993 resultados para ITEM PARAMETERS
Resumo:
Lake sturgeon Acipenser fulvescens restoration is a priority throughout the Great Lakes basin, where sturgeon have been reduced to less than 1% of historic levels due to habitat degradation, overharvest, and fragmentation of spawning populations. The population parameters most important to long-term lake sturgeon persistence are unknown.
Resumo:
Experiments were conducted investigating the interaction between a normal shock wave and a corner boundary layer in a constant area rectangular duct. Active corner suction and passive blowing were applied to manipulate the natural corner flows developing in the working section of the Cambridge University supersonic wind tunnel. In addition robust vane micro-vortex generators were applied to the corners of the working section. Experiments were conducted at Mach numbers of M∞=1.4 and 1.5. Flow visualisation was carried out through schlieren and surface oil flow, while static pressures were recorded via floor tappings. The results indicate that an interplay occurs between the corner flow and the centre line flow. It is believed that corner flow separation acts to induce a shock bifurcation, which in turn leads to a smearing of the adverse pressure gradient elsewhere. In addition the blockage effect from the corners was seen to result in a reacceleration of the subsonic post-shock flow. As a result manipulation of the corner regions allows a separated or attached centre line flow to be observed at the same Mach number. Copyright © 2010 by Babinsky, Burton, Bruce.
Resumo:
This paper presents experimental results that aimed to investigate the effects of soil liquefaction on the modal parameters (i.e. frequency and damping ratio) of pile-supported structures. The tests were carried out using the shaking table facility of the Bristol Laboratory for Advanced Dynamics Engineering (BLADE) at the University of Bristol (UK) whereby four pile-supported structures (two single piles and two pile groups) with and without superstructure mass were tested. The experimental investigation aimed to monitor the variation in natural frequency and damping of the four physical models at different degrees of excess pore water pressure generation and in full-liquefaction condition. The experimental results showed that the natural frequency of pile-supported structures may decrease considerably owing to the loss of lateral support offered by the soil to the pile. On the other hand, the damping ratio of structure may increase to values in excess of 20%. These findings have important design consequences: (a) for low-period structures, substantial reduction of spectral acceleration is expected; (b) during and after liquefaction, the response of the system may be dictated by the interactions of multiple loadings, that is, horizontal, axial and overturning moment, which were negligible prior to liquefaction; and (c) with the onset of liquefaction due to increased flexibility of pile-supported structure, larger spectral displacement may be expected, which in turn may enhance Pdelta effects and consequently amplification of overturning moment. Practical implications for pile design are discussed.
Resumo:
Hidden Markov Models (HMMs) have been successfully applied to different modelling and classification problems from different areas over the recent years. An important step in using HMMs is the initialisation of the parameters of the model as the subsequent learning of HMM’s parameters will be dependent on these values. This initialisation should take into account the knowledge about the addressed problem and also optimisation techniques to estimate the best initial parameters given a cost function, and consequently, to estimate the best log-likelihood. This paper proposes the initialisation of Hidden Markov Models parameters using the optimisation algorithm Differential Evolution with the aim to obtain the best log-likelihood.
Resumo:
This paper discusses how the use of computer-based modelling tools has aided the design of a telemetry unit for use with oil well logging. With the aid of modern computer-based simulation techniques, the new design is capable of operating at data rates of 2.5 times faster than previous designs.
Resumo:
This paper proposes a procedure to control on-line processes for attributes, using an Shewhart control chart with two control limits (warning limit and control limit) and will be based on a sequence of inspection (h). The inspection procedure is based on Taguchi et al. (1989), in which to inspect the item, if the number of non-conformities is higher than an upper control limit, the process needs to be stopped and some adjustment is required; and, if the last inspection h, from all items inspected present a number of non-conformities between the control limit and warning limit. The items inspected will suffer destructive inspection, being discarded after inspection. Properties of an ergodic Markov chain are used to get the expression of average cost per item and the aim was the determination of four optimized parameters: the sampling interval of the inspections (m); the constant W to draw the warning limit (W); the constant C to draw the control limit (C), where W £ C, and the length of sequence of inspections (h). Numerical examples illustrate the proposed procedure