954 resultados para mesocosm facility
Resumo:
Silver Bow Creek (SBC) flows into the Warm Springs Ponds Operable Unit (WSPOU), where various containment cells are used to precipitate copper and other metals (e.g., Cd, Cu, Mn, Pb, Zn). Lime is added seasonally to increase the pH and assist in removal of metals from the water column. Although the WSPOU is effective at removing copper and other cationic trace metals, concentrations of dissolved arsenic exiting the facility are often above the site specific standard, 20 20 ug/L, during low-flow periods each summer and fall. This thesis is a continuation of arsenic geochemistry studies by Montana Tech in the WSPOU. Field work focused on Pond 3, the largest and first in the series of treatment ponds. Shallow groundwater was sampled from 8 PVC piezometers located near the south end of Pond 3. Three sediment pore-water diffusion samplers (“peepers”) were also deployed at the south end of Pond 3 to examine vertical gradients in chemistry in the top 25 cm of the pond sediment. In general, the pH and Eh values of the shallow groundwater and sediment pore-water were less than in the pond water. Concentrations of arsenic were generally higher in subsurface water, and tended to pass through a maximum (up to 530 g/L) about 10 cm below the sediment-water interface. In the peeper cells, there was a strong positive correlation between dissolved As and dissolved Fe, and an inverse correlation with sulfate. Therefore, the zone of arsenic release corresponds to a zone of bacterial Fe and sulfate reduction in the shallow, organic-rich sediment. Redox speciation of arsenic shows that arsenate (As(V)) is dominant in the pond, and arsenite (As(III)) is dominant in the subsurface water. A series of laboratory experiments with pH adjustment were completed using SBC water collected near the inlet to the WSPOU as well as water and shallow sediment collected from Pond 3. Water ± sediment mesocosms were set up in 1-L Nalgene bottles (closed system) or a 20-L aquarium (open system), both with continuous stirring. The pH of the mesocosm was adjusted by addition of NaOH or HNO3 acid. The closed system provided better pH control since the water was not in contact with the atmosphere, which prevented exchange of carbon dioxide. In both the closed and open systems, dissolved arsenic concentrations either decreased or stayed roughly the same with increase in pH to values > 11. Therefore, the release of dissolved As into the treatment ponds in low-flow periods is not due to changes in pH alone. All of these results support the hypothesis that the arsenic release in WSPOU is linked to microbial reduction of ferric oxide minerals in the organic-rich sediment. Upwards diffusion of dissolved As from the sediment pore-water into the pond water is the most likely explanation for the increase in As concentration of the WSPOU in low-flow periods.
Resumo:
Shippers want to improve their transportation efficiency and rail transportation has the potential to provide an economical alternative to trucking, but it also has potential drawbacks. The pressure to optimize transportation supply chain logistics has resulted in growing interest in multimodal alternatives, such as a combination of truck and rail transportation, but the comparison of multimodal and modal alternatives can be complicated. Shippers in Michigan’s Upper Peninsula (UP) face similar challenges. Adding to the challenge is the distance from major markets and the absence of available facilities for transloading activities. This study reviewed three potential locations for a transload facility (Nestoria, Ishpeming, and Amasa) where truck shipments could be transferred to rail and vice versa. These locations were evaluated on the basis of transportation costs for shippers when compared to the use of single mode transportation by truck to Wisconsin, Chicago, Minneapolis, and Sault Ste. Marie. In addition to shipping costs, the study also evaluated the potential impact of future carbon emission penalties on the shipping cost and the effects of changing fuel prices on shipping cost. The study used data obtained from TRANSEARCH database (2009) and found that although there were slight differences between percent savings for the three locations, any of them could provide potential benefits for movements to Chicago and Minneapolis, as long as final destination could be accessed by rail for delivery. Short haul movements of less than 200 miles (Wisconsin and Sault Ste. Marie) were not cost effective for multimodal transport. The study also found that for every dollar increase in fuel price, cost savings from multimodal option increased by three to five percent, but the inclusion of emission costs would only add one to two percent additional savings. Under a specific case study that addressed shipments by Northern Hardwoods, the most distant locations in Wisconsin would also provide cost savings, partially due to the possibility of using Michigan trucks with higher carrying capacity for the initial movement from the facility to transload location. In addition, Minneapolis movements were found to provide savings for Northern Hardwoods, even without final rail access.
Resumo:
The “Quincy & Torch Lake Railroad Engine House Facility Management and Interpretive Plan" was designed to serve as a guide to aid the Quincy Mine Hoist Association in their efforts to restore and interpret historic railroad resources under their stewardship. Early searches for existing management and interpretive plans demonstrated that similar plans were primarily produced by the National Park Service and were intended to guide large scale heritage sites that consist of a variety of cultural resources. This project adapts concepts found in those large scale management and interpretive site plans, to guide small scale site management, restoration, and interpretive projects. The document presents a three stage, second phase restoration process. Each stage of development is guided by a series of management and interpretive goals and objectives which were set for the engine house facility.
Resumo:
This gives statistics on the escapes from South Carolina correctional facilities from 1990 to 2016.
Resumo:
This flow chart shows the steps to go through to obtain a construction permit from DHEC.
Resumo:
This document shows the operations per year for airports in South Carolina broken down by air taxi, local, itin, military and totals.
Resumo:
This document shows the operations per year for airports in South Carolina broken down by air taxi, local, itin, military and totals.
Resumo:
This is a list of airports in South Carolina and the kinds of planes that are based there. It is broken down by facility name, FAA ID, type, single, multi, jet, helicopter, glider, military and ultralight.
Resumo:
This is a list of airports in South Carolina and the kinds of planes that are based there. It is broken down by facility name, FAA ID, type, single, multi, jet, helicopter, glider, military and ultralight.
Resumo:
Phragmites australis (Cav.) Trin. ex Steud. is a hydrophyte particularly resistant to harsh conditions, e.g. drought, high salinity, contaminants, such as heavy metals and toxic molecules, and high nutrients concentrations. These resistances render the plant suitable for water depuration, where its particular metabolism is exploited to remove pollutants and excessive nutrients from the environment. In constructed wetlands, this principle is applied to phyto-purify wastewater with various origins, such as industrial, agricultural and household, with the aim to improve its quality to an extent which would render its reuse possible. In the framework of a pre-existing project of Department of Agricultural and Food Sciences (DiSTAl), this work integrates the knowledge and data relative to an Emilia Romagna (IT) constructed wetland plant, in order to expand the knowledge about this particular facility and of the system in general. By assaying antioxidants, both non- enzymatic and enzymatic, chlorophylls content and net photosynthetic rates, and by measuring the elemental composition of the specimens, the health status and the elemental uptake of the wetland plants sampled in different areas were investigated. The results were compared amongst the examined specimens with the aim to detect areas where there may be a higher stress due to a different wastewater composition, potentially varying along the constructed route. In addition, different parameters regarding the extraction and assay protocols were investigated, in order to optimise the procedure and to select the best conditions to perform the analyses, as well as to integrate information missing in literature or found as contradictory.
Resumo:
This thesis deals with the sizing and analysis of the electrical power system of a petrochemical plant. The activity was carried out in the framework of an electrical engineering internship. The sizing and electrical calculations, as well as the study of the dynamic behavior of network quantities, are accomplished by using the ETAP (Electrical Transient Analyzer Program) software. After determining the type and size of the loads, the calculation of power flows is carried out for all possible network layout and different power supply configurations. The network is normally operated in a double radial configuration. However, the sizing must be carried out taking into account the most critical configuration, i.e., the temporary one of single radial operation, and also considering the most unfavorable power supply conditions. The calculation of shortcircuit currents is then carried out and the appropriate circuit breakers are selected. Where necessary, capacitor banks are sized in order to keep power factor at the point of common coupling within the preset limits. The grounding system is sized by using the finite element method. For loads with the highest level of criticality, UPS are sized in order to ensure their operation even in the absence of the main power supply. The main faults that can occur in the plant are examined, determining the intervention times of the protections to ensure that, in case of failure on one component, the others can still properly operate. The report concludes with the dynamic and stability analysis of the power system during island operation, in order to ensure that the two gas turbines are able to support the load even during transient conditions.
Resumo:
In this work the archaea and eubacteria community of a hypersaline produced water from the Campos Basin that had been transported and discharged to an onshore storage facility was evaluated by 16S recombinant RNA (rRNA) gene sequence analysis. The produced water had a hypersaline salt content of 10 (w/v), had a carbon oxygen demand (COD) of 4,300 mg/l and contains phenol and other aromatic compounds. The high salt and COD content and the presence of toxic phenolic compounds present a problem for conventional discharge to open seawater. In previous studies, we demonstrated that the COD and phenolic content could be largely removed under aerobic conditions, without dilution, by either addition of phenol degrading Haloarchaea or the addition of nutrients alone. In this study our goal was to characterize the microbial community to gain further insight into the persistence of reservoir community members in the produced water and the potential for bioremediation of COD and toxic contaminants. Members of the archaea community were consistent with previously identified communities from mesothermic reservoirs. All identified archaea were located within the phylum Euryarchaeota, with 98 % being identified as methanogens while 2 % could not be affiliated with any known genus. Of the identified archaea, 37 % were identified as members of the strictly carbon-dioxide-reducing genus Methanoplanus and 59 % as members of the acetoclastic genus Methanosaeta. No Haloarchaea were detected, consistent with the need to add these organisms for COD and aromatic removal. Marinobacter and Halomonas dominated the eubacterial community. The presence of these genera is consistent with the ability to stimulate COD and aromatic removal with nutrient addition. In addition, anaerobic members of the phyla Thermotogae, Firmicutes, and unclassified eubacteria were identified and may represent reservoir organisms associated with the conversion hydrocarbons to methane.
Resumo:
The aim of this study was to estimate barite mortar attenuation curves using X-ray spectra weighted by a workload distribution. A semi-empirical model was used for the evaluation of transmission properties of this material. Since ambient dose equivalent, H(⁎)(10), is the radiation quantity adopted by IAEA for dose assessment, the variation of the H(⁎)(10) as a function of barite mortar thickness was calculated using primary experimental spectra. A CdTe detector was used for the measurement of these spectra. The resulting spectra were adopted for estimating the optimized thickness of protective barrier needed for shielding an area in an X-ray imaging facility.
Resumo:
The treatment of subglottic stenosis in children remains a challenge for the otolaryngologist and may involve procedures such as endoscopy, open surgery, and often both. In the recent past, high-pressure balloons have been used in endoscopic treatment due to their relative facility and high success rates. To report success rates in the treatment of acquired subglottic stenosis with balloon laryngoplasty in children and identify predictive factors for the success of the technique and its complications. Descriptive, prospective study of children who were diagnosed with acquired subglottic stenosis and underwent balloon laryngoplasty as the primary treatment. Balloon laryngoplasty was performed in 48 children with an average age of 20.7 months: 31 presented with chronic subglottic stenosis and 17 with acute stenosis. Success rate was 100% for acute and 39% for chronic subglottic stenosis. Success was significantly associated with several factors, including recently acquired stenosis, initial grade of stenosis, younger patient age, and the absence of tracheotomy. Complications were transitory dysphagia observed in three children and a submucosal cyst in one of the patients. Balloon laryngoplasty may be considered as a first line of treatment for acquired subglottic stenosis. In acute cases, the success rate was 100%, and even though results are less promising in chronic cases, complications were not significant and the patients can undergo open surgery without contraindications. Predictive factors of success were acute stenosis, less severe grades of stenosis, younger patient age, and the absence of tracheotomy.