855 resultados para Finishes in the construction
Resumo:
I present my explorative research about conflict and social identity. The Social Identity Approach of Henri Tajfel and John Turner is used as theoretical frame in the study. The main question is how the construction of social identity of group members is influenced by an inter-group conflict. The research project consists of two parts: 1. An empirical study conducted with qualitative research methods to investigate a today’s congregation of the Swiss reformed Church who experienced a conflict about twenty years ago. This conflict ended by the separation of a sub-group from the congregations. This group forms an independent community today. Members of both congregations where interviewed about the meaning which membership has for them and about their interpretation of the conflict. 2. An analysis of the Gospel of Matthew with questions who where developed out of the empirical study and the Social Identity Approach to better understand the separation conflict between the Matthean community and the synagogue.
Resumo:
We present studies of 9 modern (up to 400-yr-old) peat sections from Slovenia, Switzerland, Austria, Italy, and Finland. Precise radiocarbon dating of modern samples is possible due to the large bomb peak of atmospheric 14C concentration in 1963 and the following rapid decline in the 14C level. All the analyzed 14C profiles appeared concordant with the shape of the bomb peak of atmospheric 14C concentration, integrated over some time interval with a length specific to the peat section. In the peat layers covered by the bomb peak, calendar ages of individual peat samples could be determined almost immediately, with an accuracy of 23 yr. In the pre-bomb sections, the calendar ages of individual dated samples are determined in the form of multi-modal probability distributions of about 300 yr wide (about AD 16501950). However, simultaneous use of the post-bomb and pre-bomb 14C dates, and lithological information, enabled the rejection of most modes of probability distributions in the pre-bomb section. In effect, precise age-depth models of the post-bomb sections have been extended back in time, into the wiggly part of the 14C calibration curve.
Resumo:
This paper presents the application of the Integral Masonry System (IMS) to the construction of earthquake resistant houses and its experimental study. To verify the security of this new type of building in seismic areas of the third world two prototypes have been tested, one with adobe and the other with hollow brick. In both cases it’s a two-story 6x6x6 m3 house built to scale 1/2. The tests are carried out at the Laboratory of Antiseismic Structures of the Department of Engineering, Pontifical Catholic University of Peru in Lima, in collaboration with the UPM (Technical University of Madrid). This article shows the design process of the prototypes to test, including the sizing of the reinforcements, the characteristics of the tests and the results obtained. These results show that the IMS with adobe or brick remains stable with no significant cracks faced with a severe earthquake, with an estimated acceleration of 1.8 g. Este artículo presenta una aplicación del Sistema de Albañilería Integral (SAI) a la construcción de viviendas sismorresistentes y su estudio experimental. Para verificar su seguridad para su construcción en zonas sísmicas del tercer mundo se han ensayado dos prototipos, uno con adobe, y otro con ladrillo hueco. Se trata de una vivienda de 6x6x6 m3 y dos plantas que se construyen a escala 1/2. Los ensayos se realizaron en el Laboratorio de Estructuras Antisísmicas del Departamento de Ingeniería de la Pontificia Católica Universidad del Perú (PUCP) de Lima en colaboración con la UPM (Universidad Politécnica de Madrid). Este artículo muestra el proceso de diseño de los prototipos a ensayar, incluido el dimensionado de los refuerzos, las características de los ensayos y los resultados obtenidos. Estos resultados muestran que el SAI con adobe o ladrillo permanece estable sin grietas significativas ante un sismo severo, con una aceleración estimada de 1,8 g.
Resumo:
The construction of a Gothic vault implied the solution of several technical challenges. The literature on Gothic vault construction is quite large and its growth continues steadily. The main challenge of any structure is that, during and after construction, it must be "safe", that is, it must not collapse. Indeed, it must be amply safe, able to support different loads for long periods of time. Masonry architecture has shown its structural safety for centuries or millennia. The Pantheon of Rome stands today after almost 2,000 years without having needed any structural reinforcement (of course, the survival of any building implies continuous maintenance) . Hagia Sophia in Istanbul, finished in the 6th century AD, has withstood not only the dead loads but also many severe earthquakes . Finally, the Gothic cathedrals, with their appearance of weakness, are• more than a half millennium old. The question arises of what the source of this amazing strength is and how the illiterate master masons were able to design such daring and safe structures . This question is usually evaded in manuals of Gothic architecture. This is quite surprising, the structure being a fundamental part of Gothic buildings. The present article aims to give such an explanation, which has been studied in detail elsewhere. In the first part, the Gothic design methods "V ill be discussed. In the second part, the validity of these methods wi11 be verified within the frame of the modern theory of masonry structures . References have been reduced to a minimum to make the text simpler and more direct.
Resumo:
The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that area
Resumo:
A modified winding layout for three-phase transformers with PCB windings is proposed in this paper. This modified layout can be used in high current transformers with many PCB layers to simplify the fabrication process. One of the key factors that might increase the cost and complexity in the construction of planar transformers is the number of layers of each PCB winding. This issue becomes even more important in medium-high power three-phase transformers, where the number of PCB layers is higher. In addition to that, the proposed method allows the use of commercial core shapes that are commonly used to design single-phase transformers. This fact makes possible the reduction of cost and flexibility of the design solutions. The proposed solution has been validated and compared using the conventional and the proposed methodologies to design a high power (20 kW) transformer.