945 resultados para settlements
Resumo:
Soil liquefaction continues to be a major source of damage to buildings and infrastructure after major earthquake events. Ground improvement methods are widely used at many sites worldwide as a way of mitigating liquefaction damage. The relative success of these ground improvement methods in preventing damage after a liquefaction event and the mechanisms by which they can mitigate liquefaction continue to be areas of active research. In this paper the emphasis is on the use of dynamic centrifuge modelling as a tool to investigate the effectiveness of ground improvement methods in mitigating liquefaction risk. Three different ground improvement methods will be considered. First, the effectiveness of in situ densification as a liquefaction resistance measure will be investigated. It will be shown that the mechanism by which soil densification offers mitigation of the liquefaction risk can be studied at a fundamental level using dynamic centrifuge modelling. Second, the use of drains to relieve excess pore pressures generated during an earthquake event will be considered. It will be shown that current design methods can be further improved by incorporating the understanding obtained from dynamic centrifuge tests. Finally, the use of soil grouting to mitigate liquefaction risk will be investigated. It will be shown that by grouting the foundation soil, the settlement of a building can be reduced following earthquake loading. However, the grouting depth must extend the whole depth of the liquefiable layer to achieve this reduction in settlements.
Resumo:
This paper describes four centrifuge tests investigating the performance of non-structural inclined micro-piles as a liquefaction remediation method for existing buildings. Two soil profiles with the same superstructure founded on each were tested under earthquakes of different magnitudes and durations. The first profile consisted of a deep, homogeneous layer of loose, liquefiable sand. The second comprised a shallow layer of loose sand overlying dense sand. Centrifuge tests were carried out with and without inclined micro-piles in each soil profile. The superstructure was modelled as an idealised single degree of freedom (SDOF) system. It is found that the micro-piles have no detrimental effect on the performance of the structure during and after earthquakes. It is also possible that their presence may decrease structural settlements in earthquakes which cause liquefaction to a depth less than that of the improved zone. However, no conclusive evidence is obtained to show that the micro-piles significantly restrain lateral soil movement due to monotonic shearing from the structure or impede the migration of excess pore pressures from the free field to the foundation zone. Both these processes have critical effects on structural settlement. The use of inclined micro-piles for liquefaction remediation should therefore be considered with caution.
Resumo:
This study deals with seasonal variations, natural correlations and similarities of fouling assemblages on exposure panels in the Suez Bay during January 1992 to January 1993. Three main sources of pollutions flow into the bay; industrial waste products, domestic drainage of Suez city and ships' oil and refuse.The fouling assemblages on the test pan els after various periods (1, 2 and 3 months) belonged mainly to the algae (Ulva rigida), polychaetes (Hydroides elegans), Cirripedes (Balanus amphitrite) and amphipods. The fouling at the lst station was relatively more dense than at the 2nd station during the summer and autumn seasons. The lowest productivity was achieved at the 3rd station which was considered less polluted being offshore water. The overall paucity of fouling in the bay is because of the silt covering the submerged surfaces, particularly at the 2nd station, leading to the prevention of the settlements or establishment of fouling organisms. The seasonal changes in the intensity of fouling assemblages on submerged surfaces in seawater seems to be closely related to seasonal variations in water temperature. The great fouling communities on the buoys and long exposure panels showed a remarkable variety of species and density rather than on short term exposures, which were more dense during warmer months.
Resumo:
Many piled foundations have been destroyed under significant cyclic loads in earthquakes. Centrifuge modelling of a single pile subjected to cyclic loads has been conducted to investigate the influence of cyclic loads on the axial performance of the single pile. Different pile installation procedures were applied to compare the axial behaviour of different piles under cyclic loads. Pile head permanent settlements accumulated due to cyclic axial loads, and these increased with the increasing load amplitude. Also the pile head axial secant stiffness decreased with the increasing number of axial load cycles, and with increasing amplitude. Furthermore, the axial pile performance is influenced significantly by different installation methods. © 2010 ASCE.
Resumo:
Many typical liquefaction remediation techniques are not appropriate for application under existing buildings and more novel techniques are required. This paper describes centrifuge tests investigating the performance of cementation as a liquefaction remediation method. Two soil profiles with the same superstructure were tested under earthquake shaking. The first profile consisted of a deep layer of loose, liquefiable sand. The second comprised a shallow layer of loose sand overlying dense sand. Centrifuge tests were carried out with a cemented zone underneath the structure, through the full depth of the liquefiable layers and also partial depth. The superstructure was modelled as a single-degree-offreedom system. It is found that a cemented zone through the full depth of a liquefiable layer results in considerable reduction of structural settlements. Increased magnitude and higher frequency accelerations are transmitted to the structure but, depending on the building characteristics, it is likely that improved overall seismic performance can be achieved. Improvements in structural settlements can also be obtained with partialdepth remediation, if the depth of the cemented zone is greater than the depth of liquefaction. This type of remediation seems to have little effect on the accelerations transmitted to the structure.
Resumo:
The Fort Canning Tunnel is the first road tunnel in Singapore to be built using the sprayed concrete lining (SCL) method. The major technical challenge of this was to construct a 15m wide tunnel by mining in soft ground under a shallow overburden of 3m to 9m. This paper describes the geotechnical investigations and monitoring controls for the safe and progressive execution of the works, such as soil investigations, trial forepoling works, surface settlement monitoring, tunnel settlement monitoring, face movement monitoring, and the observational approach to construction. The monitored field data showed the volume loss to range from 0.4% to 2.1%, and the observed surface settlement trough was found to agree well with the theoretical Gaussian trough. Other observations made include substantial surface settlements induced by the stress relief at and ahead of the tunnel face in spite of the forepoling umbrella, and the higher volume losses associated with higher overburden. Tunnel face movements were observed during installation of forepoling. These observations are of interest to engineers planning future SCL tunnels in similar conditions.
Resumo:
Various countries have formulated special integrated coastal zone management (ICZM) strategies which seek to both manage development and conserve natural resources and integrate and coordinate the relevant people sectors and their functions and roles within the bounds of this rich realm. Concerns that may be addressed by ICZM include: 1) Natural resources degradation; 2) Pollution; 3) Land use conflicts; and, 4) Destruction of life and property by natural hazards. Some prevalent sources of environmental impacts (livelihoods) are listed, together with some recommendations to the concerns which they may raise in relation to coastal zone management: agriculture; aquaculture; fisheries; forestry; human settlements; tourism; and, transport industry.
Resumo:
A case study of the response of two buildings to the construction of a 12 m diameter tunnel excavated by conventional method, in Italy, is studied. The 12 m diameter tunnel was constructed carrying out reinforcement of the tunnel face and around the crown prior to excavation and installation of the temporary sprayed concrete lining and the permanent reinforced concrete lining. Reflective prisms, placed at first floor level around the perimeter of the building facades, allowed building settlements to be measured. Ground settlements between the two buildings were measured using BRE type settlement studs. Extensive protective measures were adopted to maintain stability of the tunnel excavation and to reduce ground movements. The number of horizontal jet grout columns installed into the tunnel face was reduced over the course of the project. Results from CPT tests indicate that the undrained shear strength at the tunnel axis is around 120 kPa. SPT and undrained unconsolidated (UU) triaxial tests indicate lower strengths of around 80 kPa, although this may be due to sample disturbance.
Resumo:
Fishing communities that have exploited the resource for generations constitute the main stakeholder groups in the fisheries of Lake Victoria. Several studies have examined Uganda's Lake Victoria fishing communities and characterised key stakeholders at community level over the last decade (SEDAWOG 1999a and b; Geheb 1997; FeSEP 1997; Kitakule 1991). The communities are made up of scattered settlements at the shores and on islands. The categories of people living in these communities include fishers who consist primarily of large numbers of male youths who provide labour to boat and gear owners. There are resident and non-resident fish traders who after securing their supplies at the beaches, depart for their market destinations. In addition, there are fish processors, mostly operating traditional and improved smoking kilns. Many other people, dealing in provisions and supplies also stay at the beaches, their activities depending on the level of fish catch. The fishing communities of Lake Victoria, Uganda, include auxiliary livelihood activities such as boat building, net repairing and transportation; bait supply and beachside kiosks, video halls and retail shop business. Other economic activities are brick making, charcoal burning/wood trade, farming and livestock keeping.
Resumo:
Of all the great lakes, Lake Victoria has the highest population concentration on its fringes. This has resulted into serious human impacts on the ecosystem through intense agricultural activities (cultivation, livestock and over fishing), sporadic settlements, urbanization and industrial establishments. The consequences have been loss of animals and plant life, deforestation and general land degradation, pollution, loss of water quality and clean air. Aquatic life has become endangered and less guaranteeing to continued fish production. Awareness workshops and general talks have been done to a few selected communities by the lakes landing sites and in the catchment area to mitigate the deteriorating environmental conditions. Naturally the situation calls for reversal to the increasing stress of the ecosystem. As a result, every water body surveyed put forward some mitigation suggestions
Resumo:
The north-south line in Amsterdam is being built underneath the historic centre of the city. Three deep stations are being constructed in deep excavations supported by diaphragm walls. During the excavation for Vijzelgracht station, leakage through the wall resulted in large settlements and damage to historic buildings, which threatened continuation of the project. The authors analysed the cause of the leakage and the damage to the buildings. With the application of robust preventative measures at two of the deep excavations it was possible to continue the project. This paper reports on the cause of the events, the damage to the buildings and the counter-measures taken. It includes lessons learned for the project and for the foundations industry.
Resumo:
A large database of 115 triaxial, direct simple shear, and cyclic tests on 19 clays and silts is presented and analysed to develop an empirical framework for the prediction of the mobilization of the undrained shear strength, cu, of natural clays tested from an initially isotropic state of stress. The strain at half the peak undrained strength (γM=2) is used to normalize the shear strain data between mobilized strengths of 0.2cu and 0.8cu. A power law with an exponent of 0.6 is found to describe all the normalized data within a strain factor of 1.75 when a representative sample provides a value for γM=2. Multi-linear regression analysis shows that γM=2 is a function of cu, plasticity index Ip, and initial mean effective stress p′0. Of the 97 stress-strain curves for which cu, Ip, and p′0 were available, the observed values of γM=2 fell within a factor of three of the regression; this additional uncertainty should be acknowledged if a designer wished to limit immediate foundation settlements on the basis of an undrained strength profile and the plasticity index of the clay. The influence of stress history is also discussed. The application of these stress-strain relations to serviceability design calculations is portrayed through a worked example. The implications for geotechnical decision-making and codes of practice are considered.
Resumo:
This paper examines the settlement of instrumented 2 × 2 model pile groups in liquefiable soil based on the results of dynamic centrifuge tests. The piles are end-bearing in dense sand, and are instrumented such that base, shaft and total pile load components can be measured. The data suggest that the overall co-seismic group settlement is accrued from incremental settlements of the individual piles as the group rocks under the action of the kinematic and inertial lateral loads. A Newmarkian framework for describing this behaviour is presented in which permanent settlement is incremented whenever the load in any of the piles exceeds the capacity of the soil to support the pile. This bearing capacity of the piles in liquefied soil is estimated based on measured dynamic soil properties during shaking and observations of the changes in load carried by the piles. The contribution of the pile cap in reducing settlement is also discussed. © 2008 ASCE.
Resumo:
Underground space is commonly exploited both to maximise the utility of costly land in urban development and to reduce the vertical load acting on the ground. Deep excavations are carried out to construct various types of underground infrastructure such as deep basements, subways and service tunnels. Although the soil response to excavation is known in principle, designers lack practical calculation methods for predicting both short- and long-term ground movements. As the understanding of how soil behaves around an excavation in both the short and long term is insufficient and usually empirical, the judgements used in design are also empirical and serious accidents are common. To gain a better understanding of the mechanisms involved in soil excavation, a new apparatus for the centrifuge model testing of deep excavations in soft clay has been developed. This apparatus simulates the field construction sequence of a multi-propped retaining wall during centrifuge flight. A comparison is given between the new technique and the previously used method of draining heavy fluid to simulate excavation in a centrifuge model. The new system has the benefit of giving the correct initial ground conditions before excavation and the proper earth pressure distribution on the retaining structures during excavation, whereas heavy fluid only gives an earth pressure coefficient of unity and is unable to capture any changes in the earth pressure coefficient of soil inside the zone of excavation, for example owing to wall movements. Settlements of the ground surface, changes in pore water pressure, variations in earth pressure, prop forces and bending moments in the retaining wall are all monitored during excavation. Furthermore, digital images taken of a cross-section during the test are analysed using particle image velocimetry to illustrate ground deformation and soil-structure interaction mechanisms. The significance of these observations is discussed.
Resumo:
Half of the world’s urban population will live in informal settlements or “slums” by 2030. Affordable urban sanitation presents a unique set of challenges as the lack of space and resources to construct new latrines makes the de-sludging of existing pits necessary and is something that is currently done manually with significant associated health risks. Therefore various mechanised technologies have been developed to facilitate pit emptying, with the majority using a vacuum system to remove material from the top of the pit. However, this results in the gradual accumulation of unpumpable sludge in the pit, which eventually fills the latrine and forces it to be abandoned. This study has developed a method for fluidising unpumpable pit latrine sludge, based on laboratory experiments using a harmless synthetic sludge. Such a sludge consisting of clay and compost was developed to replicate the physical characteristics of pit latrine sludges characterised in Botswana during the 1980s. Undrained shear strength and density are identified as the critical parameters in controlling pumpability and a method of sludge characterisation based on these parameters is reported. In a series of fluidisation tests using a one fifth scale pit emptying device the reduction in sludge shear strength was found to be caused by i) dilution, which increases water content, and ii) remoulding, which involves mechanical agitation to break down the structure of the material. The tests demonstrated that even the strongest of sludges could be rendered “pumpable” by sufficient dilution. Additionally, air injection alone produced a three-fold decrease in strength of consolidated samples as a result of remoulding at constant water content. The implications for sludge treatment and disposal are discussed, and the classification of sludges according to the equipment required to remove them from the latrine is proposed. Possible field tests to estimate sludge density and shear strength are suggested. The feasibility of using low cost vacuum cleaners to replace expensive vane pumps is demonstrated. This offers great potential for the development of affordable pit emptying technologies that can remove significantly stronger sludges than current devices through fluidising the wastes at the bottom of the pit before emptying