958 resultados para guard-rail
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.
Resumo:
Since the introduction of expanded levels of intrastate service on October 30, 2006, Amtrak trains in Illinois have produced impressive gains in both ridership and ticket revenue. This success and continuing stakeholder support has given rise to a formal request from the Illinois Department of Transportation (“Ill. DOT”) to Amtrak to develop a feasibility study regarding possible service consisting of a morning and an evening train in each direction between Chicago and the Quad Cities. The area between Chicago and the Quad Cities includes many rapidly growing communities. From Chicago toward the West and South, many towns and cities have experienced double digit growth increases in population since the year 2000. Southern DuPage, Cook and Will counties have seen especially strong growth, pressuring highway infrastructure, utilities, and schools. Community development and highway congestion are readily apparent when traveling the nearly 3 hour, 175 mile route between Chicago and the Quad Cities. As information, there are only three weekday round trip bus frequencies available between Chicago and the Quad Cities. The Quad City International Airport offers a total of 10 daily scheduled round trip flights to Chicago's O'Hare International Airport via two separate carriers flying regional jets. The Quad Cities (Davenport, Moline, Rock Island, and Bettendorf) are located along the Mississippi River. Nearly 60% of its visitors are from the Chicago area. With dozens of miles of scenic riverfront, river boating, casinos, and thousands of acres of expansive public spaces, the Quad Cities area is a major draw from both Iowa and Illinois. The huge Rock Island Arsenal, one of the largest military arsenals in the country and located along the river, is transitioning to become the headquarters of the United States First Army. As will be discussed later in the report, there is only one logical rail route through the Quad Cities themselves. The Iowa Interstate Railroad operates through the Quad Cities along the river and heads west through Iowa. The Quad Cities are considering at least three potential locations for an Amtrak station. A study now underway supported by several local stakeholders will recommend a site which will then be considered, given available local and other financial support. If Amtrak service were to terminate in the Quad Cities, an overnight storage track of sufficient length along with ample parking and certain other requirements covered elsewhere in the report would be required.
Resumo:
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail service, and promoting improved safety both on the rail system and where the rail system interacts with people and other transportation modes. The Iowa DOT has been developing railroad transportation plans since the late 1970s. The original plan was prepared in 1978 during a time of crisis in the Iowa railroad system. Several large Iowa railroad carriers had filed for bankruptcy and were reorganizing both their businesses and physical systems. The 1978 plan was a guide for determining which railroad lines the state would partner with to preserve and improve the lines. In the 1970s, 1980s and 1990s, the railroad system mileage in Iowa was reduced from about
Resumo:
The Midwest Regional Rail System is a transportation network for the 21st Century. - 3,000-mile rail network connecting Iowa with 8 other Midwest states - Significantly reduced travel times - Increase in train frequencies - Improved on-time performance
Resumo:
The 2009 Iowa Railroad System Plan details the state’s role in providing and preserving adequate, safe and efficient rail transportation services to Iowans. The plan is intended to serve as a guide for decision makers and provides a basis for future Iowa DOT policy, funding priorities and programming decisions that affect rail transportation service in Iowa. The primary purpose of the 2009 Iowa Railroad System Plan is to guide the Iowa DOT in pursuing actions that maintain and improve railroad transportation in Iowa. The plan is a component of the Iowa Statewide Transportation Plan known as “Iowa in Motion.” This plan considers railroads from an intermodal perspective. Many commodities that move by rail also move by other modes (principally trucks) during part of their journey from origin to destination. The same is true of persons who use rail passenger service to make trips and who must also rely on other modes to access rail service. Therefore, railroads are part of larger intermodal freight and passenger transportation systems.
Resumo:
This section of the 2009 Iowa Railroad System Plan provides background information for the plan, grouped by topic. The resource guide also provides users with important information about the railroad industry and Iowa’s railroad system. The major topics covered below include: • Iowa’s railroad system and carriers. • Railroad freight and Iowa’s economy. • Rail passenger service and Iowa’s economy. • The safety of Iowa’s railroad system, including network safety and security, and railroad and communication interaction.
Resumo:
This section of the 2009 Iowa Railroad System Plan provides background information for the plan, grouped by topic. The resource guide also provides users with important information about the railroad industry and Iowa’s railroad system. The major topics covered below include: • Iowa’s railroad system and carriers. • Railroad freight and Iowa’s economy. • Rail passenger service and Iowa’s economy. • The safety of Iowa’s railroad system, including network safety and security, and railroad and communication interaction.
Resumo:
The Iowa Communications Network (ICN) is the country’s premier distance learning and state government Network, committed to providing Iowans with convenient, equal access to education, government and healthcare. The Network makes it possible for Iowans, physically separated by location, to interact in an efficient, creative, and cost-effective manner. ICN provides high-speed Internet, data, video conferencing, and voice (phone) services to authorized users, under Code of Iowa, which includes: K-12 schools, higher education, hospitals, state and federal government, National Guard armories, and libraries.
Resumo:
La construcción de autovías disminuye el coste temporal del viaje por carretera, con efectos sobre la demanda del transporte por carretera. Pero, además de los efectos intramodales, existen efectos intermodales, puesto que las autovías afectan a la demanda en otros modos alternativos a la carretera. En este trabajo formulamos y contrastamos empíricamente un modelo que permite obtener resultados para evaluar el impacto de las autovías sobre la demanda de ferrocarril. Seguidamente se pronostican algunos efectos sobre la demanda ferroviaria de algunas actuaciones en infraestructuras viarias incluidas en el Plan Director de Infraestructuras (1993-2007).
Resumo:
This map shows railroad traffic usage by Iowa Rail Carriers.
Resumo:
This railroad map shows Iowa rail carriers and train speeds.
Resumo:
Meropenem, a carbapenem antibiotic displaying a broad spectrum of antibacterial activity, is administered in Medical Intensive Care Unit to critically ill patients undergoing continuous veno-venous haemodiafiltration (CVVHDF). However, there are limited data available to substantial rational dosing decisions in this condition. In an attempt to refine our knowledge and propose a rationally designed dosage regimen, we have developed a HPLC method to determine meropenem after solid-phase extraction (SPE) of plasma and dialysate fluids obtained from patients under CVVHDF. The assay comprises the simultaneous measurement of meropenem's open-ring metabolite UK-1a, whose fate has never been studied in CVVHDF patients. The clean-up procedure involved a SPE on C18 cartridge. Matrix components were eliminated with phosphate buffer pH 7.4 followed by 15:85 MeOH-phosphate buffer pH 7.4. Meropenem and UK-1a were subsequently desorbed with MeOH. The eluates were evaporated under nitrogen at room temperature (RT) and reconstituted in phosphate buffer pH 7.4. Separation was performed at RT on a Nucleosil 100-5 microm C18 AB cartridge column (125 x 4 mm I.D.) equipped with a guard column (8 x 4 mm I.D.) with UV-DAD detection set at 208 nm. The mobile phase was 1 ml min(-1), using a step-wise gradient elution program: %MeOH/0.005 M tetrabutylammonium chloride pH 7.4; 10/90-50/50 in 27 min. Over the range of 5-100 microg ml(-1), the regression coefficient of the calibration curves (plasma and dialysate) were >0.998. The absolute extraction recoveries of meropenem and UK-1a in plasma and filtrate-dialysate were stable and ranged from 88-93 to 72-77% for meropenem, and from 95-104 to 75-82% for UK-1a. In plasma and filtrate-dialysate, respectively, the mean intra-assay precision was 4.1 and 2.6% for meropenem and 4.2 and 3.7% for UK-1a. The inter-assay variability was 2.8 and 3.6% for meropenem and 2.3 and 2.8% for UK-1a. The accuracy was satisfactory for both meropenem and UK-1a with deviation never exceeding 9.0% of the nominal concentrations. The stability of meropenem, studied in biological samples left at RT and at +4 degrees C, was satisfactory with < 5% degradation after 1.5 h in blood but reached 22% in filtrate-dialysate samples stored at RT for 8 h, precluding accurate measurements of meropenem excreted unchanged in the filtrate-dialysate left at RT during the CVVHDF procedure. The method reported here enables accurate measurements of meropenem in critically ill patients under CVVHDF, making dosage individualisation possible in such patients. The levels of the metabolite UK-1a encountered in this population of patients were higher than those observed in healthy volunteers but was similar to those observed in patients with renal impairment under hemodialysis.
Resumo:
We are depleting the once seemingly endless supply of aggregate available for concrete paving in Iowa. At the present time, some parts of our state do not have locally available aggregates of acceptable quality for portland cement concrete paving. This necessitates lengthy truck and rail hauls which frequently more than doubles the price of aggregate. In some parts of the state, the only coarse aggregates available locally are "d-cracking" in nature. Iowa's recycling projects were devised to alleviate the shortage of aggregates wherever they were found to have an economic advantage. We completed our first recycling project in 1976 on a 1.4 project in Lyon county. The data collected in this project was used to schedule two additional projects in 1977. The larger of these two projects is located in Page and Taylor county on Highway #2 and is approximately 15 miles in length. This material is to be crushed and re-used in the concrete paving, it is to be reconstructed on approximately the same alignment. The second project is part of the construction of Interstate I-680 north of council Bluffs where an existing 24 foot portland cement concrete roadway is to be recycled and used as the aggregate in the slip form econocrete subbase and the portland cement concrete shoulders.
Resumo:
An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.