976 resultados para Great Western Railway
Resumo:
Letter to S.D. Woodruff from William Hamilton Merritt in which he says he feels disposed to using every effort to complete the road to the Great Western Railway as originally designed (4 pages), Aug. 29, 1855
Resumo:
Letter to S.D. Woodruff from William Hamilton Merritt in which he says that the line from Allenburgh down should be divided into sections and also, that he is in favour of crossing the Great Western Railway by bridge. This letter was folded into a piece of paper (used like an envelope). This is included (4 pages), Oct. 23, 1856.
Resumo:
Letter to S.D. Woodruff from Mr. Ingersoll regarding Mr. Ross, track, superintendent of the Great Western Railway to let you know what day he can put the switch in at Thorold to make the connection with the Great Western Railway, Dec. 16, 1856.
Resumo:
Letter containing a memorandum of the work done during Nov. 1855 by Messrs. Brown and McDonell. The work done includes track laying and timber in culverts. There is also a section of the road between St. Catharines and the Great Western Railway where earth has been removed, posts set and laid. This is signed by Francis Lalor, Dec. 12, 1855.
Resumo:
The railroad, from 1870 and on, becomes an usual complaining in the press s and politician elite s speeches, especially because of Natal s geographic isolation. The implantation of two railroads in the capital territory Estrada de Ferro de Natal a Nova Cruz, afterwards part of Great Western Railway Company network, and Estrada de Ferro Central do Rio Grande do Norte had serious implications in the urban environment. While railroad s structures were already consolidated, other transportation mechanisms were being implanted in the first decades of the 20th century, such as trams lines, which, by the way, was a transport modal that also used rails as a dislocation meaning. Considering these questions, we may ask: how come railroads and tramways demands, roads and buildings had influenced the internal organization of Natal? We work with the general hypothesis that the influence of technical networks, composed by tramways and railroads, over Natal s urban space happened in a diversified way, sometimes consolidating social aspects in certain areas, sometimes improving the occupation of others. The impact over the city s territory also happens in a diversified way between the buildings/railroad s complexes and the pathways. The different scale of the train in comparison to the trams velocity, size, noise level, flow, among others is also a cause to the different consequences in urban environment. The main objective of this work is to understand the role of circulation technical networks in the construction process of urban space in Natal, as a way to contribute to the urban historiography about the subject. The time frame adopted, between 1881 and 1937, marks the time path of railroads and tramways in Rio Grande do Norte: 1881 is the year of railroad s first section inauguration from Natal to São José do Mipibu as well of the railroad complex in the Republic Square in Natal; the year of 1937 marks the beginning of tramways declination process in the city. At this time railroads and tramways had to face more intensively the competition of motor vehicles. The theory reference adopted is based on concepts and analysis of authors, such as Flávio Villaça and Roberto Lobato Corrêa references to the concepts of urban structure , localization and accessibility and Gabriel Dupuy to explain the concept of urban technical networks . These references reveal the conflict of different realities in the urban universe interests and values which is an important factor about the construction of urban space. The information sources used were from two distinctive natures: primary, journals of the time studied and official government reports, and secondary, based on other works about the subject. It was also used by this study iconographic source, especially images from the data base of the research group História da Cidade, do Território e do Urbanismo .
Resumo:
Mode of access: Internet.
Resumo:
The railroad, from 1870 and on, becomes an usual complaining in the press s and politician elite s speeches, especially because of Natal s geographic isolation. The implantation of two railroads in the capital territory Estrada de Ferro de Natal a Nova Cruz, afterwards part of Great Western Railway Company network, and Estrada de Ferro Central do Rio Grande do Norte had serious implications in the urban environment. While railroad s structures were already consolidated, other transportation mechanisms were being implanted in the first decades of the 20th century, such as trams lines, which, by the way, was a transport modal that also used rails as a dislocation meaning. Considering these questions, we may ask: how come railroads and tramways demands, roads and buildings had influenced the internal organization of Natal? We work with the general hypothesis that the influence of technical networks, composed by tramways and railroads, over Natal s urban space happened in a diversified way, sometimes consolidating social aspects in certain areas, sometimes improving the occupation of others. The impact over the city s territory also happens in a diversified way between the buildings/railroad s complexes and the pathways. The different scale of the train in comparison to the trams velocity, size, noise level, flow, among others is also a cause to the different consequences in urban environment. The main objective of this work is to understand the role of circulation technical networks in the construction process of urban space in Natal, as a way to contribute to the urban historiography about the subject. The time frame adopted, between 1881 and 1937, marks the time path of railroads and tramways in Rio Grande do Norte: 1881 is the year of railroad s first section inauguration from Natal to São José do Mipibu as well of the railroad complex in the Republic Square in Natal; the year of 1937 marks the beginning of tramways declination process in the city. At this time railroads and tramways had to face more intensively the competition of motor vehicles. The theory reference adopted is based on concepts and analysis of authors, such as Flávio Villaça and Roberto Lobato Corrêa references to the concepts of urban structure , localization and accessibility and Gabriel Dupuy to explain the concept of urban technical networks . These references reveal the conflict of different realities in the urban universe interests and values which is an important factor about the construction of urban space. The information sources used were from two distinctive natures: primary, journals of the time studied and official government reports, and secondary, based on other works about the subject. It was also used by this study iconographic source, especially images from the data base of the research group História da Cidade, do Território e do Urbanismo .
Resumo:
The railroad, from 1870 and on, becomes an usual complaining in the press s and politician elite s speeches, especially because of Natal s geographic isolation. The implantation of two railroads in the capital territory Estrada de Ferro de Natal a Nova Cruz, afterwards part of Great Western Railway Company network, and Estrada de Ferro Central do Rio Grande do Norte had serious implications in the urban environment. While railroad s structures were already consolidated, other transportation mechanisms were being implanted in the first decades of the 20th century, such as trams lines, which, by the way, was a transport modal that also used rails as a dislocation meaning. Considering these questions, we may ask: how come railroads and tramways demands, roads and buildings had influenced the internal organization of Natal? We work with the general hypothesis that the influence of technical networks, composed by tramways and railroads, over Natal s urban space happened in a diversified way, sometimes consolidating social aspects in certain areas, sometimes improving the occupation of others. The impact over the city s territory also happens in a diversified way between the buildings/railroad s complexes and the pathways. The different scale of the train in comparison to the trams velocity, size, noise level, flow, among others is also a cause to the different consequences in urban environment. The main objective of this work is to understand the role of circulation technical networks in the construction process of urban space in Natal, as a way to contribute to the urban historiography about the subject. The time frame adopted, between 1881 and 1937, marks the time path of railroads and tramways in Rio Grande do Norte: 1881 is the year of railroad s first section inauguration from Natal to São José do Mipibu as well of the railroad complex in the Republic Square in Natal; the year of 1937 marks the beginning of tramways declination process in the city. At this time railroads and tramways had to face more intensively the competition of motor vehicles. The theory reference adopted is based on concepts and analysis of authors, such as Flávio Villaça and Roberto Lobato Corrêa references to the concepts of urban structure , localization and accessibility and Gabriel Dupuy to explain the concept of urban technical networks . These references reveal the conflict of different realities in the urban universe interests and values which is an important factor about the construction of urban space. The information sources used were from two distinctive natures: primary, journals of the time studied and official government reports, and secondary, based on other works about the subject. It was also used by this study iconographic source, especially images from the data base of the research group História da Cidade, do Território e do Urbanismo .
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Resumen: El Concilio de Constanza (1414-1418) fue la instancia definitiva de solución del Cisma de Occidente. Sus decisiones condujeron
Resumo:
The limnological investigations in Uganda freshwaters which were started in the 1920s looked into: the origins, the changing geological and climatic factors which gave rise to the characteristic inland waters; the primary production; the constituent small aquatic organisms and their ecology; and their bordering swamps. Most of them were formed immediately after the formation of the great Western rift valley. Almost all the inland waters in Uganda are typical tropical freshwaters which, because of their relative shallowness, experience rather frequent wind stirrings and therefore nutrient circulation which would make them relatively productive. Many physical, biological and chemical factors come into play to finally determine this. The present investigations continue to bridge the gaps which were left and also to collect the baseline data needed to later manage, monitor and control any possible pollution risks.
Resumo:
Survey map of the Second Welland Canal created by the Welland Canal Company showing the Grantham Township along the outskirts of Merritton. Identified structures associated with the Canal include Locks 11, 12, 13, 14, and 15, Lock House Lot, and the towing path. The surveyors' measurements and notes can be seen in red and black ink and pencil. Several stones likely used in the measurements are identified on the map. Local area landmarks are also identified and include streets and roads(ex. Hartzel Road and Macadamized Road), the Great Western Railroad, Swing Bridge, Thorold Station and its structures (ex. freight house, office, water tank, and wood house), Gordon and Mackay Houses, Gordon and Mackay's Cotton Mill, hydraulic race, a wharf, pond, and an unnamed bridge. Properties and property owners of note are: Concession 9 Lots 12 and 13, A. Bradley, John O'Coner, G. Grant, J. Bradley, J. Vanderburgh, O. Clifford and a parcel of land leased Gordon and Mackay.