930 resultados para payment


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper analyzes two claims that have been made about the Target2 payment system. The first one is that this system has been used to support unsustainable current account deficits of Southern European countries. The second one is that the large accumulation of Target2 claims by the Bundesbank represents an unacceptable risk for Germany if the eurozone were to break up. We argue that these claims are unfounded. They also lead to unnecessary fears in Germany that make a solution of the eurozone crisis more difficult. Ultimately, this fear increases the risk of a break-up of the eurozone. Or to paraphrase Franklin Roosevelt, what Germany should fear most is simply its own fear.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Extensive prior research on the economics of European monetary union highlighted some potential risks (the known unknowns) but overlooked others (the unknown unknowns). Asymmetries among participating countries, the potentially destabilising character of a one-size-fits all monetary policy, the weakness of adjustment mechanisms, the lack of incentives for fiscal discipline, the possibility of sovereign solvency crises and their adverse consequences were all known and understood. But policymakers often relied on a complacent reading of the evidence. • The potential for financial disruption was vastly underestimated. Economists generally did not consider, or underestimated, the possibility of balance of payment crises such as those experienced by southern European countries, or the risk of a feedback loop between banks and sovereigns. • Remedying EMU’s systemic deficiencies is on the policy agenda. Banking union would go a long way towards addressing the fault lines. The urgent question for economists is if it is going to be enough and, if not, what else should complement the ‘bare-bones’ EMU of Maastricht.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Cash retention is a common means of protecting an employer from a contractor's insolvency as well as ensuring that contractors finish the work that they start. Similarly, contractors withhold part of payments due to their sub-contractors. Larger contracts tend to be subjected to smaller rates of retention. By calculating the cost of retention as an amount per year of a contract, it is shown that retention is far more expensive for firms whose work consists of short contracts. The extra cost is multiplied when the final payment is delayed, as it often is for those whose work takes place at the beginning of a project. This may explain why it is that main contractors are a lot less interested than sub-contractors in alternatives to cash retention, such as retention bonds

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies" financial structures and the payment regimes to which they are subjected.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies’ financial structures and the payment regimes to which they are subjected.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Under the bond scheme, a pre-determined series of payments would compensate farmers for lost revenues resulting from policy change. Unlike the Single Payment Scheme, payments would be fully decoupled: recipients would not have to retain farmland, or remain in agriculture. If vested in a paper asset, the guaranteed, unencumbered, income stream would be similar to that from a government bond. Recipients could exchange this for a capital sum reflecting the net present value of future payments, and reinvest in other business ventures, either on- or offfarm.With a finite, declining flow of payments, budget expenditure would reduce, releasing funds for other uses.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Progress in the Doha Round is assessed against the changes to the common agricultural policy (CAP) brought about by the Fischler reforms of 2003-2004, and that proposed for sugar. An elimination of export subsidies could place EU exports of processed foods at a competitive disadvantage because of high sugar and milk prices. Provided the single payment scheme falls within the green box, the likely new limits on domestic support should not be problematic for the post-Fischler CAP. However, an ambitious market access package could open up EU markets and bring pressure for further reform. If there is no Doha agreement, existing provisions will continue to apply, but without the protection of the Peace Clause; and increased litigation is likely. Further CAP reform is to be expected.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Since the early 1990s the EU's CAP has undergone considerable change with, first, a switch from market price support to direct payments in 1992 and, second, a further decoupling of support with the creation of the single payment scheme in 2003. Nonetheless, whether the current Doha Round of WTO trade negotiations is successfully completed or not, the CAP will come under renewed scrutiny, as a result either of negotiated reductions in support or of litigation through the WTO's dispute settlement process. This article discusses CAP market price and income support in the context of these likely WTO constraints.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 2003, the EU agreed a major reform of the common agricultural policy (CAP). Its centrepiece was a new Single Payment Scheme (SPS). Policy concerns at the time involved the budget, EU enlargement to the East, the WTO negotiations, and a perception (articulated by Commissioner Fischler) that there should be a shift of budget funds from CAP's Pillar 1 (price and income support) to Pillar 2 (rural development). We outline these concerns, conclude that the WTO was the main driving force of the reforms, set out the key parameters of the new support scheme, and outline some thoughts on the durability of the reformed CAP in the face of continued internal and external pressures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main aim of this study was to ascertain and discuss the current challenges and opportunities facing construction contractors in Ghana. This involved a review of the economic, legal and political environments in which contractors in Ghana operate; a review of published studies on construction in developing countries generally and Ghana specifically; and in-depth interviews and discussions with seven building and civil engineering contractors in Ghana in 2009 and 2010. Six road contractors were also interviewed. The findings indicate significant challenges relating mainly to financing for projects and a harsh business environment. However, most contractors interviewed admitted to significant problems in their own organisations. It is clear that the contracting environment in Ghana is harsh particularly for local contractors who are often not paid on time and without compensation for late payment. However, local construction firms in Ghana who want to breakthrough ought to formulate the right strategic plans, develop innovative business strategies, develop professionalism, and merge with local firms with similar organisational values and characteristics. In short, local or indigenous Ghanaian contractors ought to face up to the reality of competition and the dynamics of modern business in order to survive, grow and become major players in the construction industry in Ghana.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The notification of the level of domestic support to the World Trade Organization (WTO) is intended to reflect compliance with obligations entered into at the time of the Uruguay Round. WTO members have often been slow to provide notification of domestic support levels. This makes the process of notification less useful as an indicator of the degree to which changes in policy have or have not benefited the trade system as a whole and exporting countries in particular. The notification of domestic support in the E.U. illustrates the value of a measure that reflects current policies and can therefore act as a basis for negotiation of further disciplines where these are necessary. The E.U. has made major changes in its Common Agricultural Policy (CAP) over the period since 1992 when the MacSharry reforms were implemented. Payments originally notified in the blue box (related to supply control) have over time been changed until in their present form they are unrelated to current production or price levels, and hence can satisfy the criteria for the green box. The E.U. has therefore much more latitude in trade talks to agree to reductions in the allowable trade-distorting support. This paper reproduced the E.U. notifications relating to 2003/04 and extends these with official statistics to the year 2006/07. It then projects forward the components of domestic support until the year 2013/14, based on forecasts of future production and estimates of policy parameters. The impact of a successful Doha Round is simulated, showing that the constraints envisaged in the WTO draft modalities document of May 19, 2008, would be binding by the year 2013, at about the time the next budget cycle in the E.U. starts. Without the Doha Round constraints, further reform might still happen for domestic reasons, but the framework provided by the WTO for domestic policy spending would be less relevant. In that case, much could hinge on the legitimacy of the Single Farm Payment system under the current rules governing the green box.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study investigated the potential application of mid-infrared spectroscopy (MIR 4,000–900 cm−1) for the determination of milk coagulation properties (MCP), titratable acidity (TA), and pH in Brown Swiss milk samples (n = 1,064). Because MCP directly influence the efficiency of the cheese-making process, there is strong industrial interest in developing a rapid method for their assessment. Currently, the determination of MCP involves time-consuming laboratory-based measurements, and it is not feasible to carry out these measurements on the large numbers of milk samples associated with milk recording programs. Mid-infrared spectroscopy is an objective and nondestructive technique providing rapid real-time analysis of food compositional and quality parameters. Analysis of milk rennet coagulation time (RCT, min), curd firmness (a30, mm), TA (SH°/50 mL; SH° = Soxhlet-Henkel degree), and pH was carried out, and MIR data were recorded over the spectral range of 4,000 to 900 cm−1. Models were developed by partial least squares regression using untreated and pretreated spectra. The MCP, TA, and pH prediction models were improved by using the combined spectral ranges of 1,600 to 900 cm−1, 3,040 to 1,700 cm−1, and 4,000 to 3,470 cm−1. The root mean square errors of cross-validation for the developed models were 2.36 min (RCT, range 24.9 min), 6.86 mm (a30, range 58 mm), 0.25 SH°/50 mL (TA, range 3.58 SH°/50 mL), and 0.07 (pH, range 1.15). The most successfully predicted attributes were TA, RCT, and pH. The model for the prediction of TA provided approximate prediction (R2 = 0.66), whereas the predictive models developed for RCT and pH could discriminate between high and low values (R2 = 0.59 to 0.62). It was concluded that, although the models require further development to improve their accuracy before their application in industry, MIR spectroscopy has potential application for the assessment of RCT, TA, and pH during routine milk analysis in the dairy industry. The implementation of such models could be a means of improving MCP through phenotypic-based selection programs and to amend milk payment systems to incorporate MCP into their payment criteria.