997 resultados para Industrial priorities


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a vision-based method of vehicle localisation that has been developed and tested on a large forklift type robotic vehicle which operates in a mainly outdoor industrial setting. The localiser uses a sparse 3D edgemap of the environment and a particle filter to estimate the pose of the vehicle. The vehicle operates in dynamic and non-uniform outdoor lighting conditions, an issue that is addressed by using knowledge of the scene to intelligently adjust the camera exposure and hence improve the quality of the information in the image. Results from the industrial vehicle are shown and compared to another laser-based localiser which acts as a ground truth. An improved likelihood metric, using peredge calculation, is presented and has shown to be 40% more accurate in estimating rotation. Visual localization results from the vehicle driving an arbitrary 1.5km path during a bright sunny period show an average position error of 0.44m and rotation error of 0.62deg.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This collaborative event was organised to coincide with International celebrations by the International Council of Societies of Industrial Design (ICSID). The panel discussion involved industrial designers from a variety of backgrounds including academics, theorists and practitioners. Each panel member was given time to voice their opinion surrounding the theme of WIDD2010 "Industrial Design: Humane Solutions for a Resilient World". The discussion was then extended to the audience through active question and answer time. The panel included: * Professor Vesna Popovic FDIA - Queensland University of Technology * Adam Doyle, Studio Manager - Infinity Design Development * Scott Cox MDIA, Creative Director - Formwerx * Alexander Lotersztain, Director - Derlot * Philip Whiting FDIA, Design Convenor - QCA * Professor Tony Fry, Director Team D/E/S & QCA After this, the documentary by Gary Hewtsit "Objectified" was then screened (75 min).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this paper is to advance understandings of the processes of cluster-building and evolution, or transformative and adaptive change, through the conscious design and reflective activities of private and public actors. A model of transformation is developed which illustrates the importance of actors becoming exposed to new ideas and visions for industrial change by political entrepreneurs and external networks. Further, actors must be guided in their decision-making and action by the new vision, and this requires that they are persuaded of its viability through the provision of test cases and supportive resources and institutions. In order for new ideas to become guiding models, actors must be convinced of their desirability through the portrayal of models as a means of confronting competitive challenges and serving the economic interests of the city/region. Subsequent adaptive change is iterative and reflexive, involving a process of strategic learning amongst key industrial and political actors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Throughout history, developments in medicine have aimed to improve patient quality of life, and reduce the trauma associated with surgical treatment. Surgical access to internal organs and bodily structures has been traditionally via large incisions. Endoscopic surgery presents a technique for surgical access via small (1 Omm) incisions by utilising a scope and camera for visualisation of the operative site. Endoscopy presents enormous benefits for patients in terms of lower post operative discomfort, and reduced recovery and hospitalisation time. Since the first gall bladder extraction operation was performed in France in 1987, endoscopic surgery has been embraced by the international medical community. With the adoption of the new technique, new problems never previously encountered in open surgery, were revealed. One such problem is that the removal of large tissue specimens and organs is restricted by the small incision size. Instruments have been developed to address this problem however none of the devices provide a totally satisfactory solution. They have a number of critical weaknesses: -The size of the access incision has to be enlarged, thereby compromising the entire endoscopic approach to surgery. - The physical quality of the specimen extracted is very poor and is not suitable to conduct the necessary post operative pathological examinations. -The safety of both the patient and the physician is jeopardised. The problem of tissue and organ extraction at endoscopy is investigated and addressed. In addition to background information covering endoscopic surgery, this thesis describes the entire approach to the design problem, and the steps taken before arriving at the final solution. This thesis contributes to the body of knowledge associated with the development of endoscopic surgical instruments. A new product capable of extracting large tissue specimens and organs in endoscopy is the final outcome of the research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis provides a behavioural perspective to the problem of collusive tendering in the construction market by examining the decision making factors of individuals potentially involved in such agreements using marketing ethics theory and techniques. The findings of a cross disciplinary literature review were synthesised into a model of factors theoretically expected to determine the individual's behavioural intent towards a set of collusive tendering agreements and the means of reaching them. The factors were grouped as internal cognitive (the individuals' value systems) and affective (demographic and psychographic characteristics) as well as external environmental (legal, industrial and organisational codes and norms) and situational (company, market and economic conditions). The model was tested using empirical data collected through a questionnaire survey of estimators employed in the largest Australian construction firms. All forms of explicit collusive tendering agreements were considered as having a prohibitive moral content by the majority of respondents who also clearly differentiated between agreements and discussions of contract terms (which they found to be a moral concern but not prohibitive) or of prices. The comparisons between those of the respondents that would never participate in a collusive agreement and the potential offenders clearly showed two distinctly different groups. The law abiding estimators are less reliant on situational factors, happier and more comfortable in their work environments and they live according to personal value and belief systems. The potential offenders on the other hand are mistrustful of colleagues, feel their values are not respected, put company priorities above principles and none of them is religious or a member of a professional body. The research results indicate that Australian estimators are, overall law abiding and principled and accept the existing codification of collusion as morally defensible and binding. Professional bodies' and organisational codes of conduct as well as personal value and belief systems that guide one's own conduct appear to be deterrents to collusive tendering intent and so are moral comfort and work satisfaction. These observations are potential indicators of areas where intervention and behaviour modification can increase individuals' resistance to collusion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research investigated the impact of Education Queensland's employment policy and practices for beginning secondary teachers appointed on temporary engagement. The context was the public secondary school sector within the state of Queensland, Australia. The study was set within a context of the changing nature of work from full-time permanent employment towards casual, fixed-term contracts, temporary and part-time employment, a trend reflected in the employment patterns for teachers within Australia. Two broad categories of literature relating to the research problem of this thesis were reviewed, namely the beginning teacher and permanency or tenure. The focus in the research literature on beginning teachers was the professional experiences of teachers within the classroom and school. There was a paucity of research that considered the working and industrial conditions of temporary employment for beginning teachers or the personal and professional implications of this form of employment. The review of the context and literature was conceptualised as a Beginning Temporary Teacher Theoretical Framework which served to inform the study. Using a qualitative case study methodology, the research techniques employed for the thesis were semi-structured interview and document analysis. A simultaneously conducted research project in which the researcher participated entitled 'Winning the Lottery? Beginning Teachers on Temporary Engagement' foregrounded this thesis in terms of refining the research question, contributing to the literature and in the selection of the participants. For this case study the perspectives of four distinct yet inter-related categories of professionals were sought. These included four beginning secondary teachers, three school administrators, a Senior Personnel Officer with Education Queensland, and a representative from the Queensland Teachers' Union. The research findings indicated that none of the beginning teachers or other professionals viewed starting a career in teaching on temporary engagement as the ideal. The negative features identified were the differential treatment received and the high level of uncertainty associated with temporary employment. Differential treatment tended to indicate 'less' entitlements, in terms of access to induction and professional development, recreational and sick leave, acceptance by and expectations of other colleagues, and avenues of redress in grievance cases. Moreover, interviews indicated a high level of uncertainty in terms of starting within the teaching profession, commencing at a new school, and a regular income. In addition, frequent changes in schools and/or cohorts of students exacerbated levels of uncertainty. The beginning teachers reported significantly decreased motivation, self-esteem and sense of belonging, and increased stress levels. There was an even more marked negative impact on those beginning teachers who had experienced a higher number of temporary engagements and schools in their first year of teaching. Conversely, strong staff support and a reasonable length of time in the one school improved the quality of the beginning teachers' experiences. The overall impact of being on temporary engagement resulted in delayed permanent position appointments, decreased commitment to particular schools and to Education Queensland as the employing authority, and for two of the beginning teachers, it produced a desire to seek alternative employment. The implementation of Education Queensland's policies relating to working conditions and entitlements for these temporary beginning teachers at the school level was revealed to be less than satisfactory. There was a tendency towards 'just-in- time' management of the beginning teacher on temporary engagement. The beginning teachers received 'less-than-messages' about access to and use of departmental documentation, support through induction and professional development, and their transition from temporary to permanent employment. To ensure a more systematic, supportive and inclusive process for managing the temporary beginning teacher, a conceptual framework entitled 'Continuums of Tension' was developed. The four continuums included permanent employment - temporary employment; system perspective - individual perspective; teaching as a profession - teaching as a job; and the permanent beginning teacher - university graduate. The general principles of the human resource policies of Education Queensland were based on a commitment to permanent employment, a system's perspective, viewing teaching as a profession and a homogeneous group of permanent beginning teachers. Contrasting with this, the beginning teacher on temporary engagement tended to operate from the position of temporary employment and a perspective that was individually based. Their priorities therefore included the 'occupational' aspects of being a temporary teacher striving to become permanent. Thus there existed a tension or contradiction between the general principles of human resource policies within Education Queensland and the employment experiences of beginning teachers on temporary engagement. The study proposed three actions for resolution to address the aforementioned tensions. The actions included: (a) the effective provision and targeted communication of information; (b) support, induction and professional development; and (c) a coordinated approach between Education Queensland, Queensland Teachers' Union, the Universities and the beginning teacher. These actions are fm1her refined to include: (a) an induction kit to suppm1 the individual through the pre-employment to permanent employee phases, (b) an extrapolation of the roles and responsibilities of Education Queensland personnel charged with supporting the beginning temporary teacher, and (c) a series of recommendations to effect a coordinated approach amongst the key stakeholders. The theoretical and conceptual frameworks have provided a means of addressing the identified needs of the beginning teacher on temporary engagement. As such, this study has contributed to the research literature on teacher employment and professionalism and aims to provide a beginning temporary teacher with managed professional and occupational support.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The numerical modelling of electromagnetic waves has been the focus of many research areas in the past. Some specific applications of electromagnetic wave scattering are in the fields of Microwave Heating and Radar Communication Systems. The equations that govern the fundamental behaviour of electromagnetic wave propagation in waveguides and cavities are the Maxwell's equations. In the literature, a number of methods have been employed to solve these equations. Of these methods, the classical Finite-Difference Time-Domain scheme, which uses a staggered time and space discretisation, is the most well known and widely used. However, it is complicated to implement this method on an irregular computational domain using an unstructured mesh. In this work, a coupled method is introduced for the solution of Maxwell's equations. It is proposed that the free-space component of the solution is computed in the time domain, whilst the load is resolved using the frequency dependent electric field Helmholtz equation. This methodology results in a timefrequency domain hybrid scheme. For the Helmholtz equation, boundary conditions are generated from the time dependent free-space solutions. The boundary information is mapped into the frequency domain using the Discrete Fourier Transform. The solution for the electric field components is obtained by solving a sparse-complex system of linear equations. The hybrid method has been tested for both waveguide and cavity configurations. Numerical tests performed on waveguides and cavities for inhomogeneous lossy materials highlight the accuracy and computational efficiency of the newly proposed hybrid computational electromagnetic strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lean project management is the comprehensive adaption of other lean concept like lean construction, lean manufacturing and lean thinking into project management context. Execution of many similar industrial projects creates the idea of lean project management in companies and rapidly growing in industries. This paper offers the standardization method in order to achieve Lean project management in large scale industrial project. Standardization refers to all activity which makes two projects most identical and unify to each other like standardization of design, reducing output variability, value analysis and strategic management. Although standard project may have minor effi ciency decrease, compare to custom built project; but great advantage of standard project like cost saving, time reduction and quality improvement justify standardization methodology. This paper based on empirical experience in industrial project and theoretical analysis of benefi ts of project standardization.