794 resultados para Cost Analysis
Resumo:
There are many factors which can assist in controlling the cost of labor in the food service industry. The author discusses a number of these, including scheduling, establishing production standards, forecasting workloads, analyzing employee turnover, combating absenteeism, and controlling overtime.
Resumo:
ACKNOWLEDGMENT We are thankful to RTE for financial support of this project.
Resumo:
The effectiveness of the Incredible Years Basic parent programme (IYBP) in reducing child conduct problems and improving parent competencies and mental health was examined in a 12-month follow-up. Pre- to post-intervention service use and related costs were also analysed. A total of 103 families and their children (aged 32–88 months), who previously participated in a randomised controlled trial of the IYBP, took part in a 12-month follow-up assessment. Child and parent behaviour and well-being were measured using psychometric and observational measures. An intention-to-treat analysis was carried out using a one-way repeated measures ANOVA. Pairwise comparisons were subsequently conducted to determine whether treatment outcomes were sustained 1 year post-baseline assessment. Results indicate that post-intervention improvements in child conduct problems, parenting behaviour and parental mental health were maintained. Service use and associated costs continued to decline. The results indicate that parent-focused interventions, implemented in the early years, can result in improvements in child and parent behaviour and well-being 12 months later. A reduced reliance on formal services is also indicated.
Resumo:
Teachers frequently struggle to cope with conduct problems in the classroom. The aim of this study was to assess the effectiveness of the Incredible Years Teacher Classroom Management Training Programme for improving teacher competencies and child adjustment. The study involved a group randomised controlled trial which included 22 teachers and 217 children (102 boys and 115 girls). The average age of children included in the study was 5.3 years (standard deviation = 0.89). Teachers were randomly allocated to an intervention group (n = 11 teachers; 110 children) or a waiting-list control group (n = 11; 107 children). The sample also included 63 ‘high-risk’ children (33 intervention; 30 control), who scored above the cut-off (>12) on the Strengths and Difficulties Questionnaire for abnormal socioemotional and behavioural difficulties. Teacher and child behaviours were assessed at baseline and 6 months later using psychometric and observational measures. Programme delivery costs were also analysed. Results showed positive changes in teachers’ self-reported use of positive classroom management strategies (effect size = 0.56), as well as negative classroom management strategies (effect size = −0.43). Teacher reports also highlight improvements in the classroom behaviour of the high-risk group of children, while the estimated cost of delivering the Incredible Years Teacher Classroom Management Training Programme was modest. However, analyses of teacher and child observations were largely non-significant. A need for further research exploring the effectiveness and cost-effectiveness of the Incredible Years Teacher Classroom Management Training Programme is indicated.
Resumo:
Power distribution systems are susceptible to extreme damage from natural hazards especially hurricanes. Hurricane winds can knock down distribution poles thereby causing damage to the system and power outages which can result in millions of dollars in lost revenue and restoration costs. Timber has been the dominant material used to support overhead lines in distribution systems. Recently however, utility companies have been searching for a cost-effective alternative to timber poles due to environmental concerns, durability, high cost of maintenance and need for improved aesthetics. Steel has emerged as a viable alternative to timber due to its advantages such as relatively lower maintenance cost, light weight, consistent performance, and invulnerability to wood-pecker attacks. Both timber and steel poles are prone to deterioration over time due to decay in the timber and corrosion of the steel. This research proposes a framework for conducting fragility analysis of timber and steel poles subjected to hurricane winds considering deterioration of the poles over time. Monte Carlo simulation was used to develop the fragility curves considering uncertainties in strength, geometry and wind loads. A framework for life-cycle cost analysis is also proposed to compare the steel and timber poles. The results show that steel poles can have superior reliability and lower life-cycle cost compared to timber poles, which makes them suitable substitutes.
Resumo:
This thesis attempts to find the least-cost strategy to reduce CO2 emission by replacing coal by other energy sources for electricity generation in the context of the proposed EPA’s regulation on CO2 emissions from existing coal-fired power plants. An ARIMA model is built to forecast coal consumption for electricity generation and its CO2 emissions in Michigan from 2016 to 2020. CO2 emission reduction costs are calculated under three emission reduction scenarios- reduction to 17%, 30% and 50% below the 2005 emission level. The impacts of Production Tax Credit (PTC) and the intermittency of renewable energy are also discussed. The results indicate that in most cases natural gas will be the best alternative to coal for electricity generation to realize CO2 reduction goals; if the PTC for wind power will continue after 2015, a natural gas and wind combination approach could be the best strategy based on the least-cost criterion.
Resumo:
The damage Hurricane Sandy caused had far-reaching repercussions up and down the East Coast of the United States. Vast coastal flooding accompanied the storm, inundating homes, businesses, and utility and emergency facilities. Since the storm, projects to mitigate similar future floods have been scrutinized. Such projects not only need to keep out floodwaters but also be designed to withstand the effect that climate change might have on rising sea levels and increased flood risk. In this study, we develop an economic model to assess the costs and benefits of a berm (sea wall) to mitigate the effects of flooding from a large storm. We account for the lifecycle costs of the project, which include those for the upfront construction of the berm, ongoing maintenance, land acquisition, and wetland and recreation zone construction. Benefits of the project include avoided fatalities, avoided residential and commercial damages, avoided utility and municipal damages, recreational and health benefits, avoided debris removal expenses, and avoided loss of function of key transportation and commercial infrastructure located in the area. Our estimate of the beneficial effects of the berm includes ecosystem services from wetlands and health benefits to the surrounding community from a park and nature system constructed along the berm. To account for the effects of climate change and verify that the project will maintain its effectiveness over the long term, we allow the risk of flooding to increase over time. Over our 50-year time horizon, we double the risk of 100- and 500-year flood events to account for the effects of sea level rise on coastal flooding. Based on the economic analysis, the project is highly cost beneficial over its 50-year timeframe. This analysis demonstrates that climate change adaptation investments can be cost beneficial even though they mitigate the impacts of low-probability, high-consequence events.
Resumo:
The Keystone XL has a big role for transforming Canadian oil to the USA. The function of the pipeline is decreasing the dependency of the American oil industry on other countries and it will help to limit external debt. The proposed pipeline seeks the most suitable route which cannot damage agricultural and natural water recourses such as the Ogallala Aquifer. Using the Geographic Information System (GIS) techniques, the suggested path in this study got extremely high correct results that will help in the future to use the least cost analysis for similar studies. The route analysis contains different weighted overlay surfaces, each, was influenced by various criteria (slope, geology, population and land use). The resulted least cost path routes for each weighted overlay surface were compared with the original proposed pipeline and each displayed surface was more effective than the proposed Keystone XL pipeline.
Resumo:
The paper presents a spreadsheet-based multiple account framework for cost-benefit analysis which incorporates all the usual concerns of cost-benefit analysts such as shadow-pricing to account for market failure. distribution of net benefits. sensitivity and risk analysis, cost of public funds, and environmental effects. The approach is generalizable to a wide range of projects and situations and offers a number of advantages to both analysts and decision-makers, including transparency, a check on internal consistency, and a detailed summary of project net benefits disaggregated by stakeholder group. Of particular importance is the ease with which this framework allows for a project to be evaluated from alternative decision-making perspectives and under alternative policy scenarios where the trade-offs among the project's stakeholders can readily be identified and quantified. (C) 2004 Elsevier Ltd. All rights reserved.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
n design of bridge structures, it is common to adopt a 100 year design life. However, analysis of a number of case study bridges in Australia has indicated that the actual design life can be significantly reduced due to premature deterioration resulting from exposure to aggressive environments. A closer analysis of the cost of rehabilitation of these structures has raised some interesting questions. What would be the real service life of a bridge exposed to certain aggressive environments? What is the strategy of conducting bridge rehabilitation? And what are the life cycle costs associated with rehabilitation? A research project funded by the CRC for Construction Innovation in Australia is aimed at addressing these issues. This paper presents a concept map for assisting decision makers to appropriately choose the best treatment for bridge rehabilitation affected by premature deterioration through exposure to aggressive environments in Australia. The decision analysis is referred to a whole of life cycle cost analysis by considering appropriate elements of bridge rehabilitation costs. In addition, the results of bridges inspections in Queensland are presented
Resumo:
he purpose of this study was to evaluate the comparative cost of treating alcohol dependence with either cognitive behavioral therapy (CBT) alone or CBT combined with naltrexone (CBT+naltrexone). Two hundred ninety-eight outpatients dependent on alcohol who were consecutively treated for alcohol dependence participated in this study. One hundred seven (36%) patients received adjunctive pharmacotherapy (CBT+naltrexone). The Drug Abuse Treatment Cost Analysis Program was used to estimate treatment costs. Adjunctive pharmacotherapy (CBT+naltrexone) introduced an additional treatment cost and was 54% more expensive than CBT alone. When treatment abstinence rates (36.1% CBT; 62.6% CBT+naltrexone) were applied to cost effectiveness ratios, CBT+naltrexone demonstrated an advantage over CBT alone. There were no differences between groups on a preference-based health measure (SF-6D). In this treatment center, to achieve 100 abstainers over a 12-week program, 280 patients require CBT compared with 160 CBT+naltrexone. The dominant choice was CBT+naltrexone based on modest economic advantages and significant efficiencies in the numbers needed to treat.
Resumo:
With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.
Resumo:
Organisations are constantly seeking cost-effective improvements for their business processes. Business process management (BPM) provides organisations with a range of methods, techniques and tools for analysing, managing, and optimising their business operations. However, BPM initiatives within organisations tend to focus on investigating time and resource utilisation inefficiencies, rather than directly on cost inefficiencies. As a result, high-level cost-based managerial decisions are still being made separately from process related decisions. This position paper describes a research agenda that envisages a holistic approach to managing the cost of business operations in a structured manner, by making an explicit link between cost and processes in all phases of the business process management life cycle. We discuss a number of research challenges that need to be addressed in order to realise such an approach as well as findings from some of the initial research outcomes. It is envisioned that the research outcomes will enable organisations to make operational and strategic decisions with confidence based on accurate and real-time cost information about their operations.
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. With the increasing level of public awareness and government regulatory measures, the construction industry is experiencing a cultural shift to recognise, embrace and pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and the financial implications of including them on a lifecycle basis. They need tools that can aid the evaluation of investment options. To date, however, there have not been many financial assessments on the sustainability aspects of highway projects. This is because the existing life-cycle costing analysis (LCCA) models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper provides insights into the current practice of life-cycle cost analysis, and the identification and quantification of sustainability-related cost components in highway projects through literature review, questionnaire surveys and semi-structured interviews. The results can serve as a platform for highway project stakeholders to develop practical tools to evaluate highway investment decisions and reach an optimum balance between financial viability and sustainability deliverables.