997 resultados para Great Northern Railway
Resumo:
Editor: Sir Frederick Pollock.
Resumo:
Editor; Frederick Pollock.
Resumo:
Editors: 1891-1894, A.P. Stone; 1895-1900, Frederick Pollock.
Resumo:
Mode of access: Internet.
Resumo:
Rapid, non-intrusive surface wave surveys provide depth profiles from which ground models can be generated for use in earthwork condition assessment. Stiffness throughout earthworks controls the behaviour under static and dynamic loads, and characterising heterogeneity is of interest in relation to the stability of engineered backfill and life-cycle deterioration in aged utility and transportation infrastructure. Continuous surface wave methods were used to identify interfaces between fine- and coarse-grained fill in an end-tipped embankment along the Great Central Railway in Nottinghamshire, UK. Multichannel analysis of surface wave (MASW) methods were used to characterise subsurface voiding in a canal embankment along the Knottingley and Goole canal near Eggborough, Yorkshire. MASW methods are currently being used to study extreme weather impacts on the stability of a highplasticity clay embankment along the Gloucestershire–Warwickshire railway near Laverton. Optimal results were obtained using equipment capable of generating and detecting over wide frequency ranges.
Resumo:
The railroad, from 1870 and on, becomes an usual complaining in the press s and politician elite s speeches, especially because of Natal s geographic isolation. The implantation of two railroads in the capital territory Estrada de Ferro de Natal a Nova Cruz, afterwards part of Great Western Railway Company network, and Estrada de Ferro Central do Rio Grande do Norte had serious implications in the urban environment. While railroad s structures were already consolidated, other transportation mechanisms were being implanted in the first decades of the 20th century, such as trams lines, which, by the way, was a transport modal that also used rails as a dislocation meaning. Considering these questions, we may ask: how come railroads and tramways demands, roads and buildings had influenced the internal organization of Natal? We work with the general hypothesis that the influence of technical networks, composed by tramways and railroads, over Natal s urban space happened in a diversified way, sometimes consolidating social aspects in certain areas, sometimes improving the occupation of others. The impact over the city s territory also happens in a diversified way between the buildings/railroad s complexes and the pathways. The different scale of the train in comparison to the trams velocity, size, noise level, flow, among others is also a cause to the different consequences in urban environment. The main objective of this work is to understand the role of circulation technical networks in the construction process of urban space in Natal, as a way to contribute to the urban historiography about the subject. The time frame adopted, between 1881 and 1937, marks the time path of railroads and tramways in Rio Grande do Norte: 1881 is the year of railroad s first section inauguration from Natal to São José do Mipibu as well of the railroad complex in the Republic Square in Natal; the year of 1937 marks the beginning of tramways declination process in the city. At this time railroads and tramways had to face more intensively the competition of motor vehicles. The theory reference adopted is based on concepts and analysis of authors, such as Flávio Villaça and Roberto Lobato Corrêa references to the concepts of urban structure , localization and accessibility and Gabriel Dupuy to explain the concept of urban technical networks . These references reveal the conflict of different realities in the urban universe interests and values which is an important factor about the construction of urban space. The information sources used were from two distinctive natures: primary, journals of the time studied and official government reports, and secondary, based on other works about the subject. It was also used by this study iconographic source, especially images from the data base of the research group História da Cidade, do Território e do Urbanismo .
Resumo:
The railroad, from 1870 and on, becomes an usual complaining in the press s and politician elite s speeches, especially because of Natal s geographic isolation. The implantation of two railroads in the capital territory Estrada de Ferro de Natal a Nova Cruz, afterwards part of Great Western Railway Company network, and Estrada de Ferro Central do Rio Grande do Norte had serious implications in the urban environment. While railroad s structures were already consolidated, other transportation mechanisms were being implanted in the first decades of the 20th century, such as trams lines, which, by the way, was a transport modal that also used rails as a dislocation meaning. Considering these questions, we may ask: how come railroads and tramways demands, roads and buildings had influenced the internal organization of Natal? We work with the general hypothesis that the influence of technical networks, composed by tramways and railroads, over Natal s urban space happened in a diversified way, sometimes consolidating social aspects in certain areas, sometimes improving the occupation of others. The impact over the city s territory also happens in a diversified way between the buildings/railroad s complexes and the pathways. The different scale of the train in comparison to the trams velocity, size, noise level, flow, among others is also a cause to the different consequences in urban environment. The main objective of this work is to understand the role of circulation technical networks in the construction process of urban space in Natal, as a way to contribute to the urban historiography about the subject. The time frame adopted, between 1881 and 1937, marks the time path of railroads and tramways in Rio Grande do Norte: 1881 is the year of railroad s first section inauguration from Natal to São José do Mipibu as well of the railroad complex in the Republic Square in Natal; the year of 1937 marks the beginning of tramways declination process in the city. At this time railroads and tramways had to face more intensively the competition of motor vehicles. The theory reference adopted is based on concepts and analysis of authors, such as Flávio Villaça and Roberto Lobato Corrêa references to the concepts of urban structure , localization and accessibility and Gabriel Dupuy to explain the concept of urban technical networks . These references reveal the conflict of different realities in the urban universe interests and values which is an important factor about the construction of urban space. The information sources used were from two distinctive natures: primary, journals of the time studied and official government reports, and secondary, based on other works about the subject. It was also used by this study iconographic source, especially images from the data base of the research group História da Cidade, do Território e do Urbanismo .
Resumo:
Axle bearing damage with possible catastrophic failures can cause severe disruptions or even dangerous derailments, potentially causing loss of human life and leading to significant costs for railway infrastructure managers and rolling stock operators. Consequently the axle bearing damage process has safety and economic implications on the exploitation of railways systems. Therefore it has been the object of intense attention by railway authorities as proved by the selection of this topic by the European Commission in calls for research proposals. The MAXBE Project (http://www.maxbeproject.eu/), an EU-funded project, appears in this context and its main goal is to develop and to demonstrate innovative and efficient technologies which can be used for the onboard and wayside condition monitoring of axle bearings. The MAXBE (interoperable monitoring, diagnosis and maintenance strategies for axle bearings) project focuses on detecting axle bearing failure modes at an early stage by combining new and existing monitoring techniques and on characterizing the axle bearing degradation process. The consortium for the MAXBE project comprises 18 partners from 8 member states, representing operators, railway administrations, axle bearing manufactures, key players in the railway community and experts in the field of monitoring, maintenance and rolling stock. The University of Porto is coordinating this research project that kicked-off in November 2012 and it is completed on October 2015. Both on-board and wayside systems are explored in the project since there is a need for defining the requirement for the onboard equipment and the range of working temperatures of the axle bearing for the wayside systems. The developed monitoring systems consider strain gauges, high frequency accelerometers, temperature sensors and acoustic emission. To get a robust technology to support the decision making of the responsible stakeholders synchronized measurements from onboard and wayside monitoring systems are integrated into a platform. Also extensive laboratory tests were performed to correlate the in situ measurements to the status of the axle bearing life. With the MAXBE project concept it will be possible: to contribute to detect at an early stage axle bearing failures; to create conditions for the operational and technical integration of axle bearing monitoring and maintenance in different European railway networks; to contribute to the standardization of the requirements for the axle bearing monitoring, diagnosis and maintenance. Demonstration of the developed condition monitoring systems was performed in Portugal in the Northern Railway Line with freight and passenger traffic with a maximum speed of 220 km/h, in Belgium in a tram line and in the UK. Still within the project, a tool for optimal maintenance scheduling and a smart diagnostic tool were developed. This paper presents a synthesis of the most relevant results attained in the project. The successful of the project and the developed solutions have positive impact on the reliability, availability, maintainability and safety of rolling stock and infrastructure with main focus on the axle bearing health.
Resumo:
The purpose of the Strategy is to improve the health and well-being of mothers and babies in Northern Ireland through breastfeeding. It sets out the strategic direction to protect, promote, support and normalise breastfeeding in Northern Ireland for the next ten years.
Resumo:
The purpose of the Strategy is to improve the health and well-being of mothers and babies in Northern Ireland through breastfeeding. It sets out the strategic direction to protect, promote, support and normalise breastfeeding in Northern Ireland for the next ten years.
Resumo:
Pay roll voucher #13 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the Northern Division for the month of April, 1857 approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, April 27, 1857.
Resumo:
Pay roll voucher # 17 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division for the month of May, 1857, approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, May 27, 1857.
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension for W.G. Thompson for the Northern Division. There are attached notes from the Welland Railway Company to John Mitchell for putting up shelves; to William Waud, staff; and to William Martin to repair the office (copy), June 10, 1857.
Resumo:
Pay roll voucher #20 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer (copy) June 1857.
Resumo:
Pay roll voucher #25 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division, for the month of July, 1857 approved by F. Shanly, chief engineer and W. G. Thompson (copy), July 30, 1857.