877 resultados para Incomplete contract
Resumo:
This case book contains the essential sections of the most significant cases in Australian contract law. Ready access to this collection of cases enables students to experience the law through the judges’ own words, and to develop the skills of interpreting and analysing cases in order to refine their understanding of the law. Excerpts from important statutes and writings are also included.
Resumo:
The significance of the proposed name of a building to buyers of units off the plan has received recent attention in Queensland and the ACT with differing results. In Gough v South Sky Investments Pty Ltd the Queensland Court of Appeal concluded that the name of the building was not an essential term of the contract and rejected a claim by a number of buyers to terminate their contracts because of the change of name from Oracle to Peppers. In contrast, Rares J in the Federal Court decision of Madison Constructions Pty Ltd v Empire Building Group (ACT) Pty Ltd considered that the name of the building in a proposed development could potentially form the basis of misleading conduct about the association of the seller with a particular development corporation.
Resumo:
The aftermath of the Queensland floods of January 2011 continues to be played out in the courts. The effect of the floods on such a large scale has awakened the use of some statutory provisions that have not previously been litigated .Section 64 of the Property Law Act 1974 (Qld) is such a section. A version of this provision appears as s 34 of the Sale of Land Act 1982 (Vic). Broadly speaking, these sections permit a buyer of a dwelling house which has been damaged or destroyed between contract and completion to rescind the contract and recover their deposit provided that the rescission notice is given prior to "the date of completion or possession". The Court of Appeal decision of Dunworth v Mirvac Queensland Pty Ltd [2011] QCA 200 appears to be the first litigation upon the application of the section since it came into force in 1975.
Resumo:
Feedback, both formative and summative, enables students to reflect on their understandings and to restructure their thinking to develop their capabilities. It can also encourage positive motivation and help boost self-esteem. Online multiple choice questions can be an efficient and effective means of providing timely formative feedback. At the same time, locating learning in a narrative environment can facilitate engaging and effective learning experiences. Narratives can help learners to navigate through information and support cognitive and imaginative engagement. This article will discuss The 00 Files, an online suite of modules containing multiple choice questions situated in the narrative of a fictional law firm. It notes student responses to the program and discusses lessons that may be learnt from its development which may be of assistance to academics considering the development of similar programs for their courses.
Resumo:
This paper describes an empirical study to test the proposition that all construction contract bidders are homogeneous ie. they can be treated as behaving collectively in an identical (statistical) manner. Examination of previous analyses of bidding data reveals a flaw in the method of standardising bids across different size contracts and a new procedure is proposed which involves the estimation of a contract datum. Three independent sets of bidding data were then subjected to this procedure and estimates of the necessary distributional parameters obtained. These were then tested against the bidder homogeneity assumption resulting in the conclusion that the assumption may be appropriate for a three parameter log-normal shape, but not for scale and location.
Resumo:
Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.
Resumo:
The reliability analysis is crucial to reducing unexpected down time, severe failures and ever tightened maintenance budget of engineering assets. Hazard based reliability methods are of particular interest as hazard reflects the current health status of engineering assets and their imminent failure risks. Most existing hazard models were constructed using the statistical methods. However, these methods were established largely based on two assumptions: one is the assumption of baseline failure distributions being accurate to the population concerned and the other is the assumption of effects of covariates on hazards. These two assumptions may be difficult to achieve and therefore compromise the effectiveness of hazard models in the application. To address this issue, a non-linear hazard modelling approach is developed in this research using neural networks (NNs), resulting in neural network hazard models (NNHMs), to deal with limitations due to the two assumptions for statistical models. With the success of failure prevention effort, less failure history becomes available for reliability analysis. Involving condition data or covariates is a natural solution to this challenge. A critical issue for involving covariates in reliability analysis is that complete and consistent covariate data are often unavailable in reality due to inconsistent measuring frequencies of multiple covariates, sensor failure, and sparse intrusive measurements. This problem has not been studied adequately in current reliability applications. This research thus investigates such incomplete covariates problem in reliability analysis. Typical approaches to handling incomplete covariates have been studied to investigate their performance and effects on the reliability analysis results. Since these existing approaches could underestimate the variance in regressions and introduce extra uncertainties to reliability analysis, the developed NNHMs are extended to include handling incomplete covariates as an integral part. The extended versions of NNHMs have been validated using simulated bearing data and real data from a liquefied natural gas pump. The results demonstrate the new approach outperforms the typical incomplete covariates handling approaches. Another problem in reliability analysis is that future covariates of engineering assets are generally unavailable. In existing practices for multi-step reliability analysis, historical covariates were used to estimate the future covariates. Covariates of engineering assets, however, are often subject to substantial fluctuation due to the influence of both engineering degradation and changes in environmental settings. The commonly used covariate extrapolation methods thus would not be suitable because of the error accumulation and uncertainty propagation. To overcome this difficulty, instead of directly extrapolating covariate values, projection of covariate states is conducted in this research. The estimated covariate states and unknown covariate values in future running steps of assets constitute an incomplete covariate set which is then analysed by the extended NNHMs. A new assessment function is also proposed to evaluate risks of underestimated and overestimated reliability analysis results. A case study using field data from a paper and pulp mill has been conducted and it demonstrates that this new multi-step reliability analysis procedure is able to generate more accurate analysis results.
Resumo:
Construction contracts often provide that the decision of an independent certifier is final and binding. The effect of a contractual term like this has been debated in the courts over time. This paper considers the binding nature of certificates in the context of traditional construction contract arrangements and also considers the implications for more complex contracts like those entered into to facilitate public private partnerships. This article considers the response of the courts and the drafting implications and argues that a different focus would be advantageous.
Resumo:
Construction contracts often provide that decisions under the contract will be made by a certifier. This paper reviews the liability issues when a certifier makes a mistake. We do that in light of recent pronouncements by the High Court of Australia and the New South Wales Court of Appeal on negligence. We look at this question in the context of traditional construction contract arrangements and also consider the implications for Public Private Partnerships and the typical contract arrangements entered into to facilitate these transactions.
Resumo:
This paper presents the findings from a conversation between an Aboriginal educator and a non-Indigenous pre-service educator about the importance and complexities of building productive partnerships. Although the participants focused on the challenges and benefits of building relationships between Aboriginal and Torres Strait Islander educators and non-Indigenous educators in Australian early years settings, the more significant outcome of the meeting was the personal connection two young women were able to make when a friendship began to develop. The project was intended to enable an opportunity for the participants ‘to engage in reflexivity on their pedagogic work’, something Mills (2012) understands as crucial to the support of social justice and transformation in the classroom.
Resumo:
This project was a step forward in developing a 'descriptive theory' of contracting in the oil and gas industry that reflects the operating environment in which the project manager operates. This study investigates the existing processes and methods used in establishing contracts which are very often prescriptive, and not always appropriate or optimal for a given situation. This study contributes to contracting effectiveness or optimal contracting in the oil and gas industry.
Resumo:
The type of contract model may have a significant influence on achieving project objectives, including environmental and climate change goals. This research investigates non-standard contract models impacting greenhouse gas emissions (GHG) in transport infrastructure construction in Australia. The research is based on the analysis of two case studies: an Early Contractor Involvement (ECI) contract and a Design and Construct (D&C) contract with GHG reduction requirements embedded in the contractor selection. Main findings support the use of ECIs for better integrating decisions made during the planning phase with the construction activities, and improve environmental outcomes while achieving financial and time savings. Key words: greenhouse gases reduction; road construction; contracting; ECI; D&C
Resumo:
Commonwealth legislation covering insurance contracts contains numerous provisions designed to control the operation and effect of terms in life and general insurance contracts. For example, the Life Insurance Act 1995 (Cth) contains provisions regulating the consequences attendant upon incorrect statements in proposals [1] and non-payment of premiums, [2] provides that an insurer may only exclude liability in the case of suicide if it has made express provision for such contingency in its policy, [3] and severely restricts the efficacy of conditions as to war risks. [4] The Insurance Contracts Act 1984 (Cth) is even more intrusive and has a major impact upon contractual provisions in the general insurance field. It is beyond the scope of this note to explore all of these provisions in any detail but examples of controls and constraints imposed upon the operation and effect of contractual provisions include the following. A party is precluded from relying upon a provision in a contract of insurance if such reliance would amount to a failure to act with the utmost good faith. [5] Similarly, a policy provision which requires differences or disputes arising out of the insurance to be submitted to arbitration is void, [6] unless the insurance is a genuine cover for excess of loss over and above another specified insurance. [7] Similarly clause such as conciliation clauses, [8] average clauses, [9] and unusual terms [10] are given qualified operation. [11] However the provision in the Insurance Contracts Act that has the greatest impact upon, and application to, a wide range of insurance clauses and claims is s 54. This section has already generated a significant volume of case law and is the focus of this note. In particular this note examines two recent cases. The first, Johnson v Triple C Furniture and Electrical Pty Ltd [2012] 2 Qd R 337, (hereafter the Triple C case), is a decision of the Queensland Court of Appeal; and the second, Matthew Maxwell v Highway Hauliers Pty Ltd [2013] WASCA 115, (hereafter the Highway Hauliers case), is a decision of the Court of Appeal in Western Australia. This latter decision is on appeal to the High Court of Australia. The note considers too the decision of the New South Wales Court of Appeal in Prepaid Services Pty Ltd v Atradius Credit Insurance NV [2013] NSWCA 252 (hereafter the Prepaid Services case).These cases serve to highlight the complex nature of s 54 and its application, as well as the difficulty in achieving a balance between an insurer and an insured's reasonable expectations.
Resumo:
This article discusses the design of interactive online activities that introduce problem solving skills to first year law students. They are structured around the narrative framework of ‘Ruby’s Music Festival’ where a young business entrepreneur encounters various issues when organising a music festival and students use a generic problem solving method to provide legal solutions. These online activities offer students the opportunity to obtain early formative feedback on their legal problem solving abilities prior to undertaking a later summative assessment task. The design of the activities around the Ruby narrative framework and the benefits of providing students with early formative feedback will be discussed.