923 resultados para Fixed retainer
Resumo:
This study analyses and compares the cost efficiency of Japanese steam power generation companies using the fixed and random Bayesian frontier models. We show that it is essential to account for heterogeneity in modelling the performance of energy companies. Results from the model estimation also indicate that restricting CO2 emissions can lead to a decrease in total cost. The study finally discusses the efficiency variations between the energy companies under analysis, and elaborates on the managerial and policy implications of the results.
Resumo:
This book focuses on how evolutionary computing techniques benefit engineering research and development tasks by converting practical problems of growing complexities into simple formulations, thus largely reducing development efforts. This book begins with an overview of the optimization theory and modern evolutionary computing techniques, and goes on to cover specific applications of evolutionary computing to power system optimization and control problems.
Resumo:
Purpose of this paper This research aims to examine the effects of inadequate documentation to the cost management & tendering processes in Managing Contractor Contracts using Fixed Lump Sum as a benchmark. Design/methodology/approach A questionnaire survey was conducted with industry practitioners to solicit their views on documentation quality issues associated with the construction industry. This is followed by a series of semi-structured interviews with a purpose of validating survey findings. Findings and value The results showed that documentation quality remains a significant issue, contributing to the industries inefficiency and poor reputation. The level of satisfaction for individual attributes of documentation quality varies. Attributes that do appear to be affected by the choice of procurement method include coordination, build ability, efficiency, completeness and delivery time. Similarly the use and effectiveness of risk mitigation techniques appears to vary between the methods, based on a number of factors such as documentation completeness, early involvement, fast tracking etc. Originality/value of paper This research fills the gap of existing body of knowledge in terms of limited studies on the choice of a project procurement system has an influence on the documentation quality and the level of impact. Conclusions Ultimately research concludes that the entire project team including the client and designers should carefully consider the individual projects requirements and compare those to the trade-offs associated with documentation quality and the procurement method. While documentation quality is definitely an issue to be improved upon, by identifying the projects performance requirements a procurement method can be chosen to maximise the likelihood that those requirements will be met. This allows the aspects of documentation quality considered most important to the individual project to be managed appropriately.
Resumo:
This paper presents a visual SLAM method for temporary satellite dropout navigation, here applied on fixed- wing aircraft. It is designed for flight altitudes beyond typical stereo ranges, but within the range of distance measurement sensors. The proposed visual SLAM method consists of a common localization step with monocular camera resectioning, and a mapping step which incorporates radar altimeter data for absolute scale estimation. With that, there will be no scale drift of the map and the estimated flight path. The method does not require simplifications like known landmarks and it is thus suitable for unknown and nearly arbitrary terrain. The method is tested with sensor datasets from a manned Cessna 172 aircraft. With 5% absolute scale error from radar measurements causing approximately 2-6% accumulation error over the flown distance, stable positioning is achieved over several minutes of flight time. The main limitations are flight altitudes above the radar range of 750 m where the monocular method will suffer from scale drift, and, depending on the flight speed, flights below 50 m where image processing gets difficult with a downwards-looking camera due to the high optical flow rates and the low image overlap.
Resumo:
Diaphragm action of crest-fixed profiled steel claddings is present in low-rise buildings whether the designer acknowledges it or not. For the designers to take advantage of the diaphragm strength of the crest-fixed steel claddings in the design of low-rise buildings in a similar manner to valley-fixed claddings, and to design the buildings based on the true behaviour rather than the assumed behaviour, shear/racking behaviour of the three trapezoidal and corrugated steel claddings commonly used at present was investigated using large scale experiments. Crest-fixed claddings (up to a maximum size of 6 x 6.2m) with different aspect ratio and fastening systems were tested to failure, based on which suitable shear strength and stiffness values have been proposed for these claddings as they are used at present. A simple analytical model combined with basic connection data from small scale experiments was used to predict the shear strength of tested panels. Currently attempts are being made to develop general design formulae to determine shear strength and stiffness of crest-fixed steel claddings...
Resumo:
The rights of individuals to self-determination and participation in social, political and economic life are recognised and supported by Articles 1, 3 and 25 of the International Covenant on Civil and Political Rights 1966.4 Article 1 of the United Nations’ Human Rights Council’s Resolution on the Promotion and Protection of Human Rights on the Internet of July 2012 confirms individuals have the same rights online as offline. Access to the internet is essential and as such the UN: Calls upon all States to promote and facilitate access to the Internet and international cooperation aimed at the development of media and information and communications facilities in all countries (Article 3) Accordingly, access to the internet per se is a fundamental human right, which requires direct State recognition and support.5 The obligations of the State to ensure its citizens are able, and are enabled, to access the internet, are not matters that should be delegated to commercial parties. Quite simply – access to the internet, and high-speed broadband, by whatever means are “essential services” and therefore “should be treated as any other utility service”...
Resumo:
A number of hurdles must be overcome in order to integrate unmanned aircraft into civilian airspace for routine operations. The ability of the aircraft to land safely in an emergency is essential to reduce the risk to people, infrastructure and aircraft. To date, few field-demonstrated systems have been presented that show online re-planning and repeatability from failure to touchdown. This paper presents the development of the Guidance, Navigation and Control (GNC) component of an Automated Emergency Landing System (AELS) intended to address this gap, suited to a variety of fixed-wing aircraft. Field-tested on both a fixed-wing UAV and Cessna 172R during repeated emergency landing experiments, a trochoid-based path planner computes feasible trajectories and a simplified control system executes the required manoeuvres to guide the aircraft towards touchdown on a predefined landing site. This is achieved in zero-thrust conditions with engine forced to idle to simulate failure. During an autonomous landing, the controller uses airspeed, inertial and GPS data to track motion and maintains essential flight parameters to guarantee flyability, while the planner monitors glide ratio and re-plans to ensure approach at correct altitude. Simulations show reliability of the system in a variety of wind conditions and its repeated ability to land within the boundary of a predefined landing site. Results from field-tests for the two aircraft demonstrate the effectiveness of the proposed GNC system in live operation. Results show that the system is capable of guiding the aircraft to close proximity of a predefined keyhole in nearly 100% of cases.
Resumo:
This paper deals with the optimal load flow problem in a fixed-head hydrothermal electric power system. Equality constraints on the volume of water available for active power generation at the hydro plants as well as inequality constraints on the reactive power generation at the voltage controlled buses are imposed. Conditions for optimal load flow are derived and a successive approximation algorithm for solving the optimal generation schedule is developed. Computer implementation of the algorithm is discussed, and the results obtained from the computer solution of test systems are presented.
Resumo:
An input-output, frequency-domain characterization of decentralized fixed modes is given in this paper, using only standard block-diagram algebra, well-known determinantal expansions and the Binet-Cauchy formula.
Resumo:
A restricted maximum likelihood analysis applied to an animal model showed no significant differences (P > 0.05) in pH value of the longissimus dorsi measured at 24 h post-mortem (pH24) between high and low lines of Large White pigs selected over 4 years for post-weaning growth rate on restricted feeding. Genetic and phenotypic correlations between pH24 and production and carcass traits were estimated using all performance testing records combined with the pH24 measurements (5.05-7.02) on slaughtered animals. The estimate of heritability for pH24 was moderate (0.29 ± 0.18). Genetic correlations between pH24 and production or carcass composition traits, except for ultrasonic backfat (UBF), were not significantly different from zero. UBF had a moderate, positive genetic correlation with pH24 (0.24 ± 0.33). These estimates of genetic correlations affirmed that selection for increased growth rate on restricted feeding is likely to result in limited changes in pH24 and pork quality since the selection does not put a high emphasis on reduced fatness.
Resumo:
In this technical note, it is established that the unassignable polynomial defined for a not strongly connected decentralized control system is not equal to Davison's fixed polynomial. This leads to a "sufficient condition" for the equality of the unassignable polynomial and Davison's fixed polynomial for strongly connected systems.
Resumo:
This study compared pregnancy rates (PRs) and costs per calf born after fixed-time artificial insemination (FTAI) or AI after estrus detection (i.e., estrus detection and AI, EDAI), before and after a single PGF2α treatment in Bos indicus (Brahman-cross) heifers. On Day 0, the body weight, body condition score, and presence of a CL (46% of heifers) were determined. The heifers were then alternately allocated to one of two FTAI groups (FTAI-1, n = 139) and (FTAI-2, n = 141) and an EDAI group (n = 273). Heifers in the FTAI groups received an intravaginal progesterone-releasing device (IPRD; 0.78 g of progesterone) and 1 mg of estradiol benzoate intramuscularly (im) on Day 0. Eight days later, the IPRD was removed and heifers received 500 μg of PGF2α and 300 IU of eCG im; 24 hours later, they received 1 mg estradiol benzoate im and were submitted to FTAI 30 to 34 hours later (54 and 58 hours after IPRD removal). Heifers in the FTAI-2 group started treatment 8 days after those in the FTAI-1 group. Heifers in the EDAI group were inseminated approximately 12 hours after the detection of estrus between Days 4 and 9 at which time the heifers that had not been detected in estrus received 500 μg of PGF2α im and EDAI continued until Day 13. Heifers in the FTAI groups had a higher overall PR (proportion pregnant as per the entire group) than the EDAI group (34.6% vs. 23.2%; P = 0.003), however, conception rate (PR of heifers submitted for AI) tended to favor the estrus detection group (34.6% vs. 44.1%; P = 0.059). The cost per AI calf born was estimated to be $267.67 and $291.37 for the FTAI and EDAI groups, respectively. It was concluded that in Brahman heifers typical of those annually mated in northern Australia FTAI compared with EDAI increases the number of heifers pregnant and reduces the cost per calf born.
Resumo:
Pregnancy rates (PR) to fixed-time AI (FTAI) in Brahman heifers were compared after treatment with a traditional oestradiol-based protocol (OPO-8) or a modified protocol (OPO-6) where the duration of intravaginal progesterone releasing device (IPRD) was reduced from 8 to 6 days, and the interval from IPRD removal to oestradiol benzoate (ODB) was increased from 24 to 36 h. Rising 2 yo heifers on Farm A: (n = 238 and n = 215; two consecutive days AI); B (n = 271); and C (n = 393) were allocated to OPO-8 or OPO-6. An IPRD was inserted and 1 mg ODB i.m. on Day 0 for OPO-8 heifers and Day 2 for OPO-6 heifers. On Day 8, the IPRD was removed and 500 μg cloprostenol i.m. At 24 h, for OPO-8 heifers, and 36 h, for OPO-6 heifers, post IPRD removal all heifers received 1 mg ODB i.m. FTAI was conducted at 54 and 72 h post IPRD removal for OPO-8 and OPO-6 heifers. At Farm A, OPO-6 heifers, AI on the second day, the PR was 52.4 to FTAI (P = 0.024) compared to 36.8 for OPO-8 heifers. However, no differences were found between OPO-8 and OPO-6 protocols at Farm A (first day of AI) (39.9 vs. 35.7), or Farms B (26.2 vs. 35.4) and C (43.2 vs. 40.3). Presence of a corpus luteum at IPRD insertion affected PR to FTAI (43.9 vs. 28.8; P < 0.001). This study has shown that the modified ovulation synchronisation protocol OPO-6 may be a viable alternative to the OPO-8 protocol for FTAI in B. indicus heifers.