effectiveness of structural rehabilitation of the lateral bracing of a bridge. Simple finite element models are developed using DIC measurements of displacement. Several lessons learned throughout this monitoring campaign are discussed in the hope of aiding future researchers.
Resumo:
Bidirectional DC-DC converters are widely used in different applications such as energy storage systems, Electric Vehicles (EVs), UPS, etc. In particular, future EVs require bidirectional power flow in order to integrate energy storage units into smart grids. These bidirectional power converters provide Grid to Vehicle (V2G)/ Vehicle to Grid (G2V) power flow capability for future EVs. Generally, there are two control loops used for bidirectional DC-DC converters: The inner current loop and The outer loop. The control of DAB converters used in EVs are proved to be challenging due to the wide range of operating conditions and non-linear behavior of the converter. In this thesis, the precise mathematical model of the converter is derived and non-linear control schemes are proposed for the control system of bidirectional DC-DC converters based on the derived model. The proposed inner current control technique is developed based on a novel Geometric-Sequence Control (GSC) approach. The proposed control technique offers significantly improved performance as compared to one for conventional control approaches. The proposed technique utilizes a simple control algorithm which saves on the computational resources. Therefore, it has higher reliability, which is essential in this application. Although, the proposed control technique is based on the mathematical model of the converter, its robustness against parameter uncertainties is proven. Three different control modes for charging the traction batteries in EVs are investigated in this thesis: the voltage mode control, the current mode control, and the power mode control. The outer loop control is determined by each of the three control modes. The structure of the outer control loop provides the current reference for the inner current loop. Comprehensive computer simulations have been conducted in order to evaluate the performance of the proposed control methods. In addition, the proposed control have been verified on a 3.3 kW experimental prototype. Simulation and experimental results show the superior performance of the proposed control techniques over the conventional ones.
Resumo:
As a part of vital infrastructure and transportation networks, bridge structures must function safely at all times. However, due to heavier and faster moving vehicular loads and function adjustment, such as Busway accommodation, many bridges are now operating at an overload beyond their design capacity. Additionally, the huge renovation and replacement costs always make the infrastructure owners difficult to undertake. Structural health monitoring (SHM) is set to assess condition and foresee probable failures of designated bridge(s), so as to monitor the structural health of the bridges. The SHM systems proposed recently are incorporated with Vibration-Based Damage Detection (VBDD) techniques, Statistical Methods and Signal processing techniques and have been regarded as efficient and economical ways to solve the problem. The recent development in damage detection and condition assessment techniques based on VBDD and statistical methods are reviewed. The VBDD methods based on changes in natural frequencies, curvature/strain modes, modal strain energy (MSE) dynamic flexibility, artificial neural networks (ANN) before and after damage and other signal processing methods like Wavelet techniques and empirical mode decomposition (EMD) / Hilbert spectrum methods are discussed here.
Resumo:
This paper uses dynamic computer simulation techniques to apply a procedure using vibration-based methods for damage assessment in multiple-girder composite bridge. In addition to changes in natural frequencies, this multi-criteria procedure incorporates two methods, namely the modal flexibility and the modal strain energy method. Using the numerically simulated modal data obtained through finite element analysis software, algorithms based on modal flexibility and modal strain energy change before and after damage are obtained and used as the indices for the assessment of structural health state. The feasibility and capability of the approach is demonstrated through numerical studies of proposed structure with six damage scenarios. It is concluded that the modal strain energy method is competent for application on multiple-girder composite bridge, as evidenced through the example treated in this paper.
Resumo:
This report presents a summary of the research conducted by the research team of the CRC project 2002-005-C, “Decision support tools for concrete infrastructure rehabilitation”. The project scope, objectives, significance and innovation and the research methodology is outlined in the introduction, which is followed by five chapters covering different aspects of the research completed. Major findings of a review of literature conducted covering both use of fibre reinforced polymer composites in rehabilitation of concrete bridge structures and decision support frameworks in civil infrastructure asset management is presented in chapter two. Case study of development of a strengthening scheme for the “Tenthill Creek bridge” is covered in the third chapter, which summarises the capacity assessment, traditional strengthening solution and the innovative solution using FRP composites. The fourth chapter presents the methodology for development of a user guide covering selection of materials, design and application of FRP in strengthening of concrete structures, which were demonstrated using design examples. Fifth chapter presents the methodology developed for evaluating whole of life cycle costing of treatment options for concrete bridge structures. The decision support software tool developed to compare different treatment options based on reliability based whole of life cycle costing will be briefly described in this chapter as well. The report concludes with a summary of findings and recommendations for future research.
Resumo:
This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.