1000 resultados para revenue protection


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Manufactured nanoparticles are introduced into industrial processes, but they are suspected to cause similar negative health effects as ambient particles. The poor knowledge about the scale of this introduction did not allow global risk analysis so far. In 2006 a targeted telephone survey among Swiss companies (1) showed the usage of nanoparticles in a few selected companies but did not provide data to extrapolate on the totality of the Swiss workforce. To gain this kind of information a layered representative questionnaire survey among 1'626 Swiss companies was conducted in 2007. Data was collected about the number of potentially exposed persons in the companies and their protection strategy. The response rate was 58.3%. An expected number of 586 companies (95%−confidence interval 145 to 1'027) was shown by this study to use nanoparticles in Switzerland. Estimated 1'309 (1'073 to 1'545) workers do their job in the same room as a nanoparticle application. Personal protection was shown to be the predominant type of protection means. Companies starting productions with nanomaterials need to consider incorporating protection measures into the plans. This will not only benefit the workers' health, but will also likely increase the competitiveness of the companies. Technical and organisational protection means are not only more cost−effective on the long term, but are also easier to control. Guidelines may have to be designed specifically for different industrial applications, including fields outside nanotechnology, and adapted to all sizes of companies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Previous studies have associated activating Killer cell Immunoglobulin-like Receptor (KIR) genes with protection from cytomegalovirus (CMV) replication after organ transplantation. Whether KIR-associated protection is operating in the context of primary infection, re-activation, or both, remains unknown. Here we correlated KIR genotype and CMV serostatus at the time of transplantation with rates of CMV viremia in 517 heart (n=57), kidney (n=223), liver (n=165) or lung (n=72) allograft recipients reported to the Swiss Transplant Cohort Study. Across the entire cohort we found B haplotypes-which in contrast to A haplotypes may contain multiple activating KIR genes-to be protective in the most immunosuppressed patients (receiving anti-thymocyte globulin induction and intensive maintenance immunosuppression) (hazard ratio after adjustment for covariates 0.46, 95% confidence interval 0.29-0.75, P=0.002). Notably, a significant protection was detected only in recipients who were CMV-seropositive at the time of transplantation (HR 0.45, 95% CI 0.26-0.77, P=0.004), but not in CMV seronegative recipients (HR 0.59, 95% CI 0.22-1.53, P=0.28). These data indicate a prominent role for KIR-and presumably natural killer (NK) cells-in the control of CMV replication in CMV seropositive organ transplant recipients treated with intense immunosuppression.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives: The purpose of this study was to analyze the debris captured in the distal protection filters used during carotid artery stenting (CAS). Background: CAS is an option available to high-risk patients requiring revascularization. Filters are suggested for optimal stroke prevention during CAS. Methods: From May 2005 to June 2007, filters from 59 asymptomatic patients who underwent CAS were collected and sent to a specialized laboratory for light-microscope and histological analysis. Peri- and postprocedural outcomes were assessed during 1-year follow-up. Results: On the basis of biomedical imaging of the filter debris, the captured material could not be identified as embolized particles from the carotid plaque. On histological analysis the debris consisted mainly of red blood cell aggregates and/ or platelets, occasionally accompanied by granulocytes. We found no consistent histological evidence of embolized particles originating from atherosclerotic plaques. Post-procedure, three neurological events were reported: two (3.4%) transient ischemic attacks (TIA) and one (1.7%) ipsilateral minor stroke. Conclusion: The filters used during CAS in asymptomatic patients planned for cardiac surgery often remained empty. These findings may be explained by assuming that asymptomatic patients feature a different atherosclerotic plaque composition or stabilization through antiplatelet medication. Larger, randomized trials are clearly warranted, especially in the asymptomatic population. © 2012 Wiley Periodicals, Inc.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gaming revenue report from Department Inspect

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gaming revenue report from Department Inspect

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gaming revenue report from Department Inspect

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gaming revenue report from Department Inspect

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are a few basic fundamentals you need before starting a source water protection project. These include information on your community’s wells (or intakes), aquifer, source water area, and potential contaminants. All of these essential items should be included in your community’s source water information, you may find this information in the workbook and guidebook.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are a few basic fundamentals you need before starting a source water protection project. These include information on your community’s wells (or intakes), aquifer, source water area, and potential contaminants. All of these essential items should be included in your community’s source water information, you may find this information in the workbook and guidebook.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The pmpose of the Watershed Improvement Fund is to enhance the water quality and flood prevention efforts in the state through a variety of impairment-based, locally­ directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enlmnce the water quality and flood prevention efforts in the state through a variety of impairment-based, locally­ directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest eamed on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.