961 resultados para Bajoelagua Factory
Resumo:
This work studies the integrated lot sizing and cutting stock problem, where the goal is to capture the dependency that exists between two important decisions in the production process, in order to economize raw materials and also reduce production and inventory costs. The integrated lot sizing and cutting stock problem is studied in a small furniture factory that produces wardrobes, dressing tables and cupboards and the lot sizing and cutting stock decisions are taken by the production manager. A column-generation technique is used to solve a linear relaxation of the proposed model. The computational results, using real data from the factory, show that it is possible to reduce total inventory and raw material costs when integrated planning is used. © 2013 IFAC.
Resumo:
The interaction between industry and university is often discussed. Industry participants feel they do not have enough time to spend with academics because of tight deadlines to achieve your goals. The other hand, professors and his students do not have availability and resources for responding quickly to industry activities. Both sides recognize the associated problems and feel the consequences of various forms. One way to reduce the distance between them is to provide industrial labs that resemble the factory floor at the university. Thus not only students may work on a real technological base, but also the industry's problems can be brought to the university laboratory. To ensure that relevant industrial problems will be studied, the industry needs help in the formulation of the problem being researched. The graduate program of Automation and Control Engineering from UNESP Sorocaba is aimed at training human resources with skills in automation and control activities related to the development of automatic control processes, integrating electronic commands, intelligent manufacturing and industrial robotics. In order to achieve its objectives, one of the pillars of the university consists of a wide range of modern equipments and software for industrial automation, which allows the circuit assembly from most primitive until configuration and programming of a complex system of integrated manufacturing. This paper describes industrial automation equipments and laboratory structure offered to students of Control and Automation Engineering graduate program at UNESP Sorocaba as alternative to close technologies and real problems on the job until academic world. The strategic is to do students understand theory and operations in robotic and industrial automation by means to manipulating real production systems locate at university
Resumo:
Car manufacturers increasingly offer delivery programs for the factory pick-up of new cars. Such a program consists of a broad range of event-marketing activities. In this paper we investigate the problem of scheduling the delivery program activities of one day such that the sum of the customers’ waiting times is minimized. We show how to model this problem as a resource-constrained project scheduling problem with nonregular objective function, and we present a relaxation-based beam-search solution heuristic. The relaxations are solved by exploiting a duality relationship between temporal scheduling and min-cost network flow problems. This approach has been developed in cooperation with a German automaker. The performance of the heuristic has been evaluated based on practical and randomly generated test instances.