939 resultados para branch number
Resumo:
This act is a competitive and dynamic environment for job creators is needed to achieve our goal of 200,000 new jobs for Iowans and a 25% increase in family incomes over the next five years.
Resumo:
Purpose. To investigate the effect of the endothelin(A) receptor inhibitor BQ-123 on the retinal arteriolar vasculature in minipig retinas in normal eyes and eyes with acute branch retinal vein occlusion (BRVO). Methods. Seven healthy eyes of seven minipigs and six eyes of six minipigs with experimental BRVO were evaluated under systemic anesthesia. An intravitreal juxta-arteriolar microinjection of 30 microL BQ-123 0.61 microg/mL (pH 7.4) was performed in all but one eye from each group, into which the physiologic saline vehicle alone was injected. Vessel-diameter changes were measured with a retinal vessel analyzer. Results. In healthy minipig retinas (n = 6), arteriolar diameter (+/-SD) increased 6.19% +/- 3.55% (P < 0.05), 25.98% +/- 2.37% (P < 0.001), 23.65% +/- 1.2% (P < 0.001), and 16.84% +/- 1.95% (P < 0.001), at 1, 5, 10, and 15 minutes, respectively, after BQ-123 microinjection. Two hours after experimental BRVO (n = 5), the retinal arteriolar diameter had decreased (13.07% +/- 5.7%; P < 0.01). One, 5, 10, and 15 minutes after BQ-123 microinjection, retinal arteriolar diameter had increased by 7.14% +/- 3.3% (P < 0.01), 26.74% +/- 7.63% (P < 0.001), 23.67% +/- 6.4% (P < 0.001), and 16.09% +/- 3.41% (P < 0.001), respectively. Vehicle only injection had no vasoactive effect on physiologic or BRVO retinas. Conclusions. A significant increase in retinal arteriolar diameter was demonstrated after juxta-arteriolar BQ-123 microinjection in healthy and in acute BRVO minipig retinas. The results suggest a role for endothelin-1 in maintaining retinal basal arteriolar tone. Reversing the BRVO-related vasoconstriction by juxta-arteriolar BQ-123 microinjection could bring a new perspective to the management of BRVO.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
This order rescinds the Natural Resource Commission's (NRC) rule banning the use of traditional shot used in hunting.
Resumo:
Executive Order 17, signed by Governor Chester J. Culver on September 25, 2009, emphasizes revitalization of historic properties and cultural and entertainment districts and also supports safe and healthy work places, sustainable design and cost effective use of state resources. Specifically, the Executive Order requires that State entities managing or leasing real estate on behalf of the State shall give priority to the needs of public entities and the populations they serve consistent with the cost effective use of state revenues. It also indicates that existing resources and facilities shall be used where adequate, cost competitive and appropriate for efficient and effective current state operations.
Resumo:
This order directs the Department of Administrative Services to implement an arrangement wherby state employees may voluntarily contribute twenty percent of their health care costs.
Resumo:
Report on the Iowa Judicial Branch for the year ended June 30, 2011
Resumo:
This order directs Article IV, section 9 of the constitution of the State of Iowa provides that the Governor shall ensure the laws are faithfully executed. In this Executive Order many other Orders were resented.
Resumo:
This order when adopting regulations to protect the healthy, safety and welfare of the people of the State of Iowa, state agencies should seek to achieve statutory goals as effectively and efficiently as possible without imposing unnecessary burdens.
Resumo:
In severe and variable conditions, specialized resource selection strategies should be less fre‐ quent because extinction risks increase for species that depend on a single and unstable resource. Psithyrus (Bombus subgenus Psithyrus) are bumblebee parasites that usurp Bombus nests and display inter‐specific variation in the number of hosts they parasitize. Using a phylogenetic comparative frame‐ work, we show that Psithyrus species at higher elevations display a higher number of hosts species com‐ pared with species restricted to lower elevations. Species inhabiting high elevations also cover a larger temperature range, suggesting that species able to occur in colder conditions may benefit from recruit‐ ment from populations occurring in warmer conditions. Our results provide evidence for an 'altitudinal niche breadth hypothesis' in parasitic species, showing a decrease in the parasites' specialization along the elevational gradient, and also suggesting that Rapoport's rule might apply to Psithyrus.
Resumo:
The Federal Highway Administration (FHWA) and the Iowa and Illinois Departments of Transportation (Iowa DOT and IDOT) have identified the Selected Alternative for improving Interstate 74 (I-74) from its southern terminus at Avenue of the Cities (23rd Avenue) in Moline, Illinois to its northern terminus one mile north of the I-74 interchange with 53rd Street in Davenport, Iowa. The Selected Alternative identified and discussed in this Record of Decision is the preferred alternative identified in the Final Environmental Impact Statement (FEIS). The purpose of the proposed improvements is to improve capacity, travel reliability, and safety along I-74 between its termini, and provide consistency with local land use planning goals. The need for the proposed improvements to the I-74 corridor is based on a combination of factors related to providing better transportation service and sustaining economic development.
Resumo:
Report on the Iowa Judicial Branch – County Clerks of District Courts, a part of the State of Iowa, for the year ended June 30, 2011