996 resultados para 54-424C


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Deficiency of propionyl CoA carboxylase (PCC), a dodecamer of alpha and beta subunits, causes inherited propionic acidemia. We have studied, at the molecular level, PCC in 54 patients from 48 families comprised of 96 independent alleles. These patients of various ethnic backgrounds came from research centers and hospitals in Germany, Austria and Switzerland. The thorough clinical characterization of these patients was described in the accompanying paper (Grünert et al. 2012). In all 54 patients, many of whom originated from consanguineous families, the entire PCCB gene was examined by genomic DNA sequencing and in 39 individuals the PCCA gene was also studied. In three patients we found mutations in both PCC genes. In addition, in many patients RT-PCR analysis of lymphoblast RNA, lymphoblast enzyme assays, and expression of new mutations in E.coli were carried out. Eight new and eight previously detected mutations were identified in the PCCA gene while 15 new and 13 previously detected mutations were found in the PCCB gene. One missense mutation, p.V288I in the PCCB gene, when expressed in E.coli, yielded 134% of control activity and was consequently classified as a polymorphism in the coding region. Numerous new intronic polymorphisms in both PCC genes were identified. This study adds a considerable amount of new molecular data to the studies of this disease.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bureau of Nutrition and Health Promotion part of the Iowa Department of Public Health produces of weekly newsletter about the Iowa WIC Program for the State of Iowa citizen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A snapshot of water resource trends prepared by the Iowa DNR in collaboration with the Iowa Department of Agriculture and Land Stewardship, the U.S. Geological Survey, and The Iowa Homeland Security and Emergency Management Department.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collection : Bibliothèque rose illustrée